Overview of Facilities Lack of space
• Each building has modular classrooms to accommodate needed space.
• Not enough bulk and classroom storage spaces
2
Overview of Facilities Building envelope – roofs, brick work, exterior doors
and windows: • Last major roof update across the district occurred
in 1996 with replacement to Holly Lane, Hilliard, and Parkside.
• All buildings need exterior door and window upgrades throughout most of the facilities.
• Exterior brick work needs tuck pointing and waterproofing
3
Overview of FacilitiesMechanical Systems & Equipment
• All elementary buildings have boilers over 25 years old that require constant repairs.
• Building temperature control systems are all over 18 years with replacement parts no longer available.
• Only Bassett has air conditioning throughout most of the facility. The vast majority of the AC equipment is over 25 years old.
*Parkside building has AC that is 25 years old.
4
Overview of Facilities 21st Century Learning Environment
• Data infrastructure is lacking in all the elementary buildings.
• Electrical service is just adequate to provide the service currently requested in the facilities.
• Any additions to classroom load (computers, air conditioning, smart boards, etc.) will require an increase to the main electrical service and added wiring/cabling throughout the facilities.
5
Holly Lane Elementary
Features• Roofing: Built up asphalt w/ ballasted gravel top. Replaced in
1996• HVAC: 25+ yr. old gas fired hot water boilers with classroom
unit ventilators & fin tube heating. No AC. Antiquated temp control.
• Electrical: One 600 amp, 120/240 volt, 3-phase four wire system. Inadequate for required loads.
• Traffic: Sufficient parking in main lot. Bus loop co-mingled with car traffic.
• Site: Playground, ball field, 2 soccer/football fields
Building Size: 35,488 SFMax. Student Capacity: 368Current Enrollment: 251Year Built: 1961Additions: 1998
No. of full classrooms: 16Avg. Classroom size: 755 SFModular: 1Lot size: 12.12 acres
6
Classroom Heating Ventilator
7
Steel doors lack weather strippingand have shifted out of alignment over time.
Exterior Door Inefficiencies
8
Waste pipes in poor condition
Restroom Wall-Floor Disrepair
9
Holly Lane Elementary Heating
• No energy recovery
Safety & Security• Unsecured Entrance - Office Located away from main entrance
Plumbing/Fixtures• Waste pipes in poor condition
Electrical• Distribution system/wiring in poor condition
Walls/Chimney• Curtain wall separated from masonry in library
Life Safety• No fire suppression system
General Finishes• Some floor tiles with asbestos
10
Hilliard Elementary
Features• Roofing: Built up asphalt w/ ballasted gravel top. Reinstalled
in 1996.• HVAC: 25+ yr. old gas fired hot water boilers with classroom
unit ventilators & fin tube heating. No AC. antiquated temp control.
• Electrical: Main panels upgraded in 1990’s• Traffic: Insufficient parking. Bus loop comingled with car
traffic.• Site: Playground and ball field
Building Size: 40,937 SFMax. Student Capacity: 437Current Enrollment: 330Year Built: 1954Additions: 1998
No. of full classrooms: 19Avg. Classroom size: 750 SFModular: 1Lot size: 11.48 acres
11
Water Infiltrated Library
Serious erosion of joints in sills and lower courses of brickwork, allowing moisture intrusion 12
Water Infiltration
13
Hilliard Elementary
Heating• Temp. controls in poor condition
Safety & Security• Unsecured Entrance - Office Located away from main entrance
Walls/Chimney• Serious erosion of joints in sills and lower courses of
brickwork, allowing moisture intrusion
Interior/Lighting• Well below code
Life Safety• No fire suppression system
General Finishes• Some floor tiles with asbestos
14
Dover Elementary
Features• Roofing: Combo built up asphalt w/ ballasted gravel
and aluminized coating. All out of warranty.• HVAC: 25+ yr. old gas fired hot water boilers with
classroom unit ventilators & fin tube heating. Partial AC. Antiquated temp control.
• Electrical: three, -1200 amp, 208Y/120v, and 3 phase 4 wire system. One -1000 amp 208Y/120v, 3 phase 4 wire system
• Traffic: Ample parking in main lot. Bus drop separated from car traffic.
• Site: PlaygroundBuilding Size: 43,671 SFMax. Student Capacity: 437Current Enrollment: 339Year Built: 1949Additions: 1970
No. of full classrooms: 19Avg. Classroom size: 650 SFModular: 1Lot size: 14.18 acres
15
Storage Issues
16
Exterior Disrepairs
17
Dover Elementary Heating
• Temp. controls in poor condition• No energy recovery
Safety & Security• Unsecured Entrance - Office Located away from main entrance
Electrical• Main switch in poor condition
Walls/Chimney• Masonry joints poor
Interior Lighting• Well below code
Life Safety• No fire suppression system• Stairs/guardrails/walls not code compliant
18
Bassett Elementary
Features• Roofing: Combination build-up and shingled. Library
roof applied in 2015, all others out of warranty.• HVAC: 25+ yr. old gas fired hot water boilers with
rooftop units and AC. Antiquated temp. control.• Electrical: One 800 amp, 120/208 volt, 3 phase four
wire system. Incoming service is undersized with little spare capacity.
• Traffic: Sufficient parking in main lot, 2nd exit through neighborhood is problematic
• Site: Playground, ball field, soccer/football field
Building Size: 41,880 SFMax. Student Capacity: 460Current Enrollment: 414Year Built: 1967Additions: 1987, 1998
No. of full classrooms: 20Avg. Classroom size: 755 SFModular: 2Lot size: 15.82 acres
19
Asbestos
Asbestos Floor TileAsbestos Pipe insulation
20
Roof Leaks
Roof in poor condition.
21
Bassett Elementary Heating
• Temp. controls in poor condition• No energy recover
Safety & Security• Unsecured Entrance - Office Located away from main entrance
Ventilation/Exhaust• Below code
Electrical• Wiring in poor condition
Floors/Roof• 1987 slab floors rising and in poor condition
Interior Lighting• Well below code
Life Safety• No fire suppression system
22
Parkside Building
Features:• Roofing: Built up asphalt w/ballasted gravel top. All areas
out of warranty. • HVAC: 25 + yr. old gas fired hot water boilers with rooftop
HVAC units. Antiquated temperature control system. • Electrical: One -1600 amp, 120/240 volt, and 3-phase four
wire system and one - 1200 amp, 120/240 volt, and 3-phase four wire system. The 1600 amp system is inadequate for required loads.
• Traffic: Sufficient parking in main lot. Bus loop is co-mingled with car traffic.
• Site: Playground, Ball Field, and 1 Soccer/football Fields
Building Size: 72,521 SFMax. Student Capacity: 552Year Built: 1966Additions: 1966, 1998No. of full classrooms: 24
Avg. Classroom size: Old – 750 SF, New – 900 SFModular: 1Lot size: 13.79 acres
23
Wall Cracks & FoundationMasonry cracks in gym and classrooms.
Foundation movement in s. wall of gym.
24
Poor Security Wiring
Poor communication and security wiring.
25
Parkside Building Heating
• Temp. controls in poor condition
Safety & Security• Unsecured Entrance - Office Located away from main entrance
Life Safety• No fire suppression system
Exterior Doors• 1966 steel doors/aluminum doors in poor condition
Interior Lighting• Lighting/controls well below code
Windows• Curtain wall in poor condition
Plumbing/Fixtures • Waste pipes in poor condition
26
Overall Facility Assessments Similar issues for all older buildings
• Condition of structures• Age infrastructure• Educational space issues• Health, safety and security considerations
New Construction vs Renovation/Addition• 2/3 Guideline – sets the replacement vs renovate standard for
school facilities in Ohio at two thirds the cost of a new building.• Bassett Elementary – 79% • Dover Elementary – 83%• Hilliard Elementary – 81%• Holly Lane Elementary – 84%• Parkside – 70%