EXONAUT – AN INTEGRATED TRAINING AND EXERCISE MANAGEMENT SYSTEM
Presentation to the Ministry of the Interior
20 November 2019Helsinki
Mikael Grape, Managing DirectorOscar Wieslander, Delivery Consultant
-
Ever since our founding in 2000, our mission has been to contribute to an improved and more secure environment for people and organisations.
We do this by bringing together our expertservices and EXONAUT® software to build capability and resilience.
Founded by members of the Swedish Armed Forces, we are now based in London, Malmö, Stockholm, Warminster and Washington D.C.
WARMINSTER2014
LONDON2010
STOCKHOLM2003
MALMÖ2000
WASHINGTON2016
ABOUT 4C STRATEGIES
-
• Exonaut supports readiness management through integration of several activities into one platform, including:
• Programming and Scheduling
• Individual training
• Collective training
• Experimentation
• Lessons and Best Practice
• Exercise Risk Management
• Evaluation and Certification
EXONAUT® - An integrated Readiness Management System
-
EXONAUT® SUPPORTING THE ENTIRE READINESS CYCLE
Integration with
Simulation and C2
Systems
Integration with
Sensors (e.g UAS)
-
Train – Fail – Reflect – Re-Train - Learn
Progression - Connected by a Common Objective / Standards Set
Exercise 1 - Constructive Exercise 2 - Virtual Exercise 3 - Live
DIFFICULTY
COMPLEXITY
EXONAUT® - Accurately measure training progression
-
• We uphold the highest levels of information security in accordance with international standards and best practice.
• Secure, customizable permission structure restricts access to sensitive data.
• Regular information security audits and penetration testing by our clients.
• Accredited by NATO for unclassified, restricted and secret information
• Fully compliant with national and international privacy and data protection regulations.
• Available as on-premise or SAAS/Cloud-based solution
• Data Centers located in Sweden in accordance with Tier 3 Security standards, as regularly verified with audit and penetration testing
EXONAUT® – Keeping your data safe and secure
-
SAVINGS• Time in planning, design, delivery and analysis
• More effective use of scarce resource in a managed
progression
• Time in production of reports and exploitation of best practice
and lessons learned
COHERENCE• Single set of objectives facilitating Command direction
• Common standard of objective performance measurement
• Single version of objectives, exercise data and information sets
• Real time campaign / unit status overview
• Single repository of all training data
EVIDENCE• Real time, objective view of Training Risk and Readiness, to
enable informed decisions
• Supports Evaluations standards such as Objective T &
NATO OCC
• Exploitable Data – For Lessons Learned and Capability
Development
MOBILITY• An expeditionary solution
• Data readily available on mobile devices.
EXONAUT® – A training management system that delivers
-
EXONAUT SUPPORTING COMPLEX EXERCISES
EXONAUT USE CASES
-
ICC01
MPCDetailed planning in Exonaut
03
FCC04
Execution05
PXD
FER08
IPCSet Objectives, OrbatOperational environmentScenario etc. in Exonaut
02
FIRDelivered at ENDEX
06
07
Programme Plan
Assess
Execute Exploit / Assure
Planning finalized
Exonaut supporting dynamic execution and data collection
-
EXONAUT® SUPPORTING COMPLEX EXERCISES
Exercise director
Planners
Observers
Evaluation
ICC01 MPC03 FCC04 Execution05 PXD FER08IPC02 FIR
Objectives, ORBAT,Operational environmentScenario framework
Strategic direction and guidanceOver all planning activities Progression in overall planning
Progression vs training objectivesProvide Exercise direction
Scenario developmentOperational environment workFine-tuning Objectives and ORBAT
Observer requirements, methodology
Check for trainersExercise report structure
Scenario adjustments (based on input from Observers)
Collecting observationsAssessments (Objectives, Units)Reporting
Surveys, interviews, observations Reporting
Evaluation requirementsSurveys
Reporting
Direction for reporting
Best practices
Best practices
06 07
-
The example of an army battalion Command Post Exercise (CPX)
Exercise phase Time savings estimate Comment
Planning Minimum 500 h Well-defined training objectives are easily mapped to individual trainingevents. The ability to base MEL/MIL-production on a database of bestpractice reduces time for scripting. More effective collaborative planning isachieved (including in a distributed environment).
Execution Minimum 250 h Less staff in exercise control through more efficient HICON/LOCON taskmanagement. Integration with simulators reduces operator manpowerrequirements. More efficient coordination efforts during execution,including the ability to dynamically adjust planned events leads to lower riskof stand-still and a higher degree of training objectives fulfilled.
Evaluation& reporting
Minimum 250 h Includes the ability to use pre-configured reporting templates and todistribute reports with less post-exercise production efforts.
Total time saved Minimum 1000 hours
EXONAUT® – Time savings estimate
-
For more information, please contact :Oscar Wieslander, Delivery Consultant 4C Strategies Nordic
E-mail: [email protected]: +46 76 305 85 25
mailto:[email protected]
-
NAVIGATING UNCERTAINTY