DesignTrendsfor
RaisingYourGame!
ExceedingCostandPerformanceObjectiveswithWoodFramedSchools
![Page 2: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/2.jpg)
“TheWoodProductsCouncil”isaRegisteredProviderwithTheAmericanInstituteofArchitectsContinuingEducationSystems(AIA/CES),Provider#G516.
Credit(s)earnedoncompletionofthiscoursewillbereportedtoAIACESforAIAmembers.CertificatesofCompletionforbothAIAmembersandnon-AIAmembersareavailableuponrequest.
ThiscourseisregisteredwithAIACESforcontinuingprofessionaleducation.Assuch,itdoesnotincludecontentthatmaybedeemedorconstruedtobeanapprovalorendorsementbytheAIAofanymaterialofconstructionoranymethodormannerofhandling,using,distributing,ordealinginanymaterialorproduct.________________________________Questionsrelatedtospecificmaterials,methods,andserviceswillbeaddressedattheconclusionofthispresentation.
![Page 3: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/3.jpg)
CourseDescription
Throughaseriesofcasestudies,thispresentationwilldemonstratehowschoolsdistrictsacrosstheUShaveshownleadershipintheirchoiceofstructuralmaterialandimaginationintheirbuildingdesignstoachievebothperformanceandcostobjectives.Thechoiceofmaterialscanhaveaconsiderableimpactonaschool’sconstructioncosts,energyefficiency,acousticperformance,aestheticappealandoccupantenvironment- whichcaninturndramaticallyinfluencethesuccessofstudents.Thishighlypictorialpresentationwillshowcasetherangeofdesignpossibilitiesandbenefitsassociatedwithwoodframeschools.
![Page 4: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/4.jpg)
LearningObjectives
1. Understandhowtheuseofwood-frameconstructionsaved$2.7millionforthenewElDoradoHighSchoolinArkansas.
2. LearnhowtheBethelSchoolDistrictinWashingtonStateachievesbothupfrontcostsavingsandlong-termenergysavingsthroughtheuseofwoodframing.
3. Explainarchitecturaldesigntechniquesusedtoimproveacousticperformanceinexposedheavytimberconstructedroofapplications.
4. Describewhystudentperformancecanbeimprovedbyprovidinganoccupantenvironmentwithvisualwoodelements.Informationfromvariousstudieswillbeprovidedtoassistwithunderstandingthephysiologyand psychologyassociatedwithvisualaspectsofoccupantenvironment.
![Page 5: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/5.jpg)
GoalsforDesigningSchoolFacilities
• Enhancelearningenvironment• Effectiveacoustics,lighting,ventilation,
hypoallergenic• Calmingaesthetics
• Minimizeupfrontcost• Lowercostmaterials• Reducedlabortime
• Reducelongtermcosts• Energyefficient• Lowmaintenance
• Encouragesschoolpride• ReduceEnvironmentalImpact• UniqueDesign• ExpressiveAesthetics
![Page 6: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/6.jpg)
DukeLowerandMiddleSchools,
Durham,NC
RosaParksElementary,Redmond,
WA
ElDoradoHighSchool,ElDorado,
AR
Burr&Burton
Academy,Peru,VT
CayucosElementary,Cayucos,CA
BethelSchoolDistrict,Tacoma,WA
ManchElementary,LasVegas,
NV
NewportElementarySchool,Newport,AR
VirtualTourofSchoolFacilities
![Page 7: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/7.jpg)
DukeLower
andMiddle
School
Location:
Durham,NC
Completed:
2009
Architect:
DTW
Architectsand
Planners
![Page 8: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/8.jpg)
Size:
3Middle
SchoolBldgs.
2Lower
SchoolBldgs.
Cost:
MiddleSchool
$130/sf
LowerSchool
$112/sf
![Page 9: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/9.jpg)
WOODINHUMANENVIRONMENT:RESTORATIVEPROPERTIESOF
WOODINTHEBUILTINDOORENVIRONMENT
Source:DavidRobertFellreport;WoodandHumanHealthfactsheet
![Page 10: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/10.jpg)
![Page 11: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/11.jpg)
![Page 12: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/12.jpg)
![Page 13: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/13.jpg)
RosaParks
Elementary
School
Location:
Redmond,WA
Completed:
2006
Size:
66Ksf
550Students
Architect:
Mahlum
Architects
![Page 14: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/14.jpg)
![Page 15: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/15.jpg)
JapaneseStudy
Student impressions ofschoolbuildings byfactorscores
EvidenceBasedDesign
• Occupantsrespond
favorablytowood
• Japan&Canada
LearningAtmoshere
Familiarity Structure
App
eara
nce
Envi
ronm
ent
Cold-Warm
Unfriendly -Friendly
Anxious -Calm
Strict -Gentle
Machine -Hum
an
Difficult -Fun
Bad -Good
Hard -Soft
Unsettling -Relaxing
Dangerous -SafeDark -Bright
ApproachingtheDesignandPlanningforSchoolCapitalProgramwithWood,MikioMoronuki,Director,ResearchCenterforEducationalFacilities,
TomoeCorporation,Japan
![Page 16: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/16.jpg)
JapaneseStudy
Teacher impressions ofschoolbuildingsbyfactorscores
EvidenceBasedDesign
• Occupantsrespond
favorablytowood
• Japan&Canada
LearningAtmoshere
Familiarity Structure
App
eara
nce
Envi
ronm
ent
Cold-Warm
Unfriendly -Friendly
Anxious -Calm
Strict -Gentle
Machine -Hum
an
Artificial -Natural
Difficult -Fun
Bad -Good
Hard -Soft
(+) -(-) fragrance
Unsettling -Relaxing
Rushed -Slow
ApproachingtheDesignandPlanningforSchoolCapitalProgramwithWood,MikioMoronuki,Director,ResearchCenterforEducationalFacilities,
TomoeCorporation,Japan
![Page 17: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/17.jpg)
CrawfordBay
Elementary-
Secondary
SchoolK-12
Location:
CrawfordBay,
BC,Canada
Completed:
2004
Architect:
KMBR
Architects
Planners
![Page 18: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/18.jpg)
Marin
CountryDay
School
Location:
Corte
Madera,CA
Architect:
EHDD
Architecture
1st Zero
Energy
Classroom
Bldg.inNA
PhotoCredit:CesarRubio;JoshPartee;EHDD
![Page 19: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/19.jpg)
ExposedExteriorWoodFinishes
FlushT&GWoodSidingDistinguishesBuildingFrom
OthersonCampus
MarinCountryDaySchoolPhotoCredit:CesarRubio;JoshPartee;EHDD
![Page 20: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/20.jpg)
Hypoallergenic
Project:
JamesPark
Elementary,
Port
Coquitlam,BC
Completed:
2012
Size:
2story
370Students
![Page 21: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/21.jpg)
![Page 22: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/22.jpg)
DayLightingandVentilation
![Page 23: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/23.jpg)
![Page 24: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/24.jpg)
Richmond
Christian
SchoolK-12
Location:
Richmond,BC
Canada
Completed:
2008
Size:
38Ksf
Architect:
KMBR
Architects
Planners
![Page 25: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/25.jpg)
ElDorado
HighSchool
Location:
ElDorado,AR
Completed:
2011
Size:
322.5Ksf
1600students
Cost:
$134/sf
Architect:
CADM
Architecture
![Page 26: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/26.jpg)
AccommodatesScale
![Page 27: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/27.jpg)
![Page 28: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/28.jpg)
“Wedidacostanalysisandfound
thatwewereabletosaveabout$60K
bychangingtheroofconstruction
fromsteeltowood.”- Dunn
![Page 29: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/29.jpg)
CarbonBenefits
![Page 30: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/30.jpg)
“Nationwide,weappeartohaveadrop-outissuein
highschools,andwe’renotimmunetotheproblem
inElDorado.Wewantedsomethingthatwould
attractyoungpeople—notonlywiththecourse
offerings,curriculumandactivities,butwithan
appealingfacility”- Dunn
WOW!!Factor
![Page 31: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/31.jpg)
Burr&Burton
Academy-
Mountain
Campus
Location:
Peru,VT
Completed:
2012
Size:4kSF
LEEDPlatinum-
NetZero
Architect:
Bensonwood
![Page 32: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/32.jpg)
Mountain
Campushaswon
3Sustainable
DesignAwards
83LEEDPoints
![Page 33: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/33.jpg)
![Page 34: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/34.jpg)
Indian
Mountain
StudentArts&
Innovation
Center
Location:
Lakeville,CT
Completed:
2014
Size:8,740SF
Architect:
Flansburgh
Architects
PhotoCredit:RobertBensonPhotography
![Page 35: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/35.jpg)
PhotoCredit:RobertBensonPhotography
IndianMountainStudent
Arts&InnovationCenter
Exposedwoodchosenfor
warmthandtoreflect
school’snaturalsetting
• Glulambeams&
columns,salvagedwood
flooring
![Page 36: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/36.jpg)
TheWhite
Mountain
School:
Catherine
HoughtonArts
Center
Location:
Bethlehem,NH
NetZero
Panelized
Construction
Architect:
Bensonwood
![Page 37: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/37.jpg)
TheWhiteMountain
School’smissionof
sustainabilityisfulfilled
inthenewArtsCenter
thathouses:
• Anartstudio
• Severalmusicrooms
• Twodancestudios
![Page 38: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/38.jpg)
Cayucos
ElementaryK-
8
Location:
Cayucos,CA
Completed:
2009
Architect:
RRMDesign
Group
![Page 39: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/39.jpg)
ConstructionSpeed
![Page 40: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/40.jpg)
DGSSeismic-SafetySurveyofCalifornia
PublicSchoolBuildings
Construction Builtafter
July11978
Older
NotWood-Framed NotEvaluated
Wood-Framed NotEvaluated
Seismic Evaluation
NotEvaluated
![Page 41: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/41.jpg)
BethelSchool
District,
Tacoma,WA
Architect:
Erickson
McGovern
Engineer:
PCSStructural
Solutions
Contractor:
Babbit
Neuman
Construction
Company
![Page 42: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/42.jpg)
Project:
CloverCreek
ElementaryK-
6
Completed:
2012
Size:
63Ksf
645students
Cost:
$197/sf
![Page 43: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/43.jpg)
LowerConstructionCosts
![Page 44: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/44.jpg)
Project:
Bethel
Learning
Center
Completed:
2012
Size:
5.5Ksf
![Page 45: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/45.jpg)
Project:
Nelson
Elementary
Completed:
2009
Size:
63.5Ksf
600Students
Cost:
$241/sf
![Page 46: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/46.jpg)
12
47
18 19
7
0-25 26-50 51-75 76-100 100+
ServiceLifeandDurabilityN
umbe
r of B
uild
ings
Age Class – YearsSource: Demolition Study – Forintek Canada Corporation, Vancouver, B.C., Canada
![Page 47: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/47.jpg)
ServiceLifeandDurability
0%
20%
40%
60%
0-25 26-50 51-75 76-100 100+
Concrete
Steel
Wood
Perc
ent o
f Bui
ldin
gs
Age Class – YearsSource: Demolition Study – Forintek Canada Corporation, Vancouver, B.C., Canada
![Page 48: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/48.jpg)
Project:
ReadingCitadel
IntermediateHigh
School
Location:
Reading,PA
Renovations
Completed:
2010
Size:
189Ksf Renovation
122Ksf Addition
Cost:
$79M
![Page 49: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/49.jpg)
• 1872St.Joseph’sHospital
• HospitalAreasRe-Purposedto
Classrooms
• OriginalTimberFramedFloors
andRoofswereMaintainedand
IntegratedinRenovationsand
NewConstruction
![Page 50: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/50.jpg)
Durability
Adaptability
Late1800’sEraHospital
NowHometo3,000
Students,Grades9-10
![Page 51: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/51.jpg)
ExistingFloors:1-1/2”planking
on2x12Joistsat12”o.c.
ExistingRoof:SolidSawn,
LargeTrussMembers,Purlins
&Rafters
![Page 52: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/52.jpg)
Project:
Thompson
Elementary
K-6
Completed:
2006
Size:
65Ksf
550Students
Cost:
$169/sf
![Page 53: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/53.jpg)
ImprovedEnergyEfficiency
“Bethelspends34%lessperstudentthan
theaverageforallpeerdistricts”
Between2004and2011,BSDreducedkilowattusagebymorethan
7.6millionkilowattsandsaved$4.3millioninutilitycosts—
equivalenttothecostofelectricityfor15oftheDistrict’s
elementaryschoolsforoneyear.
![Page 54: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/54.jpg)
Project:
Spanaway
MiddleSchool
Grade7-9
Completed:
2008
Size:
101Ksf
1000Students
Cost:
$187/sf
![Page 55: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/55.jpg)
TheGreenSchoolhouseSeries
FoundedbyJeff&MarshallZotaraof“Cause&EffectEvolutions”
TheGreenSchoolhouseSeriesisasponsorshipdriveninitiativethat
bringscorporations,Foundations,SchoolDistricts,Municipalitiesand
Volunteerstogethertobuildhigh-performance,environmentally
sustainable,LEED-PlatinumK-12schoolhousestounderfundedareas.
TheGreenSchoolhouseSeries’missionistoreplaceaging,
environmentallyhazardousportableclassroomswithpermanent,
state-of-theartsustainableGreenSchoolhouses.
VISION:
MISSION:
![Page 56: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/56.jpg)
Project:
TheSafariat
Roadrunner
Elementary
School
Location:
Phoenix,AZ
Size:
6,250SF
LEEDPlatinum
Green
Schoolhouse
SeriesProject
![Page 57: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/57.jpg)
“TheSafari”GivenGreenRibbonSchoolAward
Awardedin2012(Source:USDepartmentofEducation)
TheU.S.Department ofEducation'sGreenRibbonSchools(ED-GRS)recognition
awardhonorsschoolsthatareexemplary inreducingenvironmental impactand
costs; improvingthehealthandwellness ofstudents andstaff;andproviding
effectiveenvironmentalandsustainability education,whichincorporatesscience,
technology,engineering, andmathematics (STEM),civicskillsandgreencareer
pathways.
![Page 58: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/58.jpg)
“TheSafari”was1st LEEDPlatinumSchool
• Energyconsumptionreducedby17.5%in1st year
• EnergyConsumptionreducedby35.2%asofNov.
2011
• OverallEnergyStarRatingof87
• HaswonEnergyStarBuildingRecognition2
consecutiveyears
![Page 59: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/59.jpg)
AlbertLeaHigh
School
Location:
AlbertLea,MN
Completed:
2000
Size:
128Ksf
1,100Students
Architect:
Enigma
Architecture
![Page 60: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/60.jpg)
VashonIsland
HighSchool
Location:
VashonIsland,
WA
Completed:
2014
Size:84,000SF
Architect:
IntegrusArchitecture,PS
Cost:$34M
PhotoCredit:LaraSwimmer
![Page 61: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/61.jpg)
PhotoCredit:LaraSwimmer
VashonIslandHighSchool
• 525Students
• Glulambeams,lightframewalls,
prefabricatedwoodtrusses
• 2Stories,TypeVConstruction
• Local,sustainablyharvested
Douglas-Firusedasinterior
finishes
![Page 62: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/62.jpg)
AnnReidEarly
Childhood
Center
Location:
Naperville,IL
Completed:
2010
LEEDSilver
Size:
300Students
Architect:
Wight&
Company
![Page 63: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/63.jpg)
AnnReidECCreceivedtheLeadershipinEnergyandEnvironmental
DesigncertificationfromtheU.S.GreenBuildingCouncil
![Page 64: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/64.jpg)
Havens
Elementary
School
Location:
Piedmont,CA
Completed:
2010
Size:
46Ksf
Architect:
ATIArchitects
andEngineers
![Page 65: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/65.jpg)
![Page 66: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/66.jpg)
JacobE.
Manch
Elementary
Location:
LasVegas,NV
Completed:
2009
Size:
70Ksf
Architect:
SSA
Architecture
![Page 67: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/67.jpg)
![Page 68: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/68.jpg)
![Page 69: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/69.jpg)
Project:
Samuel
Brighouse
Elementary,
Richmond,BC
Completed:
2011
Size:
50.6Ksf
505Students
Architect:
Perkins+Will
![Page 70: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/70.jpg)
FountainLake
MiddleSchool
Location:
HotSprings,
AR
Size:
48Ksf
Architect:
DouglasA.
Arnoldand
Associates
![Page 71: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/71.jpg)
§Initialsteel/masonryestimate$150/sf
§Woodframefinalcost$107/sf
§Over$2Msavings
![Page 72: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/72.jpg)
Osceola
Elementary
School
Location:
Osceola,AR
Completed:
2012
Size:
71.5Ksf
Architect:
MGK
Architects
![Page 73: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/73.jpg)
Woodframing
provided
$10/SFsavings
whencompared
toother
building
materials
![Page 74: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/74.jpg)
Newport
Elementary
School
Location:
Newport,AR
Completed:
2010
Size:
124Ksf
Architect:
Brackett
Krennerich
Architects
![Page 75: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/75.jpg)
OverallProjectsSavingswerealmost$30/SF
AccordingtotheArchitect,approx.$20/SF
SavingswereAttributedtoWoodConstruction
![Page 76: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/76.jpg)
NewportElementarySchool• TypeVBConstruction
• ClassroomRoofConstruction:
I-joistsrafters&wood
sheathing
• GymnasiumRoof
Construction:
Exposedglulamtrusses
andbeams
• ExteriorWall
Construction:
Loadbearingwood
studs
![Page 77: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/77.jpg)
Project:
TheBriefOpen
Academy,
Norwhich,UK
Completed:
2011
Size:
102Ksf
![Page 78: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/78.jpg)
Project:
Franklin
Elementary,
FranklinWV
Completed:
2015
Size:
40Ksf
2Stories
Architect:
MSESArchitects
![Page 79: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/79.jpg)
PhotoCredit:PamWean,MSESArchitects
![Page 80: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/80.jpg)
Questions?
WoodWorks
www.woodworks.org
ThisconcludesTheAmericanInstituteofArchitectsContinuingEducationSystemsCourse
![Page 81: Exceeding Cost and Performance Objectives with Wood-Frame](https://reader031.vdocuments.us/reader031/viewer/2022030319/5866ce311a28ab5e408b8e05/html5/thumbnails/81.jpg)
ThispresentationisprotectedbyUS
andInternationalCopyrightlaws.
Reproduction,distribution,displayanduseof
thepresentationwithoutwrittenpermission
ofthespeakerisprohibited.
©TheWoodProductsCouncil2016
CopyrightMaterials