HALT/Reliability Testing
Evaluating The Uncertainty Gap
By Joel MandelJan 2007
![Page 2: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/2.jpg)
Uncertainty Gap Problem
How far is our theoretical design from real capabilities?
![Page 3: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/3.jpg)
HALT Margin Discovery
Stress
UpperDestruct
Limit
LowerDestruct
Limit
UpperOperating
Limit
LowerOperating
LimitProductSpecs
Margin Margin
OperatingOperating
Destruct Margin Destruct Margin
![Page 4: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/4.jpg)
The Million Dollar question
![Page 5: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/5.jpg)
is a science-based approach to reliability that uses modeling and Simulation to design-in reliability. This approach models the root causes of failure such as fatigue, fracture, wear, and corrosion ..
Physics Of Failures
![Page 6: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/6.jpg)
Physics Of Failures
![Page 7: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/7.jpg)
Thermodynamics
![Page 8: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/8.jpg)
Design Objective
• Any system will fail so the objective is delay the failures or to weed out the first failures./or the weak parts of the
system
![Page 9: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/9.jpg)
Correct Answer
We must test to cause failures not to test to
demonstrate successful achievement
![Page 10: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/10.jpg)
Physics of Failures Models
• Exponential Model Ae-Bx film resistors ceramic capacitors life temperature dependence
• Power model AV-b Voltage
• Arrhenius (A)1/T e-c/T
temperture dependent processes including diffusion and corrosion
![Page 11: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/11.jpg)
![Page 12: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/12.jpg)
Every stress source and failure mechanism has a different characteristic
exponential relationship
![Page 13: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/13.jpg)
![Page 14: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/14.jpg)
High Accelerated Life Testing
Halt
Temp-High Low
Temp Rapid Cycling
Vibration
Combines testing
Power
![Page 15: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/15.jpg)
![Page 16: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/16.jpg)
Vibration Testing Logic
![Page 17: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/17.jpg)
![Page 18: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/18.jpg)
![Page 19: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/19.jpg)
Four Corner VoltageTemperature Halt Test
![Page 20: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/20.jpg)
![Page 21: Evaluating the uncertainty_gap_halt_reliability_testing](https://reader035.vdocuments.us/reader035/viewer/2022081603/557b2ac5d8b42a796a8b55c2/html5/thumbnails/21.jpg)