ECE 477 Design ReviewECE 477 Design Review Group 9 Group 9 Spring 2005 Spring 2005
Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors
![Page 2: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/2.jpg)
Presentation OutlinePresentation OutlineG.I.M.P. overview G.I.M.P. overview Project-specific success criteriaProject-specific success criteriaSystem block diagramSystem block diagramComponent selection rationaleComponent selection rationalePackaging designPackaging designSchematic and theory of operationSchematic and theory of operationPreliminary PCB layoutPreliminary PCB layoutSoftware design/development statusSoftware design/development statusProject completion timelineProject completion timelineQuestions / discussionQuestions / discussion
![Page 3: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/3.jpg)
Project OverviewProject Overview
General Informative Medical ProstheticGeneral Informative Medical Prosthetic
Integrable gait feedback system Integrable gait feedback system for existing lower limb prosthetic for existing lower limb prosthetic devices.devices.
![Page 4: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/4.jpg)
Project-Specific Success CriteriaProject-Specific Success Criteria
1.1. … …detect pressure changesdetect pressure changes in the shoe via an ATD port in the shoe via an ATD port on a microcontroller and to on a microcontroller and to map those pressure map those pressure differentialsdifferentials to distinct to distinct vibrating patterns in a vibrating patterns in a vibrating motor strap. vibrating motor strap.
The ability to…
i
![Page 5: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/5.jpg)
Success Criteria continued…Success Criteria continued…
2. …2. …execute sequential vibrating execute sequential vibrating patternspatterns, thus providing “how-to-walk” , thus providing “how-to-walk” training capabilities training capabilities
The ability to…
Human leg of cross-section
![Page 6: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/6.jpg)
Success Criteria continued…Success Criteria continued…
3. …3. …record sensor data and upload to a record sensor data and upload to a computer via Ethernet connectivity computer via Ethernet connectivity
The ability to…
Data
uploading
![Page 7: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/7.jpg)
Success Criteria continued…Success Criteria continued…
4. 4. display system status (mode, battery display system status (mode, battery level) on an LCD level) on an LCD
The ability to…
MODE:
Warning: Low Battery
LEARNING: Walking
Calibration
![Page 8: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/8.jpg)
Success Criteria continued…Success Criteria continued…
5. …5. …automatically determine when the automatically determine when the prosthetic is idle and enter into a prosthetic is idle and enter into a power-conservation mode in which power-conservation mode in which certain functions/ports will be turned certain functions/ports will be turned off (some ATD, LCD, etc). off (some ATD, LCD, etc).
The ability to…
Note:
Does not reflect actual battery life
![Page 9: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/9.jpg)
Block Diagram
Microcontroller
Amplifier Circuit
Shielded
cable
LCD
ATD
PORT
RESET
Reset Button
PORT
RPG
Ethernetdevice
NetworkApplications
(calib. and data upload)
Power Supply:
7.2Vdc RCcar battery
DC SwitchingRegulator
Power supply
+/- 5Vdc reg. 3.3 Vdc reg.
BJTamps.
Vibratingmotors
LEDs
Pressure Sensors
= on PCB
= off PCB
= plug connection required
KEY
Clinometer Fused 7.2 supply
![Page 10: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/10.jpg)
Component Selection RationaleComponent Selection Rationale
FLEXIFORCE SENSORS:
Clinometer:
RationaleMain Components:
•Relatively inexpensive
•Flat and flexible
•Tried and true in previous senior design projects
•Easily-readable, non-discrete output
•Met durability requirements
![Page 11: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/11.jpg)
Component Selection Continued…Component Selection Continued…
Vibrating motors:
HC12 NE64 Variant Microcontroller:
RationaleMain Components:
•Low current requirements
•Very inexpensive ($1.25 each)
•Flat shape for implementation
•Met I/O requirements (80)
•Integrated TCP/IP functionality
•64K Flash memory
![Page 12: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/12.jpg)
Component Selection Continued…Component Selection Continued…
Description Vendor Part Number Unit Cost Quantity Total Cost
FLEXIFORCE SENSORS Tekscan A201-100 $13.75 4 $55.00
SENSOR CLINOMETER HORIZONTL FLNG AccuStar 02110102-000 $139.00 1 $139.00
VIBRATING MOTORS Sanko Electric 1E120 $1.25 10 $12.50
MC9S12NE64V1freescale semiconductor MC9S12NE64CPV $0.00 1 $0.00
Total (approximate): $600
![Page 13: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/13.jpg)
Packaging DesignPackaging Design
Batte
ry
PCB
RPG
LCD
Peripheral Connections
4 in.
7 in.1.5 in.
![Page 14: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/14.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationPower Supply and Distribution:
Regulator circuits from regulator manufacturer website
5V
-5V
3.3V
7.2 V unregulated
![Page 15: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/15.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationMicrocontroller:
![Page 16: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/16.jpg)
CRG module handles power regulation on reset
ATD pinsMotor PWMs
LCD pins
BDM header
Run/boot switch
![Page 17: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/17.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationMicrocontroller Headers:
![Page 18: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/18.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationPressure Sensor Circuits:
4 inverting integrator Amps with noise suppression caps on output
-5 V
100 K pots (R12,12,13,14)
![Page 19: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/19.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationPressure Sensor Circuits:
10 Class D amplifiers, all R values chosen so “ON” is always in saturation
![Page 20: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/20.jpg)
Schematic/Theory of OperationSchematic/Theory of OperationConnectors, etc.:
![Page 21: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/21.jpg)
Preliminary PCB LayoutPreliminary PCB Layout
Trial 1: Trial 1: Size: 5” X 3”Size: 5” X 3”COMPLETE FAILURE
![Page 22: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/22.jpg)
Preliminary PCB LayoutPreliminary PCB LayoutTrial 2: Trial 2: Size: 7” X 4” (100% routed, 0 DRC errors)Size: 7” X 4” (100% routed, 0 DRC errors)
Only common GND between
A&D
Analog Amp. Circuits
Digital Circuits
Power SupplyATD Amp. Circuits
![Page 23: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/23.jpg)
Software Design/Development StatusSoftware Design/Development StatusPre-Module Development StatusPre-Module Development Status
Pulse Width Modulator (PWM)Pulse Width Modulator (PWM) Analog-To-Digital (ATD)Analog-To-Digital (ATD) Hardware InterruptsHardware Interrupts Memory ManagementMemory Management Ethernet ConnectivityEthernet Connectivity
Module Development StatusModule Development Status Liquid Crystal Display (LCD)Liquid Crystal Display (LCD) Sensor Data Management (SDM)Sensor Data Management (SDM) Pressure and Clinometer Sensor InputsPressure and Clinometer Sensor Inputs Motor OutputsMotor Outputs Power Down Mode – Battery MonitorPower Down Mode – Battery Monitor Startup Mode – WatchdogStartup Mode – Watchdog
![Page 24: ECE 477 Design Review Group 9 Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors](https://reader035.vdocuments.us/reader035/viewer/2022062518/56649dce5503460f94ac2375/html5/thumbnails/24.jpg)
Project Completion TimelineProject Completion Timeline
•Schedule through user manual composition. (April 13)