DubaiMetroSignageProject PENTAGONFILMTEKFZEPRE-CONDITIONSURVEY
MetroStation:OUDMETHA
Date:5/1/16
Location TYPE1 TYPE2 TYPE3 TYPE4 CHECKED
Platform 12 YES
Concourse 2 1 1 YES
EntrancePod 2 YES
GlassFaults/MissingFixtures/OtherComments:
Summary:
BOLTSNEEDED 3 Comments:SM:0561775841
WASHERSNEEDED GLASSREPLACEMENT
Location Type Comment Photo Urgent EntrancePod
Exit21 GLASSCHIP–TOP/RIGHT A
ConcourseUnpaid 1 GLASSCHIP–BOT/RIGHT B
Platform>CreekMSD2410 4 GLASSCHIP–RIGHTSIDE C
Platform>CreekMSD2404 4 GLASSCHIP–BOLTHOLE,GLASSCHIP–TOP/RIGHT D,E
Platform>EtisalatEED1504 4 MISSINGBOLT–TOP/MID
Platform>EtisalatEED1527 4 MISSINGBOLT–TOP/MID,MISSINGBOLT–BOT/MID
Type1–SinglewithoutheaderType2–SinglewithheaderType3–DoublewithoutheaderType4–Doublewithheader
![Page 2: Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE ...pentagon-intl.com/wp-content/uploads/2015/10/OUD-METHA.pdf · Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE-CONDITION](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042b5c4ff3f9f0e974d454d/html5/thumbnails/2.jpg)
FigureA
FigureB
![Page 3: Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE ...pentagon-intl.com/wp-content/uploads/2015/10/OUD-METHA.pdf · Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE-CONDITION](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042b5c4ff3f9f0e974d454d/html5/thumbnails/3.jpg)
FigureC
FigureD
![Page 4: Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE ...pentagon-intl.com/wp-content/uploads/2015/10/OUD-METHA.pdf · Dubai Metro Signage Project PENTAGON FILMTEK FZE PRE-CONDITION](https://reader036.vdocuments.us/reader036/viewer/2022071214/6042b5c4ff3f9f0e974d454d/html5/thumbnails/4.jpg)
FigureE