Transcript
Page 1: EXISTING AND PLANNED TRANSPORTATION PROJECTS · PDF fileEXISTING AND PLANNED TRANSPORTATION PROJECTS (RIVERSIDE METROLINK LINE ONTARIO INTERNATIONAL AIRPORT (ONT)

EXISTING AND PLANNED TRANSPORTATION PROJECTS

(

RIVERSIDE METROLINK LINEONTARIO INTERNATIONAL AIRPORT (ONT)

Euclid Ave.

Milliken A

ve.

Haven A

ve.

Vineyard A

ve.

Grove A

ve.

Foothill Blvd.

Baseline Rd.

Holt Blvd.

Arrow Hwy.

Mission Blvd.

Riverside Dr.

Fourth St.

Mountain A

ve.

Central Ave.

Towne A

ve.

Garey A

ve.

San Dim

as Ave.

57

White Ave.

¯0 2.5 51.25Miles

Existing Metrolink Line / Station

City Boundary

Planned Metro Gold Line Foothill Extension Phase 2B / Station Planned Metro Gold Line Foothill Extension Phase 2C / Station

Existing HOV Lane

Planned HOT Lanes / Potential Express Bus

Planned HOV Lanes

Planned Metrolink Service Expansion

Planned Rail / Bus Connection to ONTExisting Bus Rapid Transit LinePlanned Bus Rapid Transit Line

Montclair

Claremont

Pomona (North

)San Dimas

Downtown Pomona

UplandLa Verne

PACIFIC ELECTRIC BIKE TRAIL

East Ontario

Rancho

Cucamonga

(

15

( SAN BERNARDINO METROLINK LINE

LAVERNE

POMONA

CLAREMONT

MONTCLAIR

ONTARIO

UPLAND

RANCHOCUCAMONGA

LOS

AN

GEL

ES C

OSA

N B

ERN

ARD

INO

CO

EXiSTiNG TRANSpORTATiON

Metrolink San Bernardino and Riverside Lines

Omnitrans, Foothill Transit, and Metro Bus Service

High Occupancy Vehicle (HOV) Lanes on the 10 Freeway

pLANNED pROJECTS

Metro Gold Line Extension and Metrolink Service Expansion

High Occupancy Toll Lanes and Expanded HOV Lanes on the 10 Freeway

Shuttle/Rail Connection to Ontario Airport

Bus Rapid Transit

data sources: SCAG 2016-2040 Draft Regional Transportation Plan (RTP)/Sustainable Communities Strategy (SCS), Metro Long Range Transportation Plan, SANBAG 2015 Countywide Transportation Plan and SANBAG Long Range Transit Plan

range of eXItIng transportatIon & planned projects

Top Related