Outline of the document
• A (4.4.2 – 4.4.14): Atmospheric Observations– Regional Basic Synoptic Network (RBSN) and Regional Basic
Climatological Network (RBCN)
– Aircraft Observations
– Atmospheric Chemical Composition and UV Measurements
• B (4.4.15 – 4.4.16): Marine & Oceanographic
Observations
• C (4.4.17) : Terrestrial Observation: Water cycle
• D (4.4.18 –4.4.20) : Terrestrial Observation – Polar Observations
– Global Cryosphere Watch (GCW)
Outline of the document (cont.)
• E (4.4.21 – 4.4.28): Cross-cutting Aspects– Space-based observation– Instrument Standards and Best Practices – Radio-Frequency Coordination– Evolution of the GOS– Observing System Experiments (OSEs)
• F (4.4.30 – 4.4.36) : Coordination of Climate observations
• G (4.4.33 -4.4.43): WIGOS – Implementation of the WIGOS concept – WIGOS Pilot Projects (WPP) – WIGOS Demonstration Projects (WDP)
• 4.4.49 : Cooperation with GEOSS
Atmospheric Observations
• Decision on Basic Stations– RBSN (Resolution 4.4/1) - Inf. 5.1
– RBCN (Resolution 4.4/2) – Inf. 5.2
– Manual on Global Observing System (WMO‑No. 544), Volume II – Regional Aspects, Region V.
• The Association appreciated the work done by the Lead Centre in Melbourne for monitoring the data availability and quality and offering a quality monitoring service for all Members of RA V.
4
Atmospheric Observations (cont.)
• AMDAR: 12th AMDAR Panel meting (Toulouse, November 2009) regarding the further promotion of AMDAR in the Region:
– A new AMDAR Pilot Project encompassing areas of the South-West Pacific.
– Recently development of AMDAR water vapor sensor currently under test in the USA and Europe
• The Association:– Encourage members to extend AMDAR
coverage– Support the AMDAR Pilot Project
5
• About 250,000 AMDAR observations per day disseminated on the GTS• The availability of AMDAR profiles in data sparse regions of Southern Africa, Eastern Europe, parts of the Russian Federation, South and East Asia and South America have significantly increased over the past few years. •12th AMDAR Panel meeting , a new AMDAR Pilot Project encompass areas of South-West Pacific, RA V encourage Members to support the project.
ATMOSPHERIC - AMDAR obs.
6
Atmospheric Observations (cont.)
• Atmospheric Chemical Composition and UV Measurements
• The Association recognized: the important support by Members for GAW stations in the Region:
– Australia
– Indonesia
– Malaysia
– New Zealand and,
– USA (Mauna Loa and America Samoa)
7
Marine and Oceanographic observations
• Marine observation– RA V noted the implementation of marine observing
networks had continued to expand, thanks to the Members – In particular the Research Moored Array for the Africa-
Asia-Australian Monsoon Analysis and Prediction (RAMA) is now 52% completed and still developing.
• WMO-IOC RMIC – JCOMM – III (Morocco, Nov. 2009) decide to establish
WMO-IOC Regional Marine Instruments Centre (RMIC).– RA V Invited Members to offer such facilities to improve
data and observational products quality.
8
Terrestrial & Polar Observations
• Water cycle– The Association noted the activities carried out by the experts of the
RA V Working Group on Hydrology (RA V-WGH) related to the Pacific-HYCOS and the progress on developing a WHYCOS component for the South-East Asian countries.
• Polar Observation – IPY observation legacy initiatives through the EC Panel of Experts on
Polar Observations, Research and Services (EC-PORS).– High priority of polar observation in support research and servces. – Interested Members to provide EC PORS with a contact for their
Antarctic activities.
• Global Cryosphere Watch (GCW)– GCW would be an integrator between weather, water, climate and the
cryosphere and request EC-PORS to provide oversight and support for GCW.
9
Cross-cutting: Space-based observation
• GOS Vision in 2025: address climate observations– Hyperspectral Sounders from GEO and LEO
– Constellation of radio-occultation sounders
– Continuity of Altimetry for ocean surface wind
– Constellation of global precipitation measurements • Geostationary Satellites covering RA V and transition
– GOES series (USA) GOES-R series– MTSAT-1R (Japan) Himawari – 8 – FY-2D/E (China) FY-4 series– Kalpana(India)
• Polar and Geostationary Satellites covering RA V– NOAA – 19 (USA)– Metop – 3 (EUMETSAT)– FY-3A (China)– Meteor-M (Russian Federation)– Jason-2 (Joint ocean mission, EUMETSAT, USA and France) 10
Cross-cutting
• Instrument Standards and Best Practices – EC-LXI had adopted revised Terms of Reference (ToRs) for Regional
Instrument Centres (RICs) and Regional Radiation Centres (RRCs)
– The Association requested its Members who operate RICs to declare their level of capability under the new ToRs.
• Evolution of the Global Observing Systems (GOS)– RA notes valuable contributions from RA V Members to the GOS
Vision 2025; expecting contribution to GOS 2025 Implementation Plan
• Observing Systems Experiments (OSEs)– The Association requested major RA V NWP Centres to continue their OSE
experiments so as to contribution to the future observing system development.
• Global Climate Observing System (GCOS)– RA noted GCOS Technical Support Project for the Pacific Islands and CBS
Lead Centre for GCOS Data in the Region, leading to improved performance of RBCN, GSN and GUAN, thanks to the donor countries.
– Encourage Members to support the proposed GCOS Reference Upper-Air Network (GRUAN), Ozone and Aerosol networks.
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010 11
WWMOMO IINTEGRATED NTEGRATED GGLOBAL LOBAL
OOBSERVING BSERVING SSYSTEMYSTEM
(WIGOS)(WIGOS)
WMO Global Observing SystemsGlobal Observing Systems (WWW GOS)Global Atmospheric Watch (GAW)The World Hydrological Cycle Observing System (WHYCOS) WMO Space ProgrammeWMO Co-sponsored Observing Systems (GCOS, GOOS and GTOS)
GOS Space-based development
19611961 19781978
19901990 20092009
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
Convergence of N.Hem and S.Hem Medium Range Forecast skill 1981 – 2004
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
El NiñoEl Niño
Challenges: Climate Variability and Change, increasing society needs for improved services: GFCS
Hail&LightningHail&Lightning
AvalanchesAvalanchesFlash floodsFlash floods
TornadoesTornadoes
Wildland firesWildland fires& haze& haze
Hot & cold spellsHot & cold spells
Heavy precipitationsHeavy precipitations(rain or snow)(rain or snow)
DroughtsDroughts
Storm surgesStorm surges
Storm (winds)Storm (winds)
River basin floodingRiver basin flooding
Mud & landslidesMud & landslides
Ice StormsIce Storms
Tropical cyclonesTropical cyclones
Dust stormsDust storms
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
A Seamless Climate Prediction Framework
Fo
reca
st
Lea
d T
ime
Fo
reca
st
Lea
d T
ime
Fo
reca
st
Lea
d T
ime
Fo
reca
st
Lea
d T
ime
Warnings & Alert Warnings & Alert CoordinationCoordination
WatchesWatches
ForecastsForecasts
Threats Threats AssessmentsAssessments
GuidanceGuidance
OutlookOutlook
PredictioPredictionn
ApplicationsApplications
Tra
ns
po
rta
tio
nT
ran
sp
ort
ati
on
Tra
ns
po
rta
tio
nT
ran
sp
ort
ati
on
Pro
tec
tio
n o
f P
rote
cti
on
of
Lif
e &
Pro
pe
rty
Lif
e &
Pro
pe
rty
Pro
tec
tio
n o
f P
rote
cti
on
of
Lif
e &
Pro
pe
rty
Lif
e &
Pro
pe
rty
Sp
ac
e
Sp
ac
e
Ap
pli
ca
tio
ns
Ap
pli
ca
tio
ns
Sp
ac
e
Sp
ac
e
Ap
pli
ca
tio
ns
Ap
pli
ca
tio
ns
Re
cre
ati
on
Re
cre
ati
on
Re
cre
ati
on
Re
cre
ati
on
Ec
os
ys
tem
Ec
os
ys
tem
Ec
os
ys
tem
Ec
os
ys
tem
Sta
te/L
oc
al
Sta
te/L
oc
al
Pla
nn
ing
Pla
nn
ing
Sta
te/L
oc
al
Sta
te/L
oc
al
Pla
nn
ing
Pla
nn
ing
En
vir
on
me
nt
En
vir
on
me
nt
En
vir
on
me
nt
En
vir
on
me
nt
Wa
ter
Wa
ter
Ma
na
ge
me
nt
Ma
na
ge
me
nt
Wa
ter
Wa
ter
Ma
na
ge
me
nt
Ma
na
ge
me
nt
AAg
ric
ult
ure
gri
cu
ltu
reAA
gri
cu
ltu
reg
ric
ult
ure
Wa
ter
Re
so
urc
e
Wa
ter
Re
so
urc
e
Pla
nn
ing
Pla
nn
ing
Wa
ter
Re
so
urc
e
Wa
ter
Re
so
urc
e
Pla
nn
ing
Pla
nn
ing
En
erg
yE
ne
rgy
En
erg
yE
ne
rgy
Co
mm
erc
eC
om
me
rce
Co
mm
erc
eC
om
me
rce
Hy
dro
po
we
rH
yd
rop
ow
er
Hy
dro
po
we
rH
yd
rop
ow
er
Fir
e W
ea
the
rF
ire
We
ath
er
Fir
e W
ea
the
rF
ire
We
ath
er
He
alt
hH
ea
lth
He
alt
hH
ea
lth
Forecast Forecast UncertaintyUncertaintyForecast Forecast UncertaintyUncertainty
Initial Initial ConditionsConditions
Boundary Boundary ConditionsConditions
MinutesMinutes
HoursHours
DaysDays
1 Week1 Week
2 Weeks2 Weeks
MonthsMonths
SeasonsSeasons
YearsYears
WeatherWeather
Climate VariabilityClimate Variability
ScenariosScenarios
Anthropogenic Anthropogenic ForcingForcing
Climate ChangeClimate Change. .
Adapted from: NOAAAdapted from: NOAA
DecadesDecades
CenturiesCenturies
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
Studying Earth as a Complex System
CirculationCirculationSurface WindsSurface WindsPrecipitationPrecipitationReflection and TransmissionReflection and TransmissionSurface TemperatureSurface TemperatureEvaporationEvaporationCurrentsCurrentsUpwellingUpwelling
CirculationCirculationSurface WindsSurface WindsPrecipitationPrecipitationReflection and TransmissionReflection and TransmissionSurface TemperatureSurface TemperatureEvaporationEvaporationCurrentsCurrentsUpwellingUpwelling
InfiltrationInfiltrationRunoffRunoffNutrient LoadingNutrient LoadingSurface TemperatureSurface TemperatureCurrentsCurrents
InfiltrationInfiltrationRunoffRunoffNutrient LoadingNutrient LoadingSurface TemperatureSurface TemperatureCurrentsCurrents
Surface WindsSurface WindsPrecipitationPrecipitationReflection and TransmissionReflection and TransmissionEvaporationEvaporationTranspirationTranspirationSurface TemperatureSurface Temperature
Surface WindsSurface WindsPrecipitationPrecipitationReflection and TransmissionReflection and TransmissionEvaporationEvaporationTranspirationTranspirationSurface TemperatureSurface Temperature
LandLand
OceanOcean
AtmosphereAtmosphere
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
Mid-1970s
Atmosphere
Mid-1980s
Atmosphere
Land Surface
Early 1990s
Atmosphere
Land Surface
Ocean & Sea Ice
Late 1990s
Atmosphere
Land Surface
Ocean & Sea Ice
SulphateAerosol
Present Day
Atmosphere
Land Surface
Ocean & Sea Ice
SulphateAerosol
Non-sulphateAerosol
Carbon Cycle
Early 2000s?
Atmosphere
Land Surface
Ocean & Sea Ice
SulphateAerosol
Non-sulphateAerosol
Carbon Cycle
DynamicVegetation
AtmosphericChemistry
Weather
Climate Change
ClimateVariability
Overview of Weather and Climate Models and the Required Observations
Need an Integrated Need an Integrated Global Observing Global Observing
System Going System Going Beyond the WWWBeyond the WWW
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
WIGOS: Overview
CONGRESS XV (2007) • High priority -- “Towards Enhanced Integration
between the WMO Observing Systems” (WIGOS)
WMO Executive Council• Established a WG on WIGOS-WIS
– Develop an WIGOS Implementation Plan– Refine the WIS-Implementation Plan– Monitor the Progress of the Pilot and Demo
projectsRA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
WIGOS Vision
• WIGOS will establish an integrated, comprehensive and coordinated observing system to satisfy in a cost-effective and sustained manner the evolving observing requirements of WMO Members and enhance coordination with partners for the benefit of society.
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
What will WIGOS be?
• Integrated WMO Observing System:– comprehensive– sustainable
to address obs. requirements of all WMO Programmes in a coordinated and cost-effective manner;
• Framework facilitating standardization and interoperability for improved:– availability– quality – utilization – access etc.
of weather, climate & water information
Timeline @ WDIP
June 2006June 2006 May 2007May 2007 June 2008June 2008 June 2009June 2009 June 2010June 2010 May 2011May 2011EC-LVIIIEC-LVIII EC-LXEC-LX EC-LXIEC-LXI EC-LXIIEC-LXIICg-XVCg-XV Cg-XVICg-XVI
EC LVIII initiated EC LVIII initiated work “toward work “toward enhanced enhanced integration integration between the between the WMO observing WMO observing systems”;systems”;establishes EC establishes EC Task Team on Task Team on WIGOSWIGOS
Cg-XV decided Cg-XV decided to embark on to embark on WIGOS viaWIGOS viaRes. 30 (CG Res. 30 (CG XV);XV);initiated WMO initiated WMO Programme Programme and structural and structural changes;changes;EC-LIXEC-LIX established EC established EC WG on WG on WIGOS/WIS;WIGOS/WIS;
EC LX agreed EC LX agreed to WIGOS to WIGOS Concept of Concept of Operations and Operations and WIGOS WIGOS Development Development and and ImplementatioImplementation Plan V1.1n Plan V1.1
CBS XIVCBS XIV
Review Review progress and progress and update plans update plans as appropriateas appropriate
Review Review progress, progress, update plans;update plans;Pilot Projects Pilot Projects completed and completed and evaluated;evaluated;Propose Propose changes to changes to Tech Regs, Tech Regs, structure, etc;structure, etc;Prepare for CG Prepare for CG XVIXVICg-XVI receives Cg-XVI receives
final report of EC final report of EC WG WIGOS/WISWG WIGOS/WIS
CONCEPTCONCEPT REALITY REALITY
NOWNOW
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
04/10/2304/10/23 2323
WDIPWDIP
TestingTesting(2007-2011)(2007-2011) ImplementationImplementation
(2012-2015)(2012-2015)
WMO WMO RegulatoryRegulatory
MaterialMaterial
WIGOS PhasesWIGOS Phases
OperationsOperations(2015 - … )(2015 - … )
CONOPSCONOPS
WIGOSWIGOSImperativeImperative
WDISWDIS W I PW I P
CONOPSCONOPS WIGOSWIGOSManualManual
: : Reference forReference for
QMF Standards Instruments and methods of
observation standards
WIS
Standardsfor
Data & Metadata exchange&
Discovery, Access and Retrieval (DAR) Services
Observationsfor
Weather,Climate,Water,
Ocean, …
DataProcessing and
Forecasting
Archiving
Users
Active Quality Management
Three areas of Integrations/Standardizations
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
WIGOS Pilot & Demo Projects
• WIGOS Pilot Projects for:– CIMO– JCOMM– AMDAR– GAW – Global Hydrological Network – Satellite Systems integration (GSICS)– GCOS Reference Upper-Air Network (GRUAN)
• WIGOS Regional Demonstration Projects
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
04/10/2304/10/23 2626
WIGOS Development and Implementation Strategy
(WDIS)• Draft WDIS proposed by EC-WG/WIGOS-WIS with a
view to presenting it to Cg-XVI;• RAs and TCs are requested to incorporate WIGOS
implementation activities into their operating plans and work programmes.
• RAs are requested to: develop their regional WIGOS implementation
plans; coordinate WIGOS implementation activities; establish WIGOS-related Task Teams; and initiate regionally focused WIGOS-WIS activities.
04/10/2304/10/23 2727
WDIS: WIGOS & WIS
• WIGOS & WIS - a framework enabling the integration and optimized evolution of WMO observing and information systems, and WMO’s contribution to co-sponsored systems.
• Members’ support is critical to provide additional resources in the form of:
contributions to the WIGOS Trust Fund and secondment services to the Secretariatduring the WIGOS Implementation phase to ensure successful WIGOS implementation.
04/10/2304/10/23 2828
RA V Guidance for future development and implementation of
WIGOS • Strong support for the further development of WIGOS; • Noted with appreciation the Regional Demonstration
Project conducted by Australia; request new WIGOS WG collaborate with WIGOS DP
• Request RA V relevant Regional WIGOS Working Bodies to develop the Regional WIGOS Implementation Plan, and include the relevant tasks and activities in their work plans, taking into consideration of Regional special requirements;
• Urged and encouraged Members participate actively in the WIGOS relevant activities (AMDAR, RMIC, GRUAN, etc)
• Underlined the importance of the active collaboration of Members and Regional Working Bodies.
04/10/2304/10/23 2929
WIGOS Benefits
• Enable WMO Members to meet expanding national mandates which are calling for increasing coordination and integration to help them better respond to natural hazards, improve weather, water, climate and related environmental monitoring, and adapt to climate change and other environmental impacts;
• Enhance operational components of WMO Programmes, especially in Developing and LDCs;
• Ensure essential WMO support for the observational and information elements of the future GFCS;
• Contribute strongly to GOOS, GTOS, GCOS and GEOSS.
WIGOS Web Page
http://www.wmo.int/pages/prog/www/wigos/index_en.htmlhttp://www.wmo.int/pages/prog/www/wigos/index_en.html
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010
WIGOS: let`s work together from concept to reality
RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010RA V Fifteenth Session, Bali, INDONIESIA, 30 April to 6 May 2010