Download - EXTRAPOLATION OF RATING CURVE
HYDROLOGY PROJECTTechnical Assistance
EXTRAPOLATION OF RATING CURVE
• WHY:– GAUGING DOES NOT COVER FULL RANGE OF
FLOW
– CALIBRATION AT HIGH FLOW IS DIFFICULT:* OCCURS INFREQUENTLY
* SHORT DURATION
– AT HIGH STAGES A DIFFERENT CONTROL MAY EXIST (FLOODPLAIN, DIFFERENT ROUGHNESS)
• WHERE:– EXTRAPOLATION AT STATE DATA
PROCESSING CENTRE
OHS - 1
HYDROLOGY PROJECTTechnical Assistance
HIGH FLOW EXTRAPOLATION
• METHODS:
– DOUBLE LOG PLOT METHOD
– STAGE-AREA/STAGE-VELOCITY METHOD
– THE MANNING’S EQUATION APPROACH
– THE CONVEYANCE SLOPE METHOD
OHS - 2
HYDROLOGY PROJECTTechnical Assistance
DOUBLE LOG PLOT METHOD
• CONDITIONS:– HYDRAULIC AND GEOMETRIC
CHARACTERISTICS DO NOT CHANGE BEYOND MEASURED RANGE
• IMPLICATION:– POWER TYPE RATING CURVE FITTED TO THE
LAST (HIGHEST) SEGMENT WILL BE CONSIDERED APPLICABLE TO EXTRAPOLATED RANGE AS WELL
OHS - 3
HYDROLOGY PROJECTTechnical Assistance
X-SECTION KHAMGAON, 1997
OHS - 4
HYDROLOGY PROJECTTechnical AssistanceOHS - 5
HYDROLOGY PROJECTTechnical Assistance
STAGE-AREA/STAGE-VELOCITY METHOD
• USE:– TO EXTRAPOLATE RATING CURVE BEYOND
MEASURED RANGE BASED ON:* MEASURED STAGE-X-SECTIONAL AREA RELATION
* EXTRAPOLATED STAGE-VELOCITY PLOT
• NOTE:– ASSUMPTION IS THAT STAGE-VELOCITY PLOT
CAN EASILY BE EXTRAPOLATED SINCE RATE OF INCREASE OF VELOCITY AT HIGHER STAGES DIMINISHES RAPIDLY
– FROM A HYDRAULIC POINT OF VIEW ASSUMPTION DOUBTFULL SINCE U::R^2/3
OHS - 6
HYDROLOGY PROJECTTechnical Assistance
ILLUSTRATION OF STAGE-AREA/STAGE-VELOCITY
METHOD
OHS - 7
HYDROLOGY PROJECTTechnical Assistance
MANNING’S EQUATION METHOD
METHOD– K* = f(h) PLOTTED
FROM DISCHARGE MEASUREMENTS
– K* BECOMES APPROX. CONSTANT FOR h>>
– K* WITH Ar AND Rr FROM MEASUREMENTS EXTRAPOLATED
– FLOOD PLAIN TREATED BY MANNING EQUATION
– S CAN BE ESTIMATED FROM TOPOSHEETS
2/13/2 SRKu m
3/2*
3/2*
2/1*
R
uK
RKu
SKK m
fpriver
fpfpfpmfp
rrriver
QQQ
SRAKQ
RAKQ
2/1
,
3/2*
OHS - 8
HYDROLOGY PROJECTTechnical Assistance
MANNING’S EQUATION METHOD
OHS - 9
HYDROLOGY PROJECTTechnical AssistanceOHS - 10
HYDROLOGY PROJECTTechnical AssistanceOHS - 11
HYDROLOGY PROJECTTechnical AssistanceOHS - 12
HYDROLOGY PROJECTTechnical Assistance
CONVEYANCE-SLOPE METHOD
• METHOD:– CONVEYANCE AND
ENERGY SLOPE ARE EXTRAPOLATED SEPARATELY
– A AND R FROM FIELD SURVEY
– Km ESTIMATED IN FIELD
– K EXTRAPOLATED
– S FOLLOWS FROM (Q/K)2 VERSUS h
– EXISTING S-TENDENCY EXTRAPOLATED
3/2
2/1
2/13/2
ARKK
with
KSQ
or
SARKQ
m
m
OHS - 13
HYDROLOGY PROJECTTechnical AssistanceOHS - 14
HYDROLOGY PROJECTTechnical AssistanceOHS - 15
HYDROLOGY PROJECTTechnical Assistance
INTERPRETATION OF WETTED PERIMETER
FLOOD PLAINRIVER
OHS - 16
HYDROLOGY PROJECTTechnical Assistance
EXTRAPOLATION WITH HYMOS
• FIRST:– COMPUATATION OF GEOMETRIC AND
HYDRAULIC QUANTITIES IN MEASRED RANGE
• NEXT:– PLOT OF FOLLOWING PARAMETERS AS f(h)
* SURFACE WIDTH
* WETTED PERIMETER
* X-SECTIONAL AREA
* HYDRAULIC RADIUS
* AR2/3, Q, u, conveyance K, AND S
• FINALLY:– K EXTRAPOLATED AND S ASYMPTOTICALLY
EQUAL TO BEDSLOPE: Q = KS1/2 OHS - 17
HYDROLOGY PROJECTTechnical AssistanceOHS - 18
HYDROLOGY PROJECTTechnical AssistanceOHS - 19
HYDROLOGY PROJECTTechnical AssistanceOHS - 20
HYDROLOGY PROJECTTechnical AssistanceOHS - 21
HYDROLOGY PROJECTTechnical AssistanceOHS - 22
HYDROLOGY PROJECTTechnical AssistanceOHS - 23
HYDROLOGY PROJECTTechnical AssistanceOHS - 24
HYDROLOGY PROJECTTechnical AssistanceOHS - 25
HYDROLOGY PROJECTTechnical AssistanceOHS - 26
HYDROLOGY PROJECTTechnical Assistance
Computation of cross-sectional parameters
Station : KHAMGAON Date : 1997 1 1
Section 1
Left bound -160.00 m, right bound .00 m from initial point Water boundaries included
K-Manning: 30.0, Sqrt(S).K-Manning: .4135
Stage Width Wetted Area Hydraulic A*R**2/3 Q Perimeter radius m m m sq-m m m**(8/3) m3/s
516.00 .000 .000 .000 .000 .00 .00 516.50 .000 .000 .000 .000 .00 .00 517.00 7.143 7.738 .715 .092 .15 .06 517.50 19.545 20.182 7.605 .377 3.97 1.64 518.00 45.568 46.233 25.858 .559 17.55 7.26 518.50 102.278 102.988 60.973 .592 42.99 17.78 519.00 106.139 106.976 113.077 1.057 117.34 48.52 519.50 121.428 122.344 168.385 1.376 208.34 86.16 520.00 125.143 126.195 230.063 1.823 343.33 141.98 520.50 128.714 129.903 293.527 2.260 505.44 209.01 521.00 142.500 143.755 360.636 2.509 665.84 275.34
OHS - 27
HYDROLOGY PROJECTTechnical Assistance
Section 2
Left bound .00 m, right bound 220.00 m from initial point Water boundaries included
K-Manning: 40.0, Sqrt(S).K-Manning: .5514
Stage Width Wetted Area Hydraulic A*R**2/3 Q Perimeter radius m m m sq-m m m**(8/3) m3/s
516.00 205.888 207.247 999.412 4.822 2852.65 1572.84 516.50 218.718 220.220 1106.445 5.024 3245.72 1789.57 517.00 220.000 222.033 1216.253 5.478 3779.44 2083.84 517.50 220.000 223.033 1326.253 5.946 4353.09 2400.13 518.00 220.000 224.033 1436.253 6.411 4956.52 2732.84 518.50 220.000 225.033 1546.253 6.871 5588.60 3081.34 519.00 220.000 226.033 1656.253 7.327 6248.32 3445.08 519.50 220.000 227.033 1766.253 7.780 6934.71 3823.54 520.00 220.000 228.033 1876.253 8.228 7646.93 4216.23 520.50 220.000 229.033 1986.253 8.672 8384.14 4622.70 521.00 220.000 230.033 2096.253 9.113 9145.61 5042.54
OHS - 28
HYDROLOGY PROJECTTechnical Assistance
Section 3
Left bound 220.00 m, right bound 420.00 m from initial point Water boundaries included
K-Manning: 30.0, Sqrt(S).K-Manning: .4135
Stage Width Wetted Area Hydraulic A*R**2/3 Q Perimeter radius m m m sq-m m m**(8/3) m3/s
516.00 .000 .000 .000 .000 .00 .00 516.50 2.222 2.741 .300 .110 .07 .03 517.00 6.337 6.975 2.440 .350 1.21 .50 517.50 36.820 37.559 8.071 .215 2.90 1.20 518.00 72.393 73.180 39.330 .537 26.00 10.75 518.50 77.712 78.592 76.856 .978 75.72 31.31 519.00 110.209 111.137 121.607 1.094 129.13 53.40 519.50 132.517 133.496 180.508 1.352 220.72 91.27 520.00 144.521 145.595 251.050 1.724 361.00 149.28 520.50 147.822 149.043 324.136 2.175 544.09 224.99 521.00 177.389 178.710 401.567 2.247 688.91 284.88
Stage Discharge/section >>> Total Discharge 516.00 .00 1572.84 .00 1572.84 516.50 .00 1789.57 .03 1789.60 517.00 .06 2083.84 .50 2084.40 517.50 1.64 2400.13 1.20 2402.97 518.00 7.26 2732.84 10.75 2750.84 518.50 17.78 3081.34 31.31 3130.43 519.00 48.52 3445.08 53.40 3547.00 519.50 86.16 3823.54 91.27 4000.97 520.00 141.98 4216.23 149.28 4507.48 520.50 209.01 4622.70 224.99 5056.70 521.00 275.34 5042.54 284.88 5602.76
OHS - 29
HYDROLOGY PROJECTTechnical AssistanceOHS - 30