LB
LB
LB
LB
LB
Totem 1
River Slate
Totem 2
Tannery Park
Totem 3
Grand Canal
CS
CS
+69.21
+(69.18)
+69.10
+(69.10)
+69.96
+(69.86)
+69.62
+(69.59)
FFL 69.55
FFL 69.52
FFL 69.70
FFL 69.64(69.66)+
+(70.02)
+74.44
+(74.44)
+74.41
+(74.41)
STOP
RUS027
WORDED 'STOP' MARKING (TSM M114)
STOP LINE TO TSM RRM017 (200mm WIDE)
CENTRE LINE MARKING (RRM001)
DOUBLE YELLOW LINES (RRM008)
ROAD CENTRE LINE (RRM002B)
ROAD MARKINGS.
STOPSTOP
STOP
ZIGZAG AND TERMINAL LINE (RPC002)
TACTILE PAVING.
NOTE:REFER TO TSM-2010 FOR DETAILS & POSITIONING.
RED COLOURED TACTILE PAVING TO
CONTROLLED PEDESTRIAN CROSSING.
BUFF COLOURED TACTILE PAVING TO
UNCONTROLLED PEDESTRIAN CROSSING.
70 m.
11 No.
220 m.
600 m.
290 m.
2 No.
20 m².
110 m².
Head Office,9 Prussia Street,Dublin 7.D07 KT57
TEL +353 (0)1 8682000
e: [email protected]: www.ocsc.ie
Drn by: Aprvd by:Chkd by:
Code Status Revision
Date: Scale: @ A1
Project:
Title:
Originator Zone Type Role NumberLevel
Rev No. Date Revision Note Drn by Chkd by· FOR SETTING OUT REFER TO ARCHITECT'S DRAWINGS.· THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER
ARCHITECTURAL AND ENGINEERING DRAWINGS AND ALL OTHERRELEVANT DRAWINGS AND SPECIFICATIONS.
· DO NOT SCALE THIS DRAWING. USE FIGURED DIMENSIONS ONLY.· NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED
IN ANY FORM OR STORED IN ANY RETRIEVAL SYSTEM OF ANY NATUREWITHOUT THE WRITTEN PERMISSION OF O'CONNOR SUTTON CRONINAS COPYRIGHT HOLDER EXCEPT AS AGREED FOR USE ON THE PROJECTFOR WHICH THE DOCUMENT WAS ORIGINALLY ISSUED. - - -
Client:Drn by Chkd by
- - - Dublin London Belfast Galway Cork Birmingham
Rev No. Date Revision Note
ENVIRONMENT QUALITY HEALTH & SAFETY
ISO 14001:2015 ISO 9001:2015 OHSAS 18001:2007
NSAI Certified NSAI Certified NSAI Certified
BIM Verified
Design & Construction
Capital/Delivery
PAS 1192-2
bsi.
O'CONNOR SUTTON CRONIN
MultidisciplinaryConsulting Engineers
THE PAUL HOGARTH COMPANY RATHANGAN PUBLIC RELAM
PROPOSED ROAD MARKINGS & TRAFFIC SIGNS
P293 OCSC XX XX DR C 1200 A1 C0122.07.19 1:500 SR SD AH
P01 22.07.19 SUITABLE FOR INFORMATION SR SDC01 21.10.20 STAGE COMPLETED - ISSUED FOR PLANNING SMG AH
PLANNING DRAWING.
NOT FOR CONSTRUCTION.
ALL LEVELS GIVEN ARE
RELATIVE TO ORDNANCE DATUM.
THIS DRAWING HAS BEEN ISSUED FOR INFORMATION
PURPOSES ONLY AND MUST NOT BE USED
FOR CONSTRUCTION UNDER ANY CIRCUMSTANCES