![Page 1: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/1.jpg)
ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR
Speaker: Scott M. Gerbick Physics Division, Argonne National Laboratory Status and Production Readiness of the 162.5 MHz HWR Cryomodule for Project X October 15, 2013
![Page 2: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/2.jpg)
2
Outline
1. Proposed EP and HPR Procedures 2. EP/HPR Fixturing Design and Fabrication Status 3. Cavity Handling Procedures 4. Summary
![Page 3: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/3.jpg)
3
Low-β SC Cavity EP Tool
![Page 4: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/4.jpg)
4
Design Specifications
Ability to EP a complete, fully jacketed cavity Direct water cooling through cavity LHe jacket during EP Two electrical slip ring assemblies to allow rotation of both
anode and cathodes during EP Integrated cathode loading/alignment system for quick
cathode insertion/extraction Ability to continuously circulate acid during EP Nitrogen purge to evacuate hydrogen Quick load/unload time at ~1 hour
![Page 5: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/5.jpg)
5
Four cathodes which are used to flow both acid and N2 to evacuate H2 Cathode loading done via plastic port flanges Nearly identical to the ANL 72 MHz QWR EP setup
Low-β SC Cavity EP Tool
![Page 6: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/6.jpg)
6
Acid/N2 Flow
ACID IN ACID OUT
N2 + H2 OUT N2 IN
Low acid flow rate (~1 LPM) Acid flow only needed to refresh acid, not to maintain temperature Rotates at ~0.5 RPM
![Page 7: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/7.jpg)
7
H2O Flow
Chilled water is circulated through the LHe space to control cavity temperature
Offers an improvement over our ILC elliptical cell EP setup which chills the acid in order to control temperature
![Page 8: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/8.jpg)
8
PXIE 162.5 MHz HWR EP
VERTICAL SECTION VIEW
HORIZONTAL SECTION VIEW
![Page 9: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/9.jpg)
9
PXIE 162.5 MHz HWR EP All acid wetted parts are made from HDPE, UHMWPE, Teflon, Viton, and 3003
series aluminum Minimal new hardware required to adapt to existing setup
![Page 10: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/10.jpg)
10
Cathodes/Cathode Loading Precision HDPE port flanges allow cathode loading and set cathode
location inside cavity during EP 4 cathodes made from 3003 series aluminum tubing Surface area ratio of Anode:Cathode is ~6.5:1
![Page 11: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/11.jpg)
11
Operation Data for 72 MHz QWR EP
CAVITY TEMPS (C)
CURRENT (A)
OPERATING VOLTAGE (V)
ACID DUMP TANK TEMP (C)
ACID RETURN LINE TEMP (C)
WATER RETURN TEMP (C)
![Page 12: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/12.jpg)
12
Operating Parameters for 72 MHz QWR EP
Parameter Unit Value Voltage V 18
Current density mA/cm^2 30 Average temps. C 27 Average temps.
stability C +/- 1
Amplitude of temps. oscillations
(due to cavity rotation)
C 3
Acid flow l/min 1 Cavity rotation rpm 0.5 Nitrogen flow scfm 1.5
![Page 13: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/13.jpg)
13
ANL 72 MHz QWR Before and After EP
AFTER 12HRS OF EP 150µm Nb REMOVED
BEFORE EP
![Page 14: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/14.jpg)
14
HPR
![Page 15: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/15.jpg)
HPR
Cavity and all required components and hardware will be ultrasonic cleaned prior to HPR
Couplers, pickups, hardware, etc, will be HPR’d with handheld tool Cavity will be HPR’d using ANL cavity HPR tool Multiple passes per port are performed during cavity HPR
15
![Page 16: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/16.jpg)
Fixturing/Fabrication Status
EP: Modeling is complete PO is being processed for machining of required new parts Plan to have parts in-hand by late November
HPR: Modeling is complete Modify existing 72 MHz QWR fixturing (drill some holes) for use with PXIE HWR HPR wand to get PFA coated PLC control in the works
16
![Page 17: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/17.jpg)
Cavity Handling Procedures
EP: A checklist for the entire process Practically identical to that of the ANL 72 MHz QWR using proven tooling
Ultrasonic Cleaning: More checklists… Same recipe/procedure developed for the ILC and used on recent ANL cavities
HPR: Even more checklists… Follow the same techniques successfully used on cavities processed by ANL using
the ANL HPR tool
Clean Assembly: Yes, more checklists Clean assembly will follow all procedures developed for the ANL 72 MHz QWR
17
![Page 18: ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 …€¦ · ELECTROPOLISHING & HPR PLAN FOR THE PROJECT X 162.5 MHz HWR Speaker: Scott M. Gerbick Physics Division, Argonne National](https://reader036.vdocuments.us/reader036/viewer/2022081408/605f8c16d3fd1d2ff676ea15/html5/thumbnails/18.jpg)
18
EP and HPR of FNAL 162.5 MHz HWR will be nearly identical to the ANL 72 MHz QWR in layout, operating parameters, and procedures
Minimal new hardware required in order to EP HWR’s in the ANL EP tool
HPR of HWR’s will use existing ANL tool, requiring only modification of existing mounting fixture
All cavity handling procedures, from pre-EP to post-clean assembly will be nearly identical to those developed by ANL for the ILC cavity and ANL 72 MHz QWR cavity processing
Summary