Agenda
i. Key Conceptsii. Historical theories iii. Transportationiv. Labourv. Access to marketsvi. Short and long-term planningvii. Differences between small and large firmsviii. Conclusionix. Thoughts for discussion
![Page 3: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/3.jpg)
Key Concepts
• Neo-Classical Economic Theory
• Homo Economicus
• Cost-Minimising Theory
![Page 4: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/4.jpg)
Historically
• Weber: Transportation as the most general princible of location
• Waterways• Railways• Highways• Example:
– Ruhr area along the Rhine
![Page 5: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/5.jpg)
Example: European waterways
Source: http://www.sustainablelogistics.org/Inland_Shipping
![Page 6: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/6.jpg)
Transportation
• Transportation costs lower today– Offshoring to minimize production costs
• Important factors of location: – Production inputs:
• Labour• Capital• Raw matreials
![Page 7: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/7.jpg)
• Factor in determining optimal location:• In increqasingly competitive global economy
companies locate in low wage regions– Guangdong, China
weight of localized raw materials Weight of final productsMI:
![Page 8: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/8.jpg)
Labour
• Access to low-wage labour
• Firms must make compromises between transportation costs and labour costs (Weber) ‘Weberian’ Triangle
![Page 9: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/9.jpg)
Access to Markets
• Demand will decrease with distance from factory
• In a market with two sellers, both will locate in the middle (Hotelling)
![Page 10: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/10.jpg)
Predicting the future
• Difficult to predict future conditions for manufacturing locations
• Assumptions for the investment might change– Changes in economic and political environment– Technological innovation and rival behaviour= Decision process of manufacturing location
difficult
![Page 11: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/11.jpg)
Differences between SPFsand MPFs
• Responces to change• Short term:
– SPFs have limited options, increase labour or overtime– MNCs can shift oders from one company to another
• Medium term:– SPFs limited options– MNCs possibly expansion
• Long term:– Geographical expansion and new site locations
![Page 12: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/12.jpg)
Conclusion
• Main cost-minimising concerns: Transportation costs, input costs (labour) and access to markets
• Firms must always compromise to achieve the right balance between different costs
• Planning for the future is always difficult
![Page 13: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/13.jpg)
Things to take away
• A firm can make a profit without necessarily being in the ultimate cost-minimising position
• No two firms will ever have the exact same cost-minimising position
![Page 14: Factory Location as a Cost- Minimising Exercise By Peder Martin Floe Fejerskov and Katherine Reid](https://reader035.vdocuments.us/reader035/viewer/2022081513/56649f335503460f94c4f1c5/html5/thumbnails/14.jpg)
Discussion
• Earlier, transportation costs played a key role in cost-minimizing, today transport is of less importance
• Global warming and transportation costs
• What might the consequences be if there will be a price on CO2 emissions in the future?