Green Ambassador Fairhill/MLK Project
Community MeetingMarch 25, 2015
![Page 2: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/2.jpg)
Agenda
• Welcome and Introductions
• Project Clean Lake
Green & Gray Infrastructure
• Green Ambassador – Fairhill/MLK Project
Project Design
Construction & Community Impacts
• Questions & Discussion
![Page 3: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/3.jpg)
Northeast Ohio Regional Sewer District
355square
miles
![Page 4: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/4.jpg)
• Political subdivision of Ohio
• Created in 1972 by Court Order
– Code of Regulations
– Governed by seven Trustees
• Separate and distinct from the City of Cleveland and Cuyahoga County
Who We Are…
![Page 5: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/5.jpg)
• Sanitary & regional stormwater services to Cleveland and 61 member communities
– 1 million customers
– 90+ billion gallons treated each year
• Water quality monitoring
• Lake Erie beach monitoring and maintenance
What We Do…
![Page 6: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/6.jpg)
We Own and Operate 3 Wastewater Treatment Plants
Westerly
Southerly
Easterly
6
![Page 7: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/7.jpg)
Northeast Ohio Regional Sewer District
Responsibility
• $3 billion in 25 years• Combined Sewer Overflow (CSO) control• Sewer fees
• Regional flooding and erosion issues• Impervious surface fee
![Page 8: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/8.jpg)
Northeast Ohio Regional Sewer District
Responsibility
• Regional flooding and erosion issues• Impervious surface fee
• $3 billion in 25 years• Combined Sewer Overflow (CSO) control• Sewer fees
![Page 9: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/9.jpg)
Project Clean Lake
The Sewer District: COMBINED SEWER OVERFLOW CONTROL
![Page 10: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/10.jpg)
10 10
Dry Weather Flow to treatment plant
Additional Conveyance Capacity Available for
wet-weather
Combined Sewer Overflow Discharge to
Stream/Lake
What is a Combined Sewer?
![Page 11: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/11.jpg)
What is a Combined Sewer Overflow?
![Page 12: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/12.jpg)
How does a combined sewer system work?
![Page 13: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/13.jpg)
Separate Sewer System
Street Catch
Basins
Industrial
WastewaterDomestic
WastewaterStorm Sewer
WWTP
Flow to WWTP
Sanitary Sewer Lake Erie
![Page 14: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/14.jpg)
Combined Sewer Area
Separate Sewer Area
NEORSD Service Area & Communities
![Page 15: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/15.jpg)
Combined Sewer Area
126 CSO Locations Throughout Combined Sewer Area
![Page 16: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/16.jpg)
Consent Decree Requires Northeast Ohio’s CSO Problem Reduced in 25 Years
98%Capture
0
1
2
3
4
5
6
7
8
9
Baseline (1970s) Current (2011) Target (2036)
9
4.5
0.494
Typ
ical
Ye
arC
SO V
olu
me
Rem
ain
ing
(BG
) 0 to 4 overflows in typical year
0 to 80+ overflows in typical year
![Page 17: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/17.jpg)
CSO Consent Decree
25 years of Tunnel ConstructionSeven Tunnel Systems
– 21 Miles
– 17’ to 24’ in Diameter
– 100’ to 200’ in Depth
![Page 18: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/18.jpg)
18
2011 – 2020
2021 – 2027
2019 – 2024
2026 –2035
2017 –2021
2024 – 2030
Complete
Project Clean Lake
![Page 19: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/19.jpg)
Project Clean Lake
Euclid Creek Tunnel
![Page 20: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/20.jpg)
Project Clean Lake
Euclid Creek Tunnel
![Page 21: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/21.jpg)
NEORSD GREEN INFRASTRUCTURELooking across combined sewer area for opportunities to manage stormwater before it enters combined system
![Page 22: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/22.jpg)
![Page 23: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/23.jpg)
While the Sewer District Does Large Projects, You Can Also
Manage Your Runoff
On-Site Stormwater Management Practices
![Page 24: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/24.jpg)
On-Site Stormwater Management Practices
• Rain Gardens
• Rain Barrels and Cisterns
• Pervious Pavement
• Vegetated Filter Strips
![Page 25: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/25.jpg)
• Add disconnection slideRaingarden
Pervious PavementCistern
Retention Pond
Green roof
On-Site Stormwater Practices
Downspout Disconnection
On-Site Stormwater Management = Disconnection and Distribution
Bioretention
![Page 26: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/26.jpg)
![Page 27: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/27.jpg)
Project LocationProject Location MapSH
AKER H
EIG
HTS
![Page 28: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/28.jpg)
Project Drainage Area
![Page 29: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/29.jpg)
![Page 30: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/30.jpg)
Combined Sewer
Inlet Laterals
Inlet
![Page 31: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/31.jpg)
Inlet Laterals
Inlet
Storm SewerCombined Sewer
![Page 32: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/32.jpg)
Green Infrastructure Concept
![Page 33: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/33.jpg)
Green Infrastructure Concept
Overflow to Doan Brook
![Page 34: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/34.jpg)
Ponding Depths
0.75-inch rain event· 1 foot of surface ponding· 24-hour drawdown time
Rain events larger than 0.75 inches· 3 feet of surface ponding· 24- to 36-hour drawdown time
![Page 35: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/35.jpg)
Green Infrastructure Concept
![Page 36: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/36.jpg)
![Page 37: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/37.jpg)
Doan Brook Bank Stabilization
![Page 38: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/38.jpg)
![Page 39: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/39.jpg)
![Page 40: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/40.jpg)
Green Infrastructure Concept
![Page 41: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/41.jpg)
![Page 42: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/42.jpg)
Outlet Pipe to Bioretention Area
Maximum Height 14 feet
Large Stones to Slow Down Stormwater
Bioretention Area
Exposed Aggregate Concrete
Stamped & Stained Concrete
Standard Concrete Stained Concrete
![Page 43: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/43.jpg)
NEORSD will maintain the following:
Maintenance Responsibilities
• New storm sewers and new street inlets
• Bioretention basins (includes storm sewer infrastructure
within the bioretention basins)
• Public plaza (includes facility maintenance, litter control, etc.)
![Page 44: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/44.jpg)
Project Schedule
• Construction Start Date: March 2015
• Construction End Date: November 2016
![Page 45: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/45.jpg)
Construction & Community Impact
![Page 46: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/46.jpg)
Pre Construction Coordination
• Pre Construction Inspection/Photographs• Coordination with residents for access to property (typically
exterior of the home photographed)
• Residential Notification• 72-hour notification prior to commencement of work
• Access To Property• Contractor to coordinate & maintain access to drives, if
crossing is to occur
• Maintained with steel road plate
• Issues and Complaints• NEORSD Customer Service (216)881-8247 8AM-5PM
![Page 47: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/47.jpg)
Maintenance of Traffic
• Tentative Plan (Subject to Change) based on approval/schedule
• Major Components:– West bound lane Fairhill Road closed. Detour to be
established around Larchmere Blvd. to MLK Drive.
– No left turn from E. 124th, E. 127th, Kemper Road and North Moreland Road
– Intersection of MLK and Fairhill channelized to eastbound Fairhill, left turn only lane, to North MLK
– Pedestrian sidewalk closed along north Fairhill Road
– No street parking allowed
![Page 48: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/48.jpg)
![Page 49: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/49.jpg)
![Page 50: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/50.jpg)
Open Cut Construction
• Noise and dust limited to working hours. Contractor is responsible for maintaining work zone.
• Partial restoration of road cuts when sewer work completed.
![Page 51: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/51.jpg)
Open Cut Construction
![Page 52: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/52.jpg)
Open Cut Construction
![Page 53: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/53.jpg)
Open Cut Construction
![Page 54: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/54.jpg)
Open Cut Construction
![Page 55: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/55.jpg)
Questions/Discussion
![Page 56: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/56.jpg)
Questions & Answers
Question: Where will bus route #48/#48A go?
How will the public be notified of RTA bus routeand/or bus stop location changes?
RTA service alerts are posted at http://www.riderta.com
RTA Answerline (216) 621-9500 is also availableto help answer RTA related questions.
![Page 57: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/57.jpg)
Questions & Answers
Question: Who do I contact if I have a question or concern?
NEORSD Customer Service Department
(216) 881-8247 8AM – 5PM
![Page 58: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/58.jpg)
Questions & Answers
Question: What impacts should I expect from construction of the new storm sewers within the public right-of-way?
Temporary on-street parking limitations.Temporary lane closures, detours and limits
to left turns onto Fairhill Road westbound.Temporary driveway access closures.Pedestrian sidewalk closures/detours.Construction dust & noise.
![Page 59: Fairhill/MLK pre-construction public meeting 3-25-2015](https://reader033.vdocuments.us/reader033/viewer/2022052413/55ae2f9e1a28ab9c648b4617/html5/thumbnails/59.jpg)
For more information:
• NEORSD Customer Service (216) 881-8247
• Project Clean Lake official homepage:
www.neorsd.org/cso.php