4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
E1.63/32" = 1'0"
BASEMENT POWER PLAN1
44"/GFI
44"/GFI
J
J
1. PROVIDE 20A/1P SNAP SWITCH AND 120V POWER FOR OVERHEAD DOOR OPERATOR.
PROVIDE ADDITIONAL CONDUIT(S) FOR CLOSE LOOP CONTROL WIRING, PROXIMITY
READERS, ETC. COORDINATE ALL REQUIREMENTS WITH GC AND EQUIPMENT
INSTALLER.
2. 30A FUSED DISCONNECT SWITCH WITH SOLID NEUTRAL AND (1) 20A DUALELEMENT,
TIME DELAY FUSE IN NEMA 1 ENCLOSURE FOR ELEVATOR CAB LIGHTS & EXHAUST.
SWITCH SHALL BE CAPABLE OF BEING LOCKED "OFF". MOUNT AT 6'0" AFF TO TOP
AND LABEL WITH CORRESPONDING ELEVATOR CAR NUMBER AND CIRCUIT NUMBER.
COORDINATE EXACT MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR
EQUIPMENT INSTALLER. PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR
CONTROLLER.
3. ELEVATOR POWER MODULE SWITCH: 200A/480V/3P SWITCH COMPLETE WITH 125A
DUAL ELEMENT, TIME DELAY CLASS 'J' FUSES, 120V CONTROL TRANSFORMER, FIRE
ALARM SAFETY INTERFACE RELAY, KEY TEST SWITCH, GREEN PILOT LIGHT, AUXILIARY
CONTACTS FOR ELEVATOR RECALL, AND FIRE ALARM VOLTAGE MONITORING RELAY.
COOPER BUSSMAN #PS2T48R1KGN2BF1 OR EQUAL. COORDINATE EXACT
MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR EQUIPMENT INSTALLER.
PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR CONTROLLER.
4. INSTALL RECEPTACLE ON WALL OF ELEVATOR PIT. VERIFY EXACT LOCATION WITH
ELEVATOR EQUIPMENT INSTALLER.
5. PROVIDE CENTRAL LIGHTING INVERTER WITH 120V1 Ȉ INPUT 120V1Ȉ OUTPUT, 750
WATT CAPACITY, (1) INPUT AND (1) OUTPUT BREAKER, COMPACT SIZE CABINET, UL
924 AND UL 1778 LISTED, WITH FULL 120 MINUTE BATTERY BACKUP CAPACITY,
COMPATIBLE WITH LED LIGHTING, MULE #ES.75A0100N11 OR EQUAL. PROVIDE
31/2" CONCRETE HOUSEKEEPING PAD.
6. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT FROM
INVERTER.
7. DEDICATED RECEPTACLE FOR FIRE SPRINKLER SYSTEM COMPRESSOR. VERIFY EXACT
LOCATION WITH FIRE SPRINKLER CONTRACTOR.
8. PAD MOUNTED UTILITY TRANSFORMER, SEE SITE PLAN ON SHEET E1.0 AND CIVIL
DRAWINGS FOR EXACT LOCATION ON SITE.
9. UNDERGROUND ELECTRICAL PRIMARY. SEE SITE PLAN ON SHEET E1.0 FOR MORE
INFORMATION.
10. UNDERGROUND ELECTRICAL SERVICE LATERAL, SEE POWER RISER DIAGRAM ON SHEET
E6.2 AND ELECTRICAL SITE PLAN ON SHEET E1.0 FOR MORE INFORMATION. EXACT
ROUTING MAY BE ADJUSTED AS REQUIRED TO SUIT FIELD CONDITIONS.
11. PROVIDE 11/4" RMC CONDUIT WITH PULL STRING FOR POWER COMPANY PROVIDED
C:T METERING WIRING.
12. ELECTRICAL UTILITY METER. MOUNT CENTER OF METER SOCKET 42" TO 60" ABOVE
GRADE. VERIFY EXACT LOCATION WITH KCP&L.
13. COMBINATION STARTER FOR EXHAUST FAN AND MAKE FINAL CONNECTION TO
EQUIPMENT. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON SHEET E6.1 FOR MORE
INFORMATION.
14. MOUNT CONTROL TRANSFORMER AND RELAYS FOR EXHAUST FAN CONTROL
ADJACENT TO "TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL
DIAGRAM" ON SHEET E6.1 FOR MORE INFORMATION.
15. ROUTE CIRCUIT THROUGH RELAY FOR CONTROL OF MOTORIZED DAMPERS BY
"TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON
SHEET E6.1 FOR MORE INFORMATION.
16. FAN SHALL OPERATE CONTINUOUSLY. CIRCUIT TO UNSWITCHED HOT CONDUCTOR.
17. 30A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. PROVIDE FINAL
CONNECTION TO TRASH COMPACTOR. VERIFY REQUIREMENTS WITH GC AND
EQUIPMENT INSTALLER.
18. PROVIDE (5) #10, #10G, 3/4"C FROM THE WALKIN FREEZER CONDENSING UNIT TO
THE FREEZER EVAPORATOR, WIRED THROUGH THE UNIT TIME CLOCK. VERIFY EXACT
REQUIREMENTS WITH KEC AND MAKE ALL FINAL ELECTRICAL CONNECTIONS.
19. 480V/3P COMBINATION NEMA SIZE 0 MOTOR STARTER/NONFUSED DISCONNECT
SWITCH IN NEMA 1 ENCLOSURE. STARTER SHALL BE FULL VOLTAGE NONREVERSING
TYPE WITH 24V CONTROL TRANSFORMER, HOA SELECTOR SWITCH, AND MELTING
ALLOY THERMAL OVERLOADS. MAKE FINAL FLEXIBLE CONNECTION TO PUMP. ROUTE
24VAC CONTROL WIRING TO START CONTACTS IN BOILER FOR PUMP START SIGNAL.
20. 100A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO EQUIPMENT.
21. PROVIDE STARTERS FOR GEYSER PUMPS AND MAKE ALL FINAL ELECTRICAL
CONNECTIONS. COORDINATE LOCATION AND REQUIREMENTS WITH FOUNTAIN
EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE INFORMATION.
22. PROVIDE STARTERS FOR MAIN FOUNTAIN PUMP, POOL PUMP, AND SPA PUMP AND
MAKE ALL FINAL ELECTRICAL CONNECTIONS. COORDINATE LOCATION AND
REQUIREMENTS WITH FOUNTAIN EQUIPMENT INSTALLER. SEE SHEETS SP2.1, SP3.1,
SP3.2 AND SP3.3 FOR MORE INFORMATION.
23. PUSHBUTTON MOUNTED AT 72" AFF FOR EMERGENCY SHUTDOWN OF BOILER.
PROVIDE COMPLETE WITH MAINTAINED CONTACT, 40mm RED MUSHROOM
PUSHBUTTON, N.C. CONTACT BLOCK, NEMA 4X SURFACE MOUNT NONMETALLIC
BACKBOX (PILLA MODEL #BSD120 OR EQUAL). PROVIDE PLAQUE ON WALL WITH 3/8"
HIGH WHITE LETTERS ON RED BACKGROUND TO READ "EMERGENCY BOILER
SHUTDOWN".
24. VERIFY POWER REQUIREMENTS FOR FOUNTAIN FLOW, FLOAT SWITCH, AND WATER
LEVEL CONTROLLER WITH EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE
INFORMATION.
25. COORDINATE POWER CONNECTION TO LED LIGHTING TRANSFORMER AND
PROGRAMMER WITH FOUNTAIN EQUIPMENT INSTALLER.
26. COORDINATE ALL POOL, SPA AND FOUNTAIN ELECTRICAL REQUIREMENTS WITH
SHEETS SP2.1, SP3.1, SP3.2 AND SP3.3, AND WITH EQUIPMENT INSTALLER. PROVIDE
ADDITIONAL ELECTRICAL INSTALLATION AS REQUIRED FOR A COMPLETE SYSTEM.
27. ELECTRICAL INSTALLATION FOR SNOWMELT SYSTEM PUMP, BOILER AND GLYCOL
MAKEUP SYSTEM SHALL BE PRICED SEPARATELY AS PART OF A BID ALTERNATE. SEE
SPECIFICATIONS FOR INFORMATION ON PROJECT ALTERNATES.
28. 60A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO EQUIPMENT.
29. PROVIDE (3) #12, #12G, 1/2"C TO COMPANION INDOOR UNIT ABOVE CEILING IN
KITCHEN ABOVE. SEE SHEET E1.7 FOR INDOOR UNIT LOCATIONS.
30. ELEVATOR SUMP PUMP ALARM PANEL. PROVIDE POWER CONNECTION AND (2) 1"
CONDUITS FROM ALARM PANEL STUBBED INTO ELEVATOR PIT FOR POWER AND
CONTROL CABLING. COORDINATE ALL WORK WITH PLUMBING CONTRACTOR.
31. PUSHBUTTON MOUNTED AT 54" AFF FOR OVERRIDE OPERATION OF ELEVATOR RELIEF
HOOD MOTORIZED DAMPERS. SEE "ELEVATOR RELIEF HOOD DAMPER CONTROL" ON
SHEET E1.10. PROVIDE PLAQUE ON WALL WITH 3/8" HIGH WHITE LETTERS ON RED
BACKGROUND TO READ "ELEVATOR RELIEF HOOD MANUAL OVERRIDE".
32. CT CABINET ON EXTERIOR WALL. SEE RISER DIAGRAM ON SHEET E6.2.
33. COORDINATE WITH GC AND PLUMBING CONTRACTOR FOR INSTALLATION OF
ELECTRICAL TO AVOID GREASE INTERCEPTOR.
34. VIERIFY EXACT LOCATION OF WALKIN REFRIGERATOR AND FREEZER CONDENSING
UNITS WITH GC AND KITCHEN EQUIPMENT INSTALLER.
POWER PLAN NOTES BY SYMBOL#
1
1
GFI
GFI
L01
GFI
2
3
1/4" = 1'0"
ENLARGED EQUIPMENT ROOM POWER PLAN2
2
E1.6
L01
2
SES
5
SES
4
L01
4 L01
8
L01
6
H01
6
5
L01
3
L01
16
L02
4
L02
6
7
8
10
10
10
11
L02
9
L02
15
L02
21
131313R
R TR
L02
5
D
D
D
D
ON CCT
'L025'
15
ON CCT
'L025'
15
L02
8
L02
10
L02
12
L02
16
L02
18
L02
20
L02
2216
UH�1
UH�2
L02
24
L02
25
17
1/4" = 1'0"
ENLARGED POOL EQPM ROOM POWER PLAN3
D02
17
D02
16
3
E1.6
L01
7
L01
9
L01
11
L01
13
L01
12
L01
15
L01
18
L01
14
KITCHEN EQUIPMENT TAG. SEE 'KITCHEN
EQUIPMENT ELECTRICAL CONNECTION
SCHEDULE' ON SHEET E4.3 FOR
EQUIPMENT INFORMATION (TYP).
1/2
19
H01
10
L01
17
L01
19
L01
21
16
20
L03
L03
4
L01
22
L01
28
21
22
L03
3
L03
9
23
24L03
10
L03
8
L01
23
25
L03
15
L03
16
L03
19
L03
20
CHLORINE
GENERATORS
POOL HEATER
SPA HEATER
L03
24
UV CHAMBER
L03
23
L03
25L03
26
ACID PUMPS
FLOW CONTROL
L03
27
UV CHAMBER
FLOW CONTROL
SPA LED
PROGRAMMER /
TRANSFORMER
L03
30
SPA LED
PROGRAMMER /
TRANSFORMER
L03
29
26
L03
12
27
L02
36
L02
40
L02
4429
29
29
OUTDOOR
UNIT
28
20
28
28
OUTDOOR
UNIT
OUTDOOR
UNIT
L01
29
L01
31
30
30
4
4
31
12
32
33
14
1
1
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
E1.73/32" = 1'0"
FIRST FLOOR POWER PLAN1
3
E4.1
3
E4.1
3
E4.1
3
E4.1
1
E4.1
3
E4.1
1
E4.1
1
E4.1
3
E4.1
3
E4.1
3
E4.1 1
E4.1
1
E4.2
1
E4.2
1
E4.2
1
E4.2
1
E4.2
1
E4.2
1
E4.2
1
E4.2
CT
GFI
1
E4.3
L11
L12
BC�1
BC�2
EF�5
L02
33
L02
29
WP/GFI
J
J
L03
32
L03
31
GFI
1. PROVIDE EQUIPOTENTIAL BONDING FOR POOL AND SPA AREA PER NEC 680.26 AND
PER NOTES ON SHEET SP3.3.
2. PROVIDE 120V POWER TO POOL AND SPA CHEMICAL ANALYZERS. VERIFY
REQUIREMENTS WITH EQUIPMENT INSTALLER.
3. 30A/2P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL
LIQUIDTIGHT CONNECTION TO EQUIPMENT.
4. 60A/2P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL
LIQUIDTIGHT CONNECTION TO EQUIPMENT.
5. 100A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO EQUIPMENT.
6. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED 120V CIRCUIT.
7. 60A/3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO EQUIPMENT.
8. 30A/3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO EQUIPMENT.
9. 30A/3P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL
LIQUIDTIGHT FLEXIBLE CONNECTION TO EQUIPMENT.
10. REMOTE ALARM PANEL FOR "TOXALERT" VENTILATION CONTROL SYSTEM. VERIFY
EXACT LOCATION WITH OWNER. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON
SHEET E6.1 FOR WIRING REQUIREMENTS.
11. 30A/3P MANUAL MOTOR CONTROLLER SNAP SWITCH (WITHOUT OVERLOAD
PROTECTION) IN NEMA 1 ENCLOSURE. MOUNT ADJACENT TO UNIT ABOVE CEILING
AND MAKE FINAL FLEXIBLE CONNECTION TO EQUIPMENT.
12. PROVIDE (3) #12, #12G, 1/2"C FROM OUTDOOR UNIT LOCATED IN PARKING GARAGE
BELOW. SEE E1.1 FOR LOCATION AND MORE INFORMATION.
13. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT.
14. PROVIDE 120V POWER FOR POWER DOOR ASSIST OPERATOR AND WIRE TO PUSH
BUTTON OPERATORS. VERIFY EXACT PUSH BUTTON LOCATIONS WITH GC PRIOR TO
ROUGHIN.
15. PROVIDE 120V POWER TO MOTORIZED WINDOW SHADES. INSTALL AND WIRE
REMOTE CONTROL STATION FURNISHED WITH EQUIPMENT. COORDINATE WITH GC
AND EQUIPMENT INSTALLER.
16. ALL DUPLEX RECEPTACLES IN THIS APARTMENT BEDROOM SHALL BE GFCI TYPE.
17. ALL DUPLEX RECEPTACLES ON THIS WALL OF THIS APARTMENT BEDROOM SHALL BE
GFCI TYPE.
18. MOUNT OUTLET HORIZONTAL, CENTERED BETWEEN COUNTERTOP AND BOTTOM OF
WINDOW.
POWER PLAN NOTES BY SYMBOL#
1
2
GFI
GFI
WP/GFI
WP/GFI
L12
34
L12
38
L02
37
3 4
D02
18D02
18
5 5
6
L12
42L12
44
L12
46
WP/GFI
WP/GFI
L12
48
L12
50L12
52
L12
54
L12
56
L11
17
L11
26
L11
6
L11
2
L11
25
POOL HVAC UNIT
H01
16 H01
22
H01
26
7
8
3
4
3
L11
10
L11
14
L11
18
L11
23
L11
19
L11
21
9
L11
22
L11
24
L11
28
m
11
11
11
12
1212
INDOOR
UNIT
INDOOR
UNIT
INDOOR
UNIT
EF�4 13
J
J
J
J
J
J
L11
2714
14
J
J
J
J
14
J
J
J
L11
27
L11
27
J
J
J
14
L11
27
14
J
J
J
L11
27
14
J
J
J
15
15
RE: 1:E1.8
RE: 1:E1.8
RE: 1:E1.8
15
10
16
17
CT
CT
CT
1
18
18
1
1
1
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
E1.83/32" = 1'0"
SECOND FLOOR POWER PLAN1
3
E4.1
1
E4.2
1
E4.1
1
E4.2
3
E4.1
1
E4.2
3
E4.1
1
E4.2
1
E4.1
1
E4.1
1
E4.2
3
E4.1
3
E4.1
1
E4.1
1
E4.2
1
E4.2
1
E4.2
3
E4.1
3
E4.1
3
E4.1
60"
CT/GFI
CT/GFI
CT
60"
2
E4.3
CLG
L22
L21
CT/GFI
CT
J
1. COORDINATE POWER REQUIREMENT FOR FIRE PLACE WITH EQUIPMENT INSTALLER.
2. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT.
3. INTERLOCK MAKEUP AIR UNIT WITH KITCHEN EXHAUST HOOD CONTROL PANEL.
COORDINATE REQUIREMENTS WITH KITCHEN EQUIPMENT INSTALLER.
4. PROVIDE 60A/2P MANUAL MOTOR STARTER SNAP SWITCH W/O OVERLOAD
PROTECTION. COORDINATE SWITCH MOUNTING LOCATION WITH MECHANICAL
CONTRACTOR. MAKE FINAL FLEXIBLE CONNECTION TO HVAC UNIT.
5. HEAVY DUTY 7DAY DIGITAL WALL SWITCH TIMER FOR EXHAUST FAN CONTROL.
TIMER SHALL HAVE LCD DIGITAL CLOCK AND READOUT, MANUAL OVERRIDE, AND
SHALL BE RATED FOR 1HP AT 120V. INTERMATIC #ST01C OR EQUAL. INSTALL AT
46" AFF AND COORDINATE WITH OWNER FOR PROGRAMMING AND SCHEDULING.
6. PROVIDE 120V POWER TO MOTORIZED WINDOW SHADES. INSTALL AND WIRE
REMOTE CONTROL STATION FURNISHED WITH EQUIPMENT. COORDINATE WITH GC
AND EQUIPMENT INSTALLER.
7. PROVIDE 120V POWER TO FIELD INSTALLED MOTORIZED DAMPER. INTERLOCK
DAMPER WITH EXHAUST FAN DAMPER SHALL OPEN WHEN EXHAUST FAN IS
ENERGIZED. COORDINATE WITH MECHANICAL CONTRACTOR.
POWER PLAN NOTES BY SYMBOL#
MUA
UHP�1
UHP�1
UHP�1
EF�8
L21
2
L21
6
L21
8
1
1
L21
14
L21
18
L21
20
L21
22
L21
24
L21
17
L21
19
L21
21
L21
23
L21
25
L21
27
L21
29
2
L21
24
L22
11
L22
15
m
L22
19
L22
25
L22
23
L22
27
L22
33
L22
29
L22
31
3
L22
30
L22
32
L22
28
L22
34
4
T
5
L21
28
J
J
J
J
J
L21
30
RE: 1:E1.7
RE: 1:E1.7
RE: 1:E1.7
6
6
1
L21
31
1
1
L21
33
1
1
D
7
1
1
1
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
E1.133/32" = 1'0"
SECOND FLOOR SPECIAL SYSTEMS PLAN1
3
E4.1
1
E4.2
1
E4.1
1
E4.2
3
E4.1
1
E4.2
3
E4.1
1
E4.2
1
E4.1
1
E4.1
1
E4.2
3
E4.1
3
E4.1
1
E4.1
1
E4.2
1
E4.2
1
E4.2
3
E4.1
3
E4.1
3
E4.1
P
P
P
P
P
tv
tv
48"
CLG
1. PROVIDE ROUGHIN FOR CARD READER. COORDINATE EXACT QUANTITY, LOCATION
AND REQUIREMENTS WITH OWNER AND G.C.
2. ELEVATOR LOBBY SMOKE DETECTOR. SEE DETAIL 2:E6.1.
3. ADDRESSABLE FIRE ALARM RELAY FOR CONTROL OF ELECTROMAGNETIC DOOR
HOLDERS. UPON DETECTION OF SMOKE, FIRE ALARM CONTROL PANEL SHALL SEND
SIGNAL TO RELAY AND DOORS SHALL RELEASE.
SPECIAL SYSTEMS PLAN NOTES BY SYMBOL#
1
CR
CR
1
2
3
R
3
72"
1
60"
1
1
60" 1
3
1
1
94"
94" 1
1
1
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
1
2 B
KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE
Tag#
Item Description Voltage � Phase Load (VA) Type of ConnectionMounting
Height (AFF)Remarks
2A WALK�IN REFRIGERATOR LIGHTS 120V�1Ȉ 480 HARDWIRED 8'�6" .
2B WALK�IN REFRIGERATOR EVAPORATOR 208V�1Ȉ 188 HARDWIRED 9'�0" .
2C WALK�IN FREEZER LIGHTS/HEATER 120V�1Ȉ 720 HARDWIRED 8'�6" .
2D WALK�IN REFRIGERATOR CONDENSING UNIT 208V�1Ȉ 2642 HARDWIRED 36" (9)
2E WALK�IN FREEZER CONDENSING UNIT 208V�3Ȉ 5400 HARDWIRED 36" (1) (10)
7A MIXER 120V�1Ȉ 1200 NEMA 5�20R 24" .
9A PORTABLE WORK TABLE RECEPTACLE 120V�1Ȉ 1200NEMA 5�20R CORD
DROP6'�6" (2)
11A SLICER 120V�1Ȉ 360 NEMA 5�20R 24" .
12A FOOD PROCESSOR 120V�1Ȉ 1080 NEMA 5�20R 48" .
13A WORK TABLE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .
14A REFRIGERATOR 120V�1Ȉ 888 NEMA 5�20R 24" .
17A DISHWASHER 480V�3Ȉ 19695 HARDWIRED 18" .
22A HOOD LIGHTS AND CONTROL 120V�1Ȉ 800 HARDWIRED 63" .
23A STEAMER 120V�1Ȉ 120 NEMA 5�20R 24" .
24A FREEZER BASE 120V�1Ȉ 600 NEMA 5�20R 24" .
28A REFRIGERATED BASE 120V�1Ȉ 650 NEMA 5�20R 24" .
30A DOUBLE DECK OVEN FAN MOTORS 120V�1Ȉ 1440 NEMA 5�20R 24" .
32A CONVEYOR TOASTER 120V�1Ȉ 1500 NEMA 5�20R 48" .
34A HOT FOOD TABLE 208V�1Ȉ 3454 HARDWIRED STUB�UP (3)
35A REFRIGERATED PREP TABLE 120V�1Ȉ 936 NEMA 5�20RSTUB�UP
TO 4".
36A PASS�THROUGH REFRIGERATOR 120V�1Ȉ 1152 NEMA 5�20RFLUSH IN
CEILING.
37A PICK�UP COUNTER RECEPTACLE 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)
37B PICK�UP COUNTER P.O.S. PRINTER RECEPT 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)
37C PICK�UP COUNTER RECEPTACLES 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)
37D MICROWAVE OVEN 120V�1Ȉ 1608 HARDWIRED STUB�UP (4)
37E STRIP HEATER 120V�1Ȉ 1600 HARDWIRED STUB�UP (5)
37F HEATED PLATE DISPENSER 120V�1Ȉ 456 NEMA 5�20RSTUB�UP
TO 4".
37G CONVENIENCE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .
37H SOUP WELLS 120V�1Ȉ 828 EA HARDWIRED 18" (6)
38A COFFEE BREWER 208/120V�1Ȉ 3600 VERIFY 48" .
39A TEA BREWER 120V�1Ȉ 1200 NEMA 5�20R 48" .
41A JUICE DISPENSER 120V�1Ȉ 1200 NEMA 5�20R 48" .
42A SODA DISPENSER AND CARBONATOR 120V�1Ȉ 1200 NEMA 5�20R 18" .
43A CONVENIENCE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .
44A ICE MAKER 208V�1Ȉ 2310 HARDWIRED 80" (7)
46A P.O.S. MACHINE 120V�1Ȉ 1200 NEMA 5�20R 48" .
47A BEER AND WINE REFRIGERATOR 120V�1Ȉ 732 NEMA 5�20R 18" .
B1A UNDER BAR LIGHTS 120V�1Ȉ 1200 HARDWIRED 39" .
B3A BAR RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 39" .
B3B BLENDER 120V�1Ȉ 1800 HARDWIRED 12" (8)
B3C CARBONATOR & SODA GUN 120V�1Ȉ 1200 NEMA 5�20R 12" .
B6A GLASSWASHER 120V�1Ȉ 420 NEMA 5�20R 14" .
B7A BAR RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 39" .
B8A CONVENIENCE RECEPTACLE 120V�1Ȉ 180 NEMA 5�20R 46" .
B9A DRAFT BEER REFRIGERATOR 120V�1Ȉ 780 NEMA 5�20R 18" .
B10A BACK BAR REFRIGERATOR 120V�1Ȉ 780 NEMA 5�20R 18" .
B11A P.O.S. MACHINE 120V�1Ȉ 1200 NEMA 5�20R 48" .
B14A ICE MACHINE 120V�1Ȉ 1728 HARDWIRED 66" (6)
B15A REFRIGERATOR 120V�1Ȉ 696 NEMA 5�20R 86" .
B16A WORK TABLE RECEPTACLE 120V�1Ȉ 180 NEMA 5�20R 48" .
GENERAL NOTES:
• Electrical Contractor shall make all final electrical connections to kitchen equipment.
• Hardwired connections shall be made with LFMC with insulated ground wire bonded at both ends.
• Verify all equipment requirements (including those scheduled) with equipment installer prior to rough�in.
• All 20A, 120V receptacles installed in the kitchen area shall be GFCI type.
• Mounting heights shown in this schedule are for bidding purposes only. Coordinate exact heights with KEC.
REMARKS:
(1) 208V�1Ȉ power and control wiring for the evaporator fan and defrost shall be routed from condensing unit through the time clock
to the evaporator.
(2) Provide cord drop per detail, this sheet.
(3) Stub�up power and connect to NEMA 6�30R receptacle furnished on hot food table at 4" AFF.
(4) Stub�up power and connect to J�box in base of table for pre�wired duplex receptacle for equipment.
(5) Connect to J�box in base of table for pre�wired strip heater.
(6) Provide 20A/1P snap switch and make final flexible connection to equipment.
(7) Provide 20A/2P snap switch and make final flexible connection to equipment.
(8) Provide flexible connection from j�box in bar die to duplex receptacle on underside of blender shelf.
(9) Provide 30A/2P non�fused disconnect switch in NEMA 1 enclosure and make final flexible connection to equipment.
(10) Provide 30A/3P non�fused disconnect switch in NEMA 1 enclosure and make final flexible connection to equipment.
REMOTE FIRE PULL STATION. CABLE, AND ANY
OTHER MISCELLANEOUS EQUIPMENT SHALL BE
PROVIDED BY OTHERS.
PROVIDE 4" OCTAGONAL JUNCTION BOX WITH
SCREW THREADS SET AT THE 2 & 8 O'CLOCK
POSITIONS.
1/2" CONDUIT�ONLY, EXTENDED INSIDE WALL TO
ABOVE ACCESSIBLE CEILING SPACE.
NOTE: COORDINATE EXACT LOCATION WITH
AUTHORITY HAVING JURISDICTION, FIRE INSPECTOR
AND ARCHITECT PRIOR TO ROUGH�IN.
3
2
Coordinate electrical rough#in requirements
for all owner provided equipment with owner
and/or kitchen equipment supplier.
1. JUNCTION BOX AND CONDUIT FOR FIRE SUPPRESSION SYSTEM PULL STATION PER
DETAIL 3, THIS SHEET.
2. PROVIDE (5) #10, #10G, 3/4"C FROM THE WALK�IN FREEZER CONDENSING UNIT TO
THE FREEZER EVAPORATOR, WIRED THROUGH THE UNIT TIME CLOCK. VERIFY EXACT
REQUIREMENTS WITH KEC AND MAKE ALL FINAL ELECTRICAL CONNECTIONS.
3. CONNECT TO HOOD LIGHTS. COORDINATE WITH KEC.
4. HOOD FIRE SUPPRESSION SYSTEM CABINET. COORDINATE WIRING REQUIREMENTS
WITH SYSTEM INSTALLER.
5. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED 120V CIRCUIT.
6. PROVIDE 0.50 KVA BUCK�BOOST TRANSFORMER (120 x 240 PRIMARY VOLTS � 16/32
SECONDARY VOLTS) TO BOOST 208V�1PH TO 240V�1PH FOR CONNECTION TO
DUMBWAITER MOTOR. ACME ELECTRIC T181058 OR EQUAL.
7. 30A/2P NON�FUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL
FLEXIBLE CONNECTION TO DUMBWAITER MOTOR. VERIFY REQUIREMENTS WITH
EQUIPMENT INSTALLER.
ELECTRICAL PLAN NOTES BY SYMBOL#
E4.3
EMT CONDUIT
LIGHT FIXTURE FURNISHED WITH
WALK�IN. EC SHALL INSTALL
FIXTURE, SEAL BETWEEN BASE &
CEILING AND PROVIDE LAMPS.
OR
PROVIDE "ES" SEALING HUB BY
CROUSE HINDS (OR EQUAL)
PROVIDE NON�METALLICCONDUIT THRU WALK�IN
AND SEALANT BETWEEN
CONDUIT AND SLEEVE
THIS PORTION OF DETAIL IS
TYPICAL FOR ALL COOLER OR
FREEZER PENETRATIONS
4" STAMPED STEELJUNCTION BOX BY EC
CUT HOLE AS DIRECTED BYFSC. PROVIDE VINYL SLEEVE
AND GROMMETS.
NOTES:
• ALL CONDUIT TO BE RUN ON EXTERIOR OF WALK�IN BY EC.
• ALL PENETRATIONS THRU WALK�IN TO BE THOROUGHLY SEALED
• ALL LIGHT FIXTURES SHALL BE FURNISHED WITH EQUIPMENT, INSTALLED BY EC.
• ALL CONDUIT, INTERWIRING, AND MOUNTING OF FIXTURES BY EC.
WALK�IN
CEILING
WALK�IN
CEILING
4
CORD DROP DETAIL
NO SCALE5
FINISHED FLOOR
STRUCTURE
CONDUIT SUPPORTED TO
UNDERSIDE OF STRUCTURE
FLUSH MOUNTED JUNCTION
BOX WITH STAINLESS STEELCOVERPLATE TO ALLOW
CONNECTION TO 'KELLEM'
TYPE WIRE MESH STRAINRELIEF WITH ATTACHED
COUPLING
SUSPENDED GRID CEILING
'CADDY' T�GRID BOX
HANGER FOR MOUNTING
J�BOX TO CEILING
'KELLEM' GRIP WIRE
MESH STRAIN RELIEF
DROP CORD TO BE TYPE
"SO", WIRE SIZE TO
MATCH BRANCH CIRCUIT
'KELLEM' GRIP WIRE
MESH STRAIN RELIEF
CONNECTOR BODY,
(NEMA 5�20R UNO)
EQUIPMENT CORD
AND PLUG (BY OTHERS)
HEIGHT ABOVE FINISHEDFLOOR PER SCHEDULE
(VERIFY WITH KEC)
1
L12
2
L12
19
L12
11
L12
21L12
23
L12
27
L12
25L12
29
L12
31
L12
33
L12
35
L12
39
L12
37
L12
41
4
JJ
JJ
J
J
L12
14
L12
22
L12
24
L12
18
L12
26
L12
28
L12
8
L12
30
L12
9 L12
13 L12
15L12
17L12
10
L12
45
L12
43
L12
32
L12
6
L12
2
L12
4
L12
3L12
1
L22
2
L22
4L22
6
L22
8
L22
10
L22
12
L22
14
L22
16
L22
18
H01
4
L22
20
L22
22
L22
24
L12
20
WP/GFI
EF#9
5
L22
35
BX
J
6
7 L12
63
L12
61
L22
361
1
4809 Vue Du Lac Place, Suite 201
Manhattan, Kansas 66503
785.587.8042 FAX 785.587.8039
LST Consulting Engineers, PAProject 15020 December 2015
12�15�2015
SE
NIO
R C
OM
MU
NIT
Y D
EV
EL
OP
ME
NT
LE
AW
OO
D,
KA
NS
AS
E6.4
1. CIRCUIT BREAKER SHALL BE GROUND FAULT CIRCUIT INTERRUPTER (GFCI) TYPE.
PANEL SCHEDULE NOTES BY SYMBOL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
#
1
1
1