Transcript

RatesItem No.Item DescriptionUnitFata03-12-cExcavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade IIIm3557.6903-16-aFilling, watering and ramming earth under floor with surplus earth from foundation, etcm3109.8003-23-bExcavation in foundation of building, bridges etc complete : In ordinary soilm3228.1803-23-d### Excavation in foundation of building, bridges etc complete : In shingle/gravelm3287.2106-05-fPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)m37398.3206-05-hPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:3:6)m36018.5106-05-iPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8)m35385.0306-06-a-02RCC in roof slab, beam, column & other structural members, insitu or precast. Type B (1:1.5:3)m311187.1206-06-a-03RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)m310094.8406-06-eAdd extra labour for RCC in 2nd & subsequent storeysm3772.2006-07-bSupply & fabricate M.S. reinforcement for cement concrete (Deformed bars)tonne120459.1306-22-a-02Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2" thick)m2602.5907-04-a-05Pacca brick work in foundation and plinth in Cement, sand mortar 1:6m37352.8907-05-a-03Pucca brick work in ground floor Cement, sand mortar 1:4m38230.6407-05-a-05Pucca brick work in ground floor Cement, sand mortar 1:6m37827.2807-06-aAdd extra labour on item No.07-05 for brickwork in First floorm3283.6607-30Supplying and filling sand under floor or plugging in wellsm32664.3709-05Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RC roof slabm2945.2309-15Khuras on roof 2'x2'x6"Each525.1509-16Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8Each1260.0709-19-aCast iron rain water down pipe fixed in position excl. heads & shoes : 4" diam2582.5209-21Shoes, bends or offsets for cast iron ran water down pipe, incl. fixing & paintingEach380.8009-23Laying 1/2" thick deodar ceiling complete, incl. sawing, planing & fixingm21555.6810-24Lay floor of white glazed tile 1/4" thick in white cement 1:2 over 3/4" thick cement mortar 1:2m21786.6610-26-aProvide & lay marble fine dressed stone flooring on surface in white cement complete: 3/4" thickm23189.1910-41-bProvide & lay marble fine dressed stone dado or skirting in white cement complete : 1/2" thickm22952.1611-09-bCement plaster 1:4 upto 20' height 1/2" thickm2201.2511-18-bCement pointing struck joints, on walls, upto 20' height : Ratio 1:3m2180.7812-50MS flat 1/2"x1/8" grill in windows of approved design incl. painting 3 coats, completem21589.0513-06-c-01Prepare & Paint new surface, doors & windows Priming coatm287.8913-06-c-02Prepare & Paint new surface, doors & windows Each subsequent coat of paintm256.3413-30-aPreparing surface and painting with emulsion paint : First coatm2118.6613-30-bPreparing surface and painting with emulsion paint : 2nd & each subsequent coat.m258.0114-03-aP&F glazed earthern ware WC squatting type with built-in foot rests : WhiteEach3343.7314-05-a-01P&F glazed earthern ware WHB complete Size 22"x16" : White with pedestalEach3441.9014-10-aP&F glazed earthern ware low down flushing cistern 3 gallons capacity : WhiteEach2697.0414-16-aP&F CP towel rail : 24" long, 3/4" diaEach580.7114-17P&F best quality 5mm mirror 22"x16" sizeEach1733.9414-20-aP&F Plastic soap dish.Each358.9514-20-dP&F Plastic shelf 24"x5" withEach289.6514-21-bP&F CP pillar-cock, heavy type : 1/2"Each753.9614-22-bP&F CP stop-cock, heavy type : 1/2"Each795.5414-24-bP&F CP bib-cock, heavy type : 1/2"Each740.1014-31-bP&F CI floor trap incl. CI grating & concrete chamber all round : 4"x3"Each486.9514-32-bP&F 'P' trap incl. GI grating & PCC chamber 4" glazedEach264.3114-34-b-01Providing and fitting CI soil pipe with : Cement caulked joint : 4" diam860.4514-34-b-02Providing and fitting CI soil pipe with : Cement caulked joint : 2" diam577.5715-02-b-02S&E PVC pipe for wiring purpose complete Recessed in walls incl. chase etc : 3/4" i/dm131.1815-02-b-03S&E PVC pipe for wiring purpose complete Recessed in walls incl. chase etc : 1" i/dm141.2215-05-cS&E single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029"m44.0615-09-aS&E MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 4"x4"Each238.5715-09-eS&E MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 10"x12"Each711.1615-14S&E 9" long swan neck plain brass/steel/brass oxidised bracket lamp holder, completeEach127.2115-42S&E 2'x2'x1/8" copper plate incl. rivetting to copper tape & placing in mixture of salt etcEach6705.2015-50Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessedEach1200.5515-51Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessedEach893.2615-61-aS&E fluorescent tube light fitting incl. 4' rod, choke, starter, flexible wire etc : SingleEach1369.1415-62S&E porch-light fitting round/square type with gallery, holder & 40 W bulbEach1035.5215-68-cS&E best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweepEach5375.6615-69-aS&E best quality exhaust fan complete with shutter & regulator : 12"sweepEach3552.0915-71-aS&E single phase imported auto circuit breaker 6 Amp.Each1000.8715-71-dS&E single phase imported auto circuit breaker 30 Amp.Each1243.4215-75-b### S&E cubical type factory fabricated floor/wall mounting steel main board comp. : RecessedEach23038.3223-01-aP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 4"m440.6723-01-bP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 6"m592.3923-01-cP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 9"m787.5224-16-c-01P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1/2" i/dm208.0124-16-c-02P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3/4" i/dm280.1124-16-c-03P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1" i/dm377.7424-16-c-06P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 2" i/dm531.0024-33### S/F MS manhole cover of 0.25" thick sheet & angle iron frame 2"x2"x0.25" with lock completem26055.7925-36P&F MS angle iron 1"x1"x1/4" edge protector nozing of steps of stairs, completem435.5425-39-b-03P&F steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 3mmm25785.3425-41P&F angle iron railing, using 2.5"x2.5"x3/8" angle iron post 4.5'long, 5'to 6" apart, completem3497.0326-17Making notice board 1/2" thick of c/s mortar 1:3 with 2"x1/2" beadingm2983.2521-01-a-01Excavate well in dry & dispose of soil within 50m In ordinary soil or sand : Upto 1.5 m depthm3156.6421-01-a-02Excavate well in dry & dispose of soil within 50m In ordinary soil or sand : 1.5 to 3 m depthm3163.6021-01-a-03Excavate well in dry & dispose of soil within 50m In ordinary soil or sand : 3 to 4.5 m depthm3184.4621-01-c-01Excavate well in dry & dispose of soil within 50m In hard strata like shingle : Upto 1.5 m depthm3411.5221-01-c-02Excavate well in dry & dispose of soil within 50m In hard strata like shingle :1.5 to 3 m depthm3426.2821-01-c-03Excavate well in dry & dispose of soil within 50m In hard strata like shingle : 3 to 4.5 m depthm3444.4126-15Spraying anti-termite liquid mixed with water in the ratio of 1:40m2/spray33.2910-45### P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2" thick sand & 4" thick brick ballast compm21381.6612-53-d-02S&F aluminium door/window, Premium 4" sect. Hinges windowm210355.7314-69-b-04### P/F Polyethylene Water Tank (Super Tuff) 1000 gallons (Vertical)Each70856.6615-05-aS&E single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029"m38.47EndNSIProviding 2" coping (1:2:4)NSIBrick Ballast under floorNSI3/4" Thick plaster PUDLO 1:3 CSMNSI1/2" Thick plaster PUDLO 1:2 CSMNSIP/L of bricks bats in Soakage pitNSIBrick Ballast or shingle under floorNSIP&L of polythene sheet on roofNSIPre cost lining (Rings)NSIPVC 4 core cable 25mmNSIwater pump assembly with all accessoriesNSIPumping Machinery and External ElectrificationNSIBoardsNSILetteringNSIAuto circuit breaker 6 Amp importedNSI

Abstract of costAbstract of Cost Lab's/Resource Room & Multipurpose Hall, GEC For GirlsS. No.DescriptionsAmount (Rs)1Main Building9,085,6712,6069,085,6712Internal Water Supply250,9673Internal Electrification313,0104Septic Tank98,9095Soakage Pit37,772Total:9,786,3292,8079786329.25497672Difference:

&R&12&P&R&12&P&R&12&P

Costs of Main,Elect,W SupplyS. No.CSR Item No.DescriptionUnitQtyRate (Rs.)Amount (Rs.)Lab's/Resource Rooms & Multipurpose Hall, GEC for GIRLS103-12-cExcavation in foundation of building, bridges etc complete : In shingle gravelm3186.98557.69104,276203-16-aFilling, watering and ramming earth under floor with surplus earth from foundation, etc.m3148.13109.8016,264306-05-iPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8).m357.125,385.03307,572406-05-fPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4).m336.697,398.32271,431506-06-a-02RCC in roof slab, beam, column & other structural members, insitu or precast. 3000 PSI.m373.0711,187.12817,496606-07-bSupply & fabricate M.S. reinforcement for cement concrete (Deformed bars)tonne11.09120,459.131,335,529706-22-a-02Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2" thick).m25.16602.593,108807-04-a-05Pacca brick work in foundation and plinth in Cement, sand mortar 1:6.m346.467,352.89341,586907-05-a-05Pucca brick work in ground floor Cement, sand mortar 1:6.m373.177,827.28572,6891007-30Supplying and filling sand under floor or plugging in wells.m332.922,664.3787,70611NSISupplying Shingle under floor.m332.92480.0915,8041209-05Single layer of tiles of approved size laid over 4" earth and 1" mud plaster on top of RC roof slab.m2324.07945.23306,32213NSIP&L of polythene sheet on roof.m2324.0740.0012,96314NSIP&L of Jumbolon on roof.m2324.07807.00261,5251509-15Khuras on roof 2'x2'x6" .Each7525.153,6761609-16Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8.Each71,260.078,8201709-19-aCast iron rain water down pipe/PVC Polyfit fixed in position excl. heads & shoes : 4" dia.m1002,582.52258,2521809-21Shoes, bends or offsets for cast iron ran water down pipe, incl. fixing & painting.Each40380.8015,2321910-26-aProvide & lay marble fine dressed stone flooring on surface cement complete: 3/4" thick.m2370.193,189.191,180,5952010-41-bProvide and lay marble fine dressed stone dado or skirting in white cement complete: 1/2" thick.m219.012,952.1656,1082111-09-bCement plaster 1:4 upto 20' height 1/2" thick.m21323.70201.25266,3952212-50MS flat 1/2"x1/8" grill in windows of approved design incl. painting 3 coats, complete or as approved.m254.651,589.0586,8362313-06-c-01Prepare & Paint new surface in joinery where required, Priming coat.m285.5087.897,5142413-06-c-02Prepare & Paint new surface in joinery where required, First coat.m285.5056.344,8172513-06-c-02Prepare & Paint new surface in joinery where required, 2nd coat.m285.5056.344,8172613-06-c-02Prepare & Paint new surface in joinery where required, 3rd coat.m385.5056.344,8172713-30-aPreparing surface and painting with emulsion paint : Priming coat.m1884.20118.66104,9191020.072813-30-bPreparing surface and painting with emulsion paint : First coat.m2884.2058.0151,2952913-30-bPreparing surface and painting with emulsion paint : 2nd coat.m2884.2058.0151,2953013-30-bPreparing surface and painting with emulsion paint : 3rd coat.m2884.2058.0151,29531NSIMaking and fixing deodar doors with frames and lasani panels.m242.759,146.00391,0003212-53-d-02P&F Aluminium windowsm254.6510,355.73565,90833NSIProviding wire mesh.m2135.87645.6087,72034NSIProviding and applying Grafiato on exterior wall surfaces.m2135.87538.0073,10035NSIProviding Pre-cast slab.m2324.072,152.00697,4003609-23Providing and fixing gypsem board false ceiling.m2324.071,555.68504,1523710-45Providing Tuff Tiles as per approved source and design.m258.551,381.6680,8973810-24Providing ceramic tiles.m235.131,786.6662,7663926-15Spraying Anti-termite liquid in foundation.m2353.7233.2911,774Total:9,085,671Internal Water Supply114-03-aP&F glazed earthern ware WC squatting type with built-in foot rests : WhiteEach23,343.736,687214-05-a-01P&F glazed earthern ware WHB complete Size 22"x16" : White with pedestalEach23,441.906,884314-10-aP&F glazed earthern ware low down flushing cistern 3 gallons capacity : WhiteEach22,697.045,394414-16-aP&F CP towel rail : 24" long, 3/4" diaEach2580.711,161514-17P&F best quality 5mm mirror 22"x16" sizeEach21,733.943,468614-20-aP&F Plastic soap dish.Each2358.95718714-20-dP&F Plastic shelf 24"x5" withEach2289.65579814-21-bP&F CP pillar-cock, heavy type : 1/2"Each5753.963,770914-22-bP&F CP stop-cock, heavy type : 1/2"Each4795.543,1821014-24-bP&F CP bib-cock, heavy type : 1/2"Each5740.103,7011114-31-bP&F CI floor trap incl. CI grating & concrete chamber all round : 4"x3"Each2486.959741214-32-bP&F 'P' trap incl. GI grating & PCC chamber 4" glazedEach2264.315291314-34-b-01Providing and fitting CI soil pipe with : Cement caulked joint : 4" diam13860.4511,1861414-34-b-02Providing and fitting CI soil pipe with : Cement caulked joint : 2" diam10577.575,7761524-16-c-01P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1/2" i/dm30208.016,2401624-16-c-02P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3/4" i/dm30280.118,4031724-16-c-03P&L, cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1" i/dm30377.7411,33218NSIConstruction of Main Hole 18"Each42,500.0010,0001923-01-cP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 9"m70787.5255,1262014-69-b-04P&F Polythylene water tank (super tuff) 1000 Gallons.Each170,856.6670,85721NSIProviding and fixing Muslim shower.Each51,000.005,00022NSIWater Pump (1 hp) assembly with all accessoriesEach215,000.0030,00023NSIProviding and fixing sink.Each050000.0Total:250,967Internal Electrification115-02-b-03S&E PVC pipe for wiring purpose complete Recessed in walls incl. chase etc : 1" i/dm170141.2224,007215-05-aS&E single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029"m38038.4714,620315-05-cS&E single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029"m27044.0611,897415-09-eS&E MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 10"x12"Each6711.164,267515-09-aS&E MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 4"x4"Each4238.57954615-42S&E 2'x2'x1/8" copper plate incl. rivetting to copper tape & placing in mixture of salt etcEach16,705.206,705715-51Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessedEach12893.2610,719815-50Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessedEach411,200.5549,223915-61-aS&E fluorescent tube light fitting incl. 4' rod, choke, starter, flexible wire etc : SingleEach181,369.1424,6441015-62S & E Verandah Light fitting round/square type with gallery , holder and 40 w bulbEach91,035.529,3201115-68-cS&E best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweepEach145,375.6675,2591215-69-aS&E best quality exhaust fan complete with shutter & regulator : 12"sweepEach23,552.097,1041315-71-aS&E single phase imported auto circuit breaker 6 Amp.Each101,000.8710,0091415-71-dS&E single phase imported auto circuit breaker 30 Amp.Each11,243.421,2431515-75-b### S&E cubical type factory fabricated floor/wall mounting steel main board comp. : RecessedEach123,038.3223,03816NSIPVC 4 Core Cable 25mmm401,000.0040,000Total:313,010

&R&12&P&R&12&P&R&12&P

Estimate of Main BuildingEstimate of Lab's/Resource room, GEC For GIRLS1. Excavation in foundationNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Wall footing section - A1643.003.50672.00Wall footing section - B1201.502.5075.00Column footing -F11154.005.001100.00Column footing -F2764.006.001008.00Column footing -F3774.007.001372.00Column footing -F4484.008.001024.00Column footing -F5354.005.00300.00Plinth protection12100.673.00420.00Toe wall12101.250.37598.44Drain12101.331.50418.95Front steps11150.333.00113.85Total (1):6602.24 cft186.98 m32. PCC (1:4:8) in foundationNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Wall footing section - A1640.753.50168.00Wall footing section - B1200.252.5012.50Column footing -F11150.255.0068.75Column footing -F2760.256.0063.00Column footing -F3770.257.0085.75Column footing -F4480.258.0064.00Column footing -F5350.255.0018.75Plinth protection12100.253.00157.50Toe wall12100.330.37525.99Drain12100.331.50103.95Front steps11150.253.0086.25Total (2):854.44 cft24.20 m33. RCC (1:1.5:3) in FoundationNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Column footing -F11150.755.0018.75Column footing -F2761.006.0036Column footing -F3771.007.0049Column footing -F4481.258.0080Column footing -F5350.755.0018.75Plinth Beam1.00660.001.251.00825S.Total:1027.50 cftWastage @ 5%151.3851.38 cftS.Total:51.38 cftTotal (3):1078.88 cft30.55 m34. BB work in CSM (1:6) in PlinthBrick workNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Wall section - A (1'-10.5" step)1640.51.87560.00Wall section - A (1'-6" step)1640.51.50048.00Wall section - A (13" step)1640.51.12536.00Wall section - A (9" step)1642.750.75132.00Wall section - B (13" step)1200.51.12511.25Wall section - B (9" step)1200.750.7511.25Wall section - B (4.5" step)12020.7530.00Wall b/w NSL & Plinth level129021.13652.50S.Total:981.00 cftBB work in front StepsNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Step 111150.53172.50Step 211150.52115.00Step 311150.5157.50S.Total:345.00 cftBB work in Drain & Toe wallNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Toe wall121010.37578.75Drain221010.375157.50S.Total:236.25 cftWastage @ 5%178.1178.11 cftS.Total:78.11 cftTotal (4):1640.36 cft46.46 m35. BB work in CSM (1:6) in Ground Floor (9" thick)NoLength (ft)Depth (ft)Width (ft)Quantity (cft)External walls 9" thick1010.000.750.00Internal walls 9" thick138010.000.752850.00Internal walls 4.5" thick12010.000.37575.00Above bond beam12301.750.375150.94S.Total:3075.94 cftWastage @ 5%1153.80153.80 cftS.Total:153.80 cftParapet wallNoLength (ft)Depth (ft)Width (ft)Quantity (cft)131020.75465.00 cftS.Total:465.00 cftDeductionsNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Columns321101320.00D184100.75240.00D223.5100.7552.50D422.570.7526.25D32370.7531.50W116660.75432.00Ventilators2320.759.00S.Total:1111.25 cftTotal (5):2583.48 cft73.17 m36. RCC (1:1.5:3) in Columns, beams, lintels etc.Level - 1NoLength (ft)Depth (ft)Width (ft)Quantity (cft)Column (C1)2016.01120.00Column (C2)816.0148.00Column (C3)416.0124.00Level - 2Column (C1)20110.01200.00Column (C2)8110.0180.00Column (C3)40.7510.00.7522.50Bond Beam (BB1)13052.01610.00Bond Beam (BB2)11001.00.7575.00Bond Beam (BB3)1442.0188.00Projections12800.58162.40S.Total:1429.90 cftWastage @ 5%171.5071.50 cftS.Total:71.50 cftTotal (6):1501.40 cft42.52 m37. Steel ReinforcementIn foundationNoLength of barsBar #wt (lb/rft)Quantity (lbs)Footing - F11195.8640.668704.36Footing - F27184.6040.668863.19Footing - F37249.0040.6681164.32Footing - F44208.2540.668556.44Footing - F5395.8640.668192.10Plinth Beam1396130.3761489.151402661.5026047.05S.Total:11016.61 lbsIn slabs, beams, columns etc.NoLength of barsBar #wt (lb/rft)Quantity (lbs)Level - 1Columns - C12029.1730.376219.332028.454361.502854.77Columns - C2829.1730.37687.7382440.668128.2682461.502288.38Columns - C3329.1730.37632.9032461.502108.14Level - 2Columns - C12047.8330.376359.71204061.5021201.60Columns - C2829.1730.37687.7384040.668213.7684061.502480.64Columns - C3334.1730.37638.5434061.502180.24Bond beam (BB1)12876.5030.3761081.561244061.5023664.88Bond beam (BB2)140130.376150.78140061.502600.80Bond beam (BB3)1415.642857142930.376156.28135261.502528.70Column dowel153061.502796.06Projetions994.70S.Total:12255.50 lbsWastage @ 5%11163.611163.61 lbsS.Total:1163.61 lbsTotal (7):24435.72 lbs11.09 tonne8. Filling and compacting of earth under floorsNoLength (ft)Width (ft)Depth (ft)Quantity (cft)Under floor134871.505230.50Total (8):5230.50 cft148.13 m39. Sand Cushion Under floor (4" thick)NoLength (ft)Width (ft)Depth (ft)Quantity (cft)Under floor1348700.331162.33Total (9):1162.33 cft32.92 m310. Brick Ballast under floors (4" thick)NoLength (ft)Width (ft)Depth (ft)Quantity (cft)Under floor1348700.331162.33Total (10):1162.33 cft32.92 m311. PCC (1:4:8) under floor 4" thickNoLength (ft)Width (ft)Depth (ft)Quantity (cft)Under floor1348700.331162.33Total (11):1162.33 cft32.92 m312. PCC (1:2:4) under floor 4" thickNoLength (ft)Width (ft)Depth (ft)Quantity (cft)Under floor1348700.17581.17Total (12):581.17 cft16.46 m313. Marble FlooringNoLength (ft)Width (ft)Quantity (sft)Under floor133953395.00S.Total:3395.00 sftFront stepsNoLength (ft)Width (ft)Quantity (sft)Treads31151.08372.60Risers41150.46211.60Sides of steps2124.00S.Total:588.20 sftTotal (13):3983.20 sft370.19 m214. PCC (1:2:4) filling in doors/windows framesGround FloorNoLength (ft)Depth (ft)Width (ft)Quantity (cft)D18180.250.7527.00D2223.50.250.758.81D32350.250.7513.13D4222.50.250.758.44W116240.250.7572.00Ventilators2100.250.753.75Total (14):133.13 cft3.77 m315. Plaster in CS mortar (1:4) 1/2 " thickSidesNo.Length (ft)Height (ft)Quantity (sft)External walls 9" thick21010.000Internal walls 9" thick2138010.007600Above bond beam01380.001.750Internal walls 4.5" thick01010.000Wall b/w NSL & Plinth level13150.752472.5S.Total:8073 sftColumns & beamsSidesNo.Length (ft)Height (ft)Quantity (sft)Columns4321162048.00Beams115104.002040.00Projections11280.002560.00S.Total:4648.00 sftParapet wallSidesNo.Length (ft)Width (ft)Quantity (sft)113106.752092.50S.Total:2092.50 sftFront stepsSidesNo.Length (ft)Width (ft)Quantity (sft)Threads131151.00452.00Risers141150.5339.00S.Total:791.00 sftDrainSidesNo.Length (ft)Width (ft)Quantity (sft)112103.5735.00S.Total:735.00 sftDeductionsSidesNo.Length (ft)Height (ft)Quantity (sft)D128410640D2223.510140D3222.5770D4222.5770W1216661152Ventilators223224S.Total:2096.00 sftTotal (15):14243.00 sft1323.70 m216. Painting of new surfacesSidesNo.Length (ft)Height (ft)Quantity (sft)External walls 9" thick110100Internal walls 9" thick21380107600Internal walls 4.5" thick212010400S.Total:8000 sftColumns, beams, projections etcSidesNo.Length (ft)Height (ft)Quantity (sft)Columns4321101280.00Beams1151042040.00Projections11452.001290.00S.Total:3610.00 sftDeductionsSidesNo.Length (ft)Height (ft)Quantity (sft)D128410640D2223.510140D3222.5770D4222.5770W1216661152Ventilators223224S.Total:2096.00 sftTotal (16):9514.00 sft884.20 m217. P/F wooden DoorsNo.Width (ft)Height (ft)Quantity (sft)D18410320D2123.51070D3522.5735D4522.5735Total (17):460.00 sft42.75 m218. P/F Aluminium Windows with wire guazeNo.Width (ft)Height (ft)Quantity (sft)Windows1666576VentilatorsVentilators23212Total (18):588.00 sft54.65 m219. P/F Steel Windows GrillNo.Width (ft)Height (ft)Quantity (sft)Windows1666576VentilatorsVentilators23212Total (19):588.00 sft54.65 m220. Painting of doorsSidesNo.Width (ft)Height (ft)Quantity (sft)D128410640D2223.510140D3222.5770D4222.5770Total (20):920.00 sft85.50 m221. 1/2" thick marble skirtingNo.Length (ft)Height (ft)Quantity (sft)Science Lab11000.5050.00Computer Lab11000.5050.00Office2450.5045.00Store2330.5033.00Verandah 12 ft1360.5018.00Verandah 9 ft2330.5033.00S.Total:229.00 sftDeductionsNo.Length (ft)Height (ft)Quantity (sft)D1840.5016.00D2D223.50.503.50D3D322.50.502.50D4D322.50.502.50S.Total:24.50 sftTotal (21):204.50 sft19.01 m222. Single Layers of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on roofLength (ft)Width (ft)Quantity (sft)3487Total (22):3487324.07 m223. P/L of polythene sheet on roofLength (ft)Width (ft)Quantity (sft)Roof3487Total (23):3487.00 sft324.07 m224. PCC 1:2:4 on roofLength (ft)Width (ft)Quantity (cft)Roof34870.17581.17Total (24):581.17 cft16.46 m325. P/L of Jumbolon on roofLength (ft)Width (ft)Quantity (sft)Roof3487Total (25):3487.00 sft324.07 m226. Making Khurras on roof 2' x 2' x 6"800Total (26):7 Nos4297.227. Bottom Khurass of brick masonry in Cement Mortar (1:6) 4' x 2' x 4.5"Total (27):7 Nos28. Wire meshNoArea (sft)Quantity (sft)11462.00 sft1462Total (28):1462.00 sft135.87 m229. Providing and applying Graiato on exterior wallsExternal wallsSidesNo.Length (ft)Height (ft)Quantity (sft)External walls 9" thick11205102050.00S.Total:2050.00 sftDeductionSidesNo.Length (ft)Height (ft)Quantity (sft)Windows11666576.00Ventilators123212.00S.Total:588.00 sftTotal (29):1462.00 sft135.87 m230. 2" thick DPC of PCC (1:2:4)No.Length (ft)Width (ft)Quantity (sft)Wall footing section - A1640.7548.00Wall footing section - BWall footing section - E1200.3757.50Total (30):55.50 sft5.16 m231. Providing Pre-cast slabNo.Length (ft)Width (ft)Quantity (sft)134873487.00Total (31):3487.00 sft324.07 m232. Providing and fixing gypsum board false ceilingNo.Length (ft)Width (ft)Quantity (sft)False ceiling134873487.00Total (32):3487.00 sft324.07 m233. Providing tuff tiles for plinth protectionNo.Length (ft)Width (ft)Quantity (sft)Tuff tiles12103630.00Total (33):630.00 sft58.55 m234. Providing ceramic tilesNo.Length (ft)Height (ft)Quantity (sft)Toilet walls1575285.00Toilet floors19393.00Total (34):378.00 sft35.13 m235. Spraying Anti-termite liquid in foundation.No.Length (ft)Perimeter (ft)Quantity (sft)Wall-A1649.5608.00Wall-B1205.5110.00Column footing -F11111420880.00Column footing -F277424672.00Column footing -F377428784.00Column footing -F444432512.00Column footing -F533420240.00Total (35):3806.00 sft353.72 m2

&R&12&P6 rise6 rise6 rise6 rise6 rise&R&12&P&R&12&P

Cost of Septic TankS. No.CSR Item No.DescriptionUnitQtyRate (Rs.)Amount (Rs.)Septic Tank (10 ft x 4 ft)103-16-aFilling, watering and ramming earth under floor with surplus earth from foundation, etcm30.398109.8043.65203-12-cExcavation in foundation of building, bridges etc complete :m322.688557.6912,652.97306-05-iPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8)m31.1615,385.036,252.79406-05-fPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)m30.2477,398.321,827.61506-06-a-02RCC in roof slab, beam, column & other structural members, insitu or precastm30.73311,187.128,197.87606-07-bSupply & fabricate M.S. reinforcement for cement concrete (Deformed bars)tonne0.0396120,459.134,767.65707-04-a-05Pacca brick work in foundation and plinth in Cement, sand mortar 1:6m34.8697,352.8935,803.96807-30Supplying and filling sand under floor or plugging in wellsm30.2842,664.37756.14911-09-bCement plaster 1:4 upto 20' height 1/2" thickm296.190201.2519,358.201023-01-cP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 6"m9.144787.527,200.731114-34-b-02Providing and fitting CI soil pipe with : Cement caulked joint : 2" diam1.000577.57577.391206-22-a-02Providing 2" coping (1:2:4)m22.440602.591,470.08Total:98,909

&R&12&P

Estimate of Septic TankEstimation for Septic Tank (10 ft x 4 ft)1. Excavation for Septic TankNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Size: Internal (10 ft x 4 ft)114.56.58.5801.13Total (1):801.13 cft22.69 m32. PCC (1:4:8) in foundationNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Long wall212.750.5225.5Short wall22.750.525.5Base1100.25410Total (2):41.00 cft1.16 m33. Back filling of earth in baseNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Base18.750.5832.7514.04Total (3):14.04 cft0.40 m34. Sand Filling under baseNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Base19.250.3333.2510.021Total (4):10.02 cft0.28 m35. PCC (1:2:4) in baseNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Base19.6250.253.6258.723Total (5):8.72 cft0.25 m36. RCC (1:2:4)NoLength (ft)Depth (ft)Width (ft)Quantity (cft)Top slab120.333624Baffle wall51.5000.251.875Total (6):25.88 cft0.73 m37. Steel in slabSpacingNo.Length(ft)Wt. (lb/ft)Quantity (lbs)Main steel#3@8"c/c1960.37642.86Distribution steel#3@12"c/c7120.37631.58Baffle wall340.37612.78Total (7):87.23 lbs0.0396 tonne8. BB work in CSM (1:6)18 " thick wallNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Long wall212.250.51.518.375Short wall23.250.51.54.875S.Total:23.25 cft13.5 " thick wallNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Long wall211.8750.51.12513.359Short wall23.6250.51.1254.078S.Total:17.44 cft9 " thick wallNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Long wall211.550.7586.25Short wall2450.7530.00S.Total:116.25 cft4.5" thickNoLength (ft)Depth (ft)Width (ft)Quantity (cft)Internal baffel walls2450.37515.00S.Total:15.00 cftTotal (8):171.94 cft4.87 m39. 2" Coping (1:2:4)NoLength (ft)Depth (ft)Width (Ft)Quantity (sft)Long wall211.50.7517.25Short wall240.756Baffle wall240.3753Total (9):26.3 sft2.44 m210. Plaster in CS mortar (1:4) 1/2 " thickSidesNoLength(ft)Height(ft)Quantity (sft)Long wall2810.755860.00Short wall224.75595.00Baffle walls224580.00Total (10):1035.0 sft96.19 m211. Providing and laying CI soil Pipe 2 " dia with cement caulked jointTotal (11):3.3 ft1.00 m12. Providing and laying RCC 4" dia in septic tankTotal (12):30.0 ft9.14 m

&R&12&PProviding pillar at 10 ft center to centerAverage of outer and innerAverage of outer and inner

Cost of Soakage PitS. No.CSR Item No.DescriptionUnitQtyRate (Rs.)Amount (Rs.)Soakage Pit (5 ft internal dia)121-01-c-01Excavate well in dry & dispose of soil within 50m In hard strata like shingle : Upto 1.5 m depthm34.622411.521,902.26221-01-c-02Excavate well in dry & dispose of soil within 50m In hard strata like shingle :1.5 to 3 m depthm32.735426.281,165.95321-01-c-03Excavate well in dry & dispose of soil within 50m In hard strata like shingle : 3 to 4.5 m depthm36.577444.412,922.99406-05-iPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8)m30.0965,385.03516.28506-05-hPlain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:3:6)m30.0966,018.51577.02606-06-a-02RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)m30.31311,187.123,502.64706-07-bSupply & fabricate M.S. reinforcement for cement concrete (Deformed bars)tonne0.016120,459.131,927.35807-04-a-05Pacca brick work in foundation and plinth in Cement, sand mortar 1:6m32.1737,352.8915,979.84923-01-cP&L RCC pipe, moulded with cement concrete 1:1.5:3, incl. cost of reinfcnt, testing etc : 6"m4.572787.523,600.3710NSIP/L of bricks bats in Soakage pitm311.116510.745,677.34Total:37,772

&R&12&P

Estimate of Soakage PitEstimate for Soakage pit (5 ft internal dia, 22 ft deep)1. Excavation (Sinking) for Soakage pitDry Sinking ( up to 1.5 m)NoArea (sft)Depth (ft)Quantity (cft)6.5' dia33.1664.921163.22Total:163.22 cft4.62 m3Dry Sinking (1.5 m - 3 m)NoArea (sft)Depth (ft)Quantity (cft)5' dia19.6254.92196.58Total:96.58 cft2.74 m3Dry Sinking (3 m - 6.607 m)NoArea (sft)Depth (ft)Quantity (cft)5' dia19.62511.834232.24Total:232.24 cft6.58 m32. PCC (1:4:8)NoLength (ft)Depth (ft)Width (ft)Quantity (cft)13.5410.25003.385Total (2):3.39 cft0.10 m33. RCC (1:2:4)NoLength (ft)Depth (ft)Width (ft)Quantity (cft)Top slab33.170.33311.055Total (3):11.06 cft0.31 m34. Steel in cover slabSpacingNo.LengthWt lb/ftSteel#3@8"c/c B/W0.376Total (4):35.26 lbs0.016 tonne5. BB work in CSM (1:6)Height (ft)Area (sft)Quantity (cft)Walls5.66713.54176.738Total (5):76.74 cft2.17 m36. Coping 3" thick (1:3:6) over brickworkHeight (ft)Area (sft)Quantity (cft)0.2513.5413.385Total (6):3.39 cft0.10 m37. P/L Brick bats filling in soakage pit (5 ft dia)Height (ft)Area (sft)Quantity (cft)Walls2019.625392.500Total (7):392.50 cft11.12 m38. Providing and laying RCC 4" dia in Soakage pitTotal (8):15.0 ft4.57 m

&R&12&P


Top Related