DISTRIBUTION PLANNINGIRP CONTEMPORARY ISSUES
IURC TECHNICAL CONFERENCE – APRIL 15, 2019
MIKE HOLTSCLAW, PE
Director, T&D Operations
Indianapolis Power & Light Company1
![Page 2: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/2.jpg)
TOPICS
• Distribution System Design – Current
State
• Distribution System Design – Future
State
• Distribution System Changes
• Future Planning Considerations
Distribution Planning will become one
of the most challenging jobs in the
utility industry
2
![Page 3: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/3.jpg)
• Radial from the substation to the last
end use customer, one way power flow
Lowest Voltage
Substation is
sole sourceHighest Voltage
3
DISTRIBUTION SYSTEM DESIGN
CURRENT STATE TODAY
![Page 4: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/4.jpg)
• Voltage profile designed to be higher at
the sub and drop as you get further out
on the circuit
• Ampacity across the circuit will vary,
usually higher towards the sub
4
DISTRIBUTION SYSTEM DESIGN
CURRENT STATE TODAY
![Page 5: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/5.jpg)
DISTRIBUTION SYSTEM DESIGN
FUTURE STATE
• Many New Challenges
• Will Need to be Designed for Two Way Power Flow
Voltage too high
Large Solar Site
Fault and load current goes both ways
False tripping, over duty, excess inrush
Will an island occur if this opens?
What about interrupting capacity?
Difficult to set one bus
voltage for both feeders
(solar vs non-solar)
5
![Page 6: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/6.jpg)
DISTRIBUTION SYSTEM DESIGN
FUTURE STATE
• Flatter voltage profile across the circuit
from the substation out
• Distributed Energy Resources (DERs)
located throughout the circuit
• Risk of creating islands, how to reconnect
• Circuit ampacity at least the same across
the circuit
6
![Page 7: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/7.jpg)
SYSTEM DESIGN CHANGES
• Smart Volt-VAR Control
(IVVC)
– Smart ULTC1 controls
– Smart Line Capacitor
Controls
• Smart Feeder relays
• Smart Switches/Reclosers
• Smart Meters
7
1 ULTC – Under Load Tap Changer
![Page 8: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/8.jpg)
SYSTEM DESIGN CHANGES
• FLISR – Fault Location, Isolation, System
Restoration (automatic)
• ADMS – Advanced Distribution Management
System to make it all work.
– Monitor/Control Devices
– Needs Detailed Circuit Model
8
![Page 9: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/9.jpg)
SYSTEM DESIGN CHANGES
• DERs at the distribution level
– Solar (Utility Scale & Rooftop)
– Wind
– Energy Storage
– Combined Heat & Power (CHP)
• Electric Vehicles
– Charging Requirements, type slow/fast
– Energy Source
– Time of Day
• Future things we haven’t thought of yet
9
![Page 10: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/10.jpg)
FUTURE DISTRIBUTION PLANNING
CONSIDERATIONS
• Will be more complicated going forward
• Will likely look more like transmission
planning does today
• Will require more detailed circuit level
models
• Will require considering not only load
profiles but DER dispatch patterns, not just
peak load
10
![Page 11: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/11.jpg)
FUTURE DISTRIBUTION PLANNING
CONSIDERATIONS
• How to treat DERs
– As Load off set
– As Capacity Resource
• Monitoring and control of DERs through
Utility’s ADMS
• Utility’s obligation to serve, how to
calculate capacity requirements if DERs
off line or unavailable
11
![Page 12: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/12.jpg)
FUTURE DISTRIBUTION PLANNING
CONSIDERATIONS
• EV Charging
– Transformer Sizing
– URD cable sizing
• System Protection &
Coordination of DERs
• Impact to Bulk Electric System
12
![Page 13: DISTRIBUTION PLANNING - Indiana Distribution Planning... · 2019-04-16 · FUTURE DISTRIBUTION PLANNING CONSIDERATIONS •Will be more complicated going forward •Will likely look](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fb25dfb93fc2f79b60c6c13/html5/thumbnails/13.jpg)
None of the issues mentioned
are road blocks or “show
stoppers”, but things the
industry is and will work
through as we move forward
together