Inverter and AC System in Solar PV Grid Tied Power Plants
By
Rajneesh Shrotriya
CTO-Solar
![Page 2: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/2.jpg)
COMBINER BOX
INVERTERSOLAR MODULES
SYSTEM CONCEPT
![Page 3: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/3.jpg)
Magic of Static Power Generation
• No Moving parts
• Almost completely solid state
• More scalable & modular
• Only most complex component is the inverter
• DC to AC Inversion
• Maximum Power Point Tracking
• Grid Interconnection & Disconnection ( protection against islanding operation)
![Page 4: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/4.jpg)
Basic PV Block
![Page 5: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/5.jpg)
MPPT
![Page 6: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/6.jpg)
IGBT – The Main component inside inverter
IGBT –Main Component Thermal image @ Operation
![Page 7: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/7.jpg)
Voltage Regulation , PF control and LVRT
As there is no moving parts therefore instability and reactive power drawingfrom GRID is almost nil. The internal algorithm of inverter maintains the power factor within the range of 0.95 lag to 0.95 lead.
Voltage Regulation;-The inverter has +/- 10 % regulation with IT GRID connection
![Page 8: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/8.jpg)
Typical Solar Inverter Station
![Page 9: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/9.jpg)
Presenting Common issues being faced by Developers and EPC
Concern Expectation
Location Radiation Data Source
DC: AC Ratio of Plant Capacity
Loading of Inverters at DC side
No. of Inputs at Inverter
GIS / 3 Tier/ Meteonorm / NASA / correlation with Local nearby Weather station /others
Plant Capacity on AC equipment rating – Inverter / Inverter Transformer cumulative .
Temperature rating of Inverter required to be fixed like modules i.e. 40 deg C/50 Deg C: 980 KW -1150 KW
![Page 10: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/10.jpg)
Continue …..
Awarded AC Capacity 10 MW
Tolerance Should be provided
Standardization of parameters and Norms for Solar Modules, Inverters , execution and other components
Inverter cumulative Capacity – 9.75 MW / 10.35 MW
Capacity certification basis for Nodal agency / MNRE and CEIG .
IS is required to be created , contractors are confused with certain IS codes which is for conventional power plant and not applicable for PV
![Page 11: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/11.jpg)
Continue……
Harmonics % at rated load and different other less loads
Reactive power absorption Grid code -No clarity
Parameters are varying at different loads in % .
As PV plant operates at unity PF, Absorption at 0.8 /0.85 leads to reduction in yield and commercial loss to Developer. Compensation policy is required to be set.
![Page 12: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/12.jpg)
Continue….
Forecasting- No clarity
Radiation History and Generation DATA of installed plant should be available at a single website
Guidelines in line with SLDC norms is required to be set and communicated
For planning of plant capacity and expansion
![Page 13: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/13.jpg)
Continue….
Power Transmission Infrastructure information based on CEA as well state wise network.
Standard Procedure for accessing Plant Performance
Load flow study is required for all potential PV area and nearby MV-HV transmission network , space availability at SS
Availability, PR, CUF acceptability , Uncertainties.
Bankers and Financial institutions should be aware of this procedures
![Page 14: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/14.jpg)
Continue
Air Quality for PV Plant
Isolation Devices and Protection Philosophy
![Page 15: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/15.jpg)
Inverter Layout 2- For Discussion
![Page 16: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/16.jpg)
Hot Air Duct and Inverter Transformer for Discussion
![Page 17: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/17.jpg)
Internal Heat Duct, Aux. System –Inverter Room
![Page 18: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/18.jpg)
Typical String Combiner Box
![Page 19: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/19.jpg)
Connection Space for Cables-A critical factor
![Page 20: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/20.jpg)
Switch yard
Keeping the switchyard block in middle of the plot for low losses and less cable cost
![Page 21: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/21.jpg)
66/11 KV Double Bay Switchyard-Metering bays
![Page 22: DuPont-SECI · DuPont-SECI New Delhi 25thJune 2015 Inverter and AC System in Solar PV Grid Tied Power Plants By Rajneesh Shrotriya CTO-Solar](https://reader031.vdocuments.us/reader031/viewer/2022022603/5b5c41b27f8b9ad21d8bd63c/html5/thumbnails/22.jpg)