Download - Ernessa François Architecture Portfolio
ErnessaFrançoisContact Info:(732)-328-0491New Jersey Institute of [email protected]
Architecture Portfolio
First Year
Academic Work 2014-2015
TABLE OF CONTENTS
Triptyches
Prototype
Deploy!
Household Object
Annotations of Everyday
Uncanny Cities
2D, 3D, Digtial Triptych
TrashTastic Park: Indoor Play Area Prototype
DeploymentSort It Out!: Children Indoor Play Area
Orthographic Projection
A House for 203X
Bathhouse
Pizza Cutter
Biome Home
City of Baucis Architectural Collage
Modes of Design Communication I
Arch 164 Collective
Arch 164 Collective
Modes of Design Communication I
Arch 163 Collective
Modes of Design Communication II
First Year: 1st Semester Fall 2014
First Year: 2nd Semester Spring 2015
First Year: 2nd Semester Spring 2015
First Year: 1st Semester Fall 2014
First Year: 1st Semester Fall 2014
First Year: 2nd Semester Spring 2015
BIOME HOMEA House for 203XIt’s great having grandparents living with grandchildren when there is a proper house to do that in, so that everybody has their own space and can be seperate when they want to be. The biome home is a 3 level house connected via elevator creating a different enviroment in commu-nal, private, and working space through atomospheric qualities of light.
SLEEPINGSLEEPING
DINING
BATHING
LIVING
WORKINGWORKING
TRANSPARENT
TEXTURED
-
OPAQUE
GROUND
2
1
1
FRONT ELEVATIONSCALE: 1/16” = 1’-0”
SIDE ELEVATIONSCALE: 1/16” = 1’-0”
2ND FLOOR PLANSCALE: 1/16” = 1’-0”
3RD FLOOR PLANSCALE: 1/16” = 1’-0”
1ST FLOOR PLANSCALE: 1/16” = 1’-0”
ROOF PLANSCALE: 1/16” = 1’-0”
FILTERED LIGHTING
TEXTURED/DOME SPACE
TRANSPARENT/MOUNTAIN VIEW
OPAQUE/OPEN OFFICE
DINING
COOKING
LIVING
WORKING
SLEEPING SLEEPING
BATHINGBATHING
SLEEPINGSLEEPING
THE CITY OF BAUCIS
“After a seven days’ march through woodland, the traveler directed towards Baucis cannot see the citY and yet he has arrived. The slender stilts that rise from the ground at a great distance from one another are lost above the clouds support the city. You climb them with ladders. On the ground the inhabitants rarely show themselves: having already everything they need up there, they prefer not to come down.
There are three hypothesis about the inhabitants of Baucis: that they hate the earth; that they respect it so much they avoid all contact; that they love it as it was before they existed and with spyglasses and telescopes aimed downward they nev-er tire of exaiming it, leaf by leaf, stone by stone, ant by ant, contemplateing with fascination their own absence.”
The city of Baucis also known as “the city above the clouds” is depicted at night collaged below. The two perspectives show both an outsid-ers view of the city with workers climbing their way up to the city and the other a view from someone at the top of the ladder just about to enter the mist of clouds.
TRIPTYCHS2D
Trip
tych
Hand D
rawn
ShadedBathouse
Dig
ital T
ripty
ch3D
Trip
tych
ORTHOGRAPHICPROJECTIONIn this exercise we examined a household object through the lens of orthography. Finding new properties, qualiaties, structures, and relationships. We created a set of measured orthographic drawings of a household object at a 1:1 scale. Including 2 Elevation, 2 Sections, and a plan.In the drawing to the right, the Household Ritual exercise, had us represent our object as it takes part in a household ritual.
1
2
3 4
5
6
= 1 second
Axonometric 1/32”= 1’0”
EXTERIOR NETTING
LANDFILL
STRUCTURE
INTERIOR
UNDERGROUND WASTE COLLECTION
TRASHTASTIC PARKAn Indoor Play AreaLandfills don’t have to remain steaming piles of foul smelling garbage. TrashAstic Park is a sad reminder of how our society is drowning in its own refuse. The park is both a waste facility and a play area for kids. The children can then sort the trash accordingly in bins, take them to their designated slides and have a race against trash. This creates an interacting experi-ence for the children as they learn how to sort and dispose trash.
SLIDES & CHUTES
EXPLODED AXON
DIAGRAMS
SORTING VIA RIDES EMBEDDING
PLANS
SECTION
SORT IT OUT!For the deployment phase, I decided to place my building on top of an existing warehouse that I imagined as a later waste facility. So my building sits in the future zoned residential area. Therefore the residents of Secaucus’ Harmon Cove could bring their trash over to the drive thru waste disposal chute which takes the trash and shoots it to the top of the building.
This is created by the process of having the landfill enter the space through a combination of funnels feeding from the roof of the building into “mini landfills”. So that each activity would have there own to sort from. In which the chil-dren can then sort the trash accordingly in their designated chutes.
Rides: -Dumpster Cart Train Ride -Rowdy Raccoon: Life Size Hungry Hippo Game-Kiddie Excavators -Slide vs Chute
2nd Floor Plan 1:375
Roof Plan 1:500
Ground Plan 1:500
MINI LANDFILLS
EMBEDDING
DRIVE-THRU WASTE DISPOSAL
DIAGRAMSPLANS
SITE PLAN
EXPLODED AXON
ROOF PLAN
2ND FLOOR PLAN
GROUND PLAN