Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Welcome
Display Steering Committee meetingDisplay Steering Committee meeting
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Tuesday 8 JuneMorning 900 ndash 1230 SC Meeting
Afternoon 1300 ndash 1830 SC Meeting
Wednesday 9 NovemberMorning 830 ndash 1200 SC Meeting
Afternoon Meeting with Motiva otherwise
1430 ndash 1630 Training workshop
Visit to Suomenlinna
Agenda ndash overall agendaAgenda ndash overall agenda
Display Steering Committee meeting Helsinki 8-9 June 2010
Agenda ndash Tuesday Agenda ndash Tuesday 8 June
0900 Opening and welcome (Ulla amp Peter)
0915 How is the Displayreg Campaign running (Peter +Ian)
0945 WP1 General Project Administration (Peter)
1100 Tea
1130 WP1 Project Administration - Finance (Peter) 1200 Lunch
1300 WP1 Project Administration - Finance (Peter)
1330 Detailed evaluation of the Campaign (Richard)
1530 Tea
1600 WP1 TCA award competition (Peter)
1630 WP6 Communication and dissemination (Ian)
1715 WP2 Briefing note for the Concerted Action (Peter)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
0830 WP3 Local Communication activities (Alex) UdineSalernoLilleMulhouse
0930 WP3 Local Communication activities (Part II)KSSENAKREAHealthy CitiesCascaisAlmada
1030 Tea1045 WP3 Local Communication activities (Part III)CorkMilton KeynesBristolOpen discussionHelsinki (1130 ndash 1200)
1200 Lunch1300 WP3 Local Communication activities (Peter)
Agenda ndash Wednesday 9Agenda ndash Wednesday 9 June
Display Steering Committee meeting Helsinki 8-9 June 2010
How is the Displayreg Campaign
running
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Tuesday 8 JuneMorning 900 ndash 1230 SC Meeting
Afternoon 1300 ndash 1830 SC Meeting
Wednesday 9 NovemberMorning 830 ndash 1200 SC Meeting
Afternoon Meeting with Motiva otherwise
1430 ndash 1630 Training workshop
Visit to Suomenlinna
Agenda ndash overall agendaAgenda ndash overall agenda
Display Steering Committee meeting Helsinki 8-9 June 2010
Agenda ndash Tuesday Agenda ndash Tuesday 8 June
0900 Opening and welcome (Ulla amp Peter)
0915 How is the Displayreg Campaign running (Peter +Ian)
0945 WP1 General Project Administration (Peter)
1100 Tea
1130 WP1 Project Administration - Finance (Peter) 1200 Lunch
1300 WP1 Project Administration - Finance (Peter)
1330 Detailed evaluation of the Campaign (Richard)
1530 Tea
1600 WP1 TCA award competition (Peter)
1630 WP6 Communication and dissemination (Ian)
1715 WP2 Briefing note for the Concerted Action (Peter)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
0830 WP3 Local Communication activities (Alex) UdineSalernoLilleMulhouse
0930 WP3 Local Communication activities (Part II)KSSENAKREAHealthy CitiesCascaisAlmada
1030 Tea1045 WP3 Local Communication activities (Part III)CorkMilton KeynesBristolOpen discussionHelsinki (1130 ndash 1200)
1200 Lunch1300 WP3 Local Communication activities (Peter)
Agenda ndash Wednesday 9Agenda ndash Wednesday 9 June
Display Steering Committee meeting Helsinki 8-9 June 2010
How is the Displayreg Campaign
running
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Agenda ndash Tuesday Agenda ndash Tuesday 8 June
0900 Opening and welcome (Ulla amp Peter)
0915 How is the Displayreg Campaign running (Peter +Ian)
0945 WP1 General Project Administration (Peter)
1100 Tea
1130 WP1 Project Administration - Finance (Peter) 1200 Lunch
1300 WP1 Project Administration - Finance (Peter)
1330 Detailed evaluation of the Campaign (Richard)
1530 Tea
1600 WP1 TCA award competition (Peter)
1630 WP6 Communication and dissemination (Ian)
1715 WP2 Briefing note for the Concerted Action (Peter)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
0830 WP3 Local Communication activities (Alex) UdineSalernoLilleMulhouse
0930 WP3 Local Communication activities (Part II)KSSENAKREAHealthy CitiesCascaisAlmada
1030 Tea1045 WP3 Local Communication activities (Part III)CorkMilton KeynesBristolOpen discussionHelsinki (1130 ndash 1200)
1200 Lunch1300 WP3 Local Communication activities (Peter)
Agenda ndash Wednesday 9Agenda ndash Wednesday 9 June
Display Steering Committee meeting Helsinki 8-9 June 2010
How is the Displayreg Campaign
running
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
0830 WP3 Local Communication activities (Alex) UdineSalernoLilleMulhouse
0930 WP3 Local Communication activities (Part II)KSSENAKREAHealthy CitiesCascaisAlmada
1030 Tea1045 WP3 Local Communication activities (Part III)CorkMilton KeynesBristolOpen discussionHelsinki (1130 ndash 1200)
1200 Lunch1300 WP3 Local Communication activities (Peter)
Agenda ndash Wednesday 9Agenda ndash Wednesday 9 June
Display Steering Committee meeting Helsinki 8-9 June 2010
How is the Displayreg Campaign
running
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
How is the Displayreg Campaign
running
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
12700 buildings12700 buildings
406 local authorities406 local authorities
28 companies registered28 companies registered
Display poster reviewed now in 26 languagesDisplay poster reviewed now in 26 languages
Website largely reviewedWebsite largely reviewed
Display calculation adapted to Swiss Display calculation adapted to Swiss legislationlegislation
Main achievements by June 2010Main achievements by June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg Video(s) became Displayreg Video(s) became popularpopular
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Display participants
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
DisplayDisplayregreg Software News Software News
Integration of 4 more building typesIntegration of 4 more building types
IndustrialIndustrial
CommercialCommercial
RestaurantRestaurant
Individual homeIndividual home
Fine tuning to existing building typesFine tuning to existing building types
Local weather correction by regional default Local weather correction by regional default valuesvalues
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
1 Kindergarten8
2 General school 41
3 Professional school 3
4 Administrative14
5 Swimming pool (covered)
2
6 Sports Facilities
6
7 Depot 2
8 Meeting places14
9 Hospital2
10 Rescue centre 1
11 Multi-residential 7
New building types0
Building distribution - May 2010 (12637 in total)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
0500
100015002000250030003500400045005000
France
United
King
do
m
Sw
itzerland
Ukraine
Italy
Finland
Bulg
aria
Number of building per country (over 200)
Display Database
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the EU Users Club and the TCA Award
ceremony
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
30 participants
Interaction with the 6 finalists
Lively contribution to the briefing note for the Concerted Action
EU Users Club SalernoEU Users Club Salerno28th April 201028th April 2010
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
1st - Ivanic-Grad (HR)
2nd - Pays de Rennes (FR)
3rd ndash Zurich (CH)
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Topics Review of the Almada SCM decisions Interim Report (reacutesumeacute status) Review of the Performance Indicators Management and coordination activities Project amendment (status) Participation in the Build-Up initiative Next Steering Committee meeting
WP1 Project AdministrationWP1 Project Administration
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Almada SCM DecisionsActions
Build UP Initiative
bull PeterIan to monitor that the CYBER deliverables and events promoted bull All partners to register and to participate in one of the communities
Energie-Citeacutes and all partners (as far as they can) to continue the lobbing and looking for synergies with national governments Reporting
bull 31 January (latest) submission of the amendment documentsbull All partner submission of updated performance indicatorsbull 30 March Report ready (PS amp IT)bull Share the communication materials that they have developed bull Ian to place the material on the website bull Update the list of users clubs
Contribute to the Display e-newsflash and the website (blog) All partners to participate in the DisplayTCA award competition
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Interim Report (reacutesumeacute status)
Submitted by 10 AprilSubmitted by 10 April
Letter with comments expected by 0806Letter with comments expected by 0806
Phone comments NathaliePhone comments Nathaliebull Globally well on lineGlobally well on line
bull Serious concerns about WP 2 outcomesSerious concerns about WP 2 outcomesbull UK Partners clarify their support from CYBER to the UK Partners clarify their support from CYBER to the DECsDECs
bull Few partners behind scheduleFew partners behind schedule legislationlegislation
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Review of the Performance Indicators
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
bullNumber of buildings with major refurbishmentsbullAverage energy savings in partner buildings 200811Increase of RES in partner buildings with posters 200811
Number of buildings with major refurbishments
Average energy savings in partner buildings 200811
Increase of RES in partner buildings with posters 200811
Review Performance Indicators
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Management and coordination
Managementbull Input website newsletter etcbull Reactivity upon emailingbull Improvements (skype conferences )
Project amendment (status)bull Feedback Nathalie
Next Steering Committee meeting
bull Location date
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Agree on tools to assure continuous input from project partners to overall taskFixing a methodology to determine the overall performance indicatorsAgree on an ldquorecovery planrdquo in order to ensure that all partners achieve their deliverables Fixing preparatory work on framework and templates for the Final reportDecision for date (autumn 10 proposed) and location of the next steering committee meeting
DecisionsActions to be takenndash Tools to assure continuous input from project
partners to overall taskndash Methodology to determine the overall
performance indicatorsndash ldquoRecovery planrdquo in order to ensure that all
partners achieve their deliverables ndash Fixing preparatory work on framework and
templates for the Final reportndash Date and location of the next SCM
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
WP1 Project AdministrationWP1 Project AdministrationFinancesFinances
Interim cost-statement (reacutesumeacute status)
Second pre-payment
Outlook expensesbudget final period per partner
bull Overall progress
bull Specific per cost category
Budget Contract Amendment (need for)
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Define tasks per project partner in order to assure smooth edition of the final cost-statement
bull Final budget per project partner and eventual budget shifts between partners (and cost-categories)
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
WP2 Detailed evaluation of WP2 Detailed evaluation of the Campaign the Campaign
ndash Encourage those partners who havenrsquot already done so to complete pre-communication surveys
ndash To encourage those partners who conducted communication campaigns to conduct post-evaluation surveys
ndash To discuss and agree procedure for distributing energy analysis questionnaire
DecisionsActions to be taken
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Before and after poster Before and after poster
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
Topics
bull Review competition 2010
bull Presentation of the ldquoBest of Awards Galleryrdquo
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Panorama of the DisplayTowards Class A
Award applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
15 applicants15 applicants
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
6 finalists6 finalists
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Bristol City
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Province of Granada
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Ivanic - Grad
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Pays de Rennes
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Salerno
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Zuumlrich
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Award winners galleryAward winners gallery
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
WP4 Display Award
bull Promotion competition 2011 (towards non Display participants)
bull Ideas for prizes
bull Schedule
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Promotion activities and channels for the award competition involvement of CYBER Partners
bull Promotion of the Awards Gallery
bull Collecting ideas for prizes for the competition 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
WP6 Communication and WP6 Communication and disseminationdissemination
bull Contribution of the CYBER partners to the bull Display website (blog)bull Monthly e-news flash
bull Feedback from the national Display users club(s)bull Promotion at events clarification on the task
identification of interesting events update of the event list
bull Second video (feedback from Joao Bettencourt)bull Final event during EUSEW 2011
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg websiteDisplayreg website
Either online connection or presentation of the three principle pictures
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Your communication campaignYour communication campaign
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Display in a nutshellDisplay in a nutshell
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Displayreg e-newsflashDisplayreg e-newsflash
Edited monthly
2335 subscribers
Your input is always welcome
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Feedback from the national Users Clubs
Tour de table
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
(CYBER) Display Eventsbull National Events
ndash National Meeting (not local)
ndash Your name in the programme
ndash List of participants
ndash IEE Logo in your presentation
bull Final event (during EUSEW)ndash Project outcomes presentation
ndash Award ceremony
ndash Other ideas (Launching EU voluntary certificate)
ndash Other Partners
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Second video
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
DecisionsActions to be taken
bull Inputs CYBER partners to keep the new website (blog) attractive and lively
bull Frame of final event and its promotion
bull Decide on who will contribute directly to the final Display video
bull Clearer definition of a national event and identification of national and European events where Display will be
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Update on the EPBD Recast
bull Nov 08 Proposal DG ENER
bull 1208-0209 reviewing process
bull Apr 09 Vote EP of amendments
bull Nov 09 Political agreement ECEP and Council of European Union
bull May 10 Final approval EP and EU Council
bull JunJul 10 Enter into force
bull Dec 12 Transposition to national law
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Lack of qualified certifyers (Portugal)bull UK also had a lack at first but now there are enough
and the cost has gone down bull Italy idembull In France Pays de Rennes only 5 percent have a
DPE ndash there are no fines same for Portugal bull Italy ndash no fines for existing public buildingsbull Finland certificates still voluntary for existing public
buildings
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos newmodified
bull Energy performance to be expressed in Primary Energy
bull RES definition does not include heat recovery from waste incineration
bull New buildings are at least very low energy buildings by 31 December 2020
bull By 2011 voluntary common EU certification for non-residential buildings
bull Certificates to be issued for buildings ge250msup2 bull Introduction of a building typology (9 types)
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
Whatrsquos relevant for LAs
bull 17a) Public authorities should lead by example and should implement the recommendations included in the energy performance certificate within its validity period Member States should include within their national plans measures to support public authorities to become early adopters of energy efficiency improvements and to implement the recommendations included in the energy performance certificate within its validity period In developing the national plans Member States should consult the representatives of local and regional authorities
bull 21a) Local and regional authorities are critical for the successful implementation of this Directive Their representatives should be consulted on every aspect of its implementation at national or regional level
How is labelling of public buildings going in my city What is my message to the national government for implementation of the current legislation What are my expectations for the transposition of the revised EPBDAm I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Briefing Note ndash Key QuestionsBriefing Note ndash Key Questions
bull How is labelling of public buildings going in my city
bull What are my expectations for the transposition of the revised EPBD
bull Am I motivated to participate in the transposition process
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
How is labelling of public How is labelling of public buildings going in my citybuildings going in my city Are complying but not making use of the certificate for communication etc (Milton Keynes) Lot of time to develop regional law in Spain but no real laws in Granada always coming next monthNational law software needs to be improved (Granada) Modena stopped using Display as it does not know whether it complies with Regional or National guidelines cannot follow two different types of certification systemsIn Portugal most public buildings do not have certificates especially for existing buildings as the system is complicates and very expensive Cascais - Cost 25-5 eurs per square metre (Portugal)
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD To be consulted by national government as in Croatia Rijeka and Ivanic Grad where they proposed Display unfortunately without success Zagreb would like to be able to do the certificates internallyUK and Wales ndash do not touch the existing methodology of DECs change to publically visited buildings ndash hotels ndash needs to stay easily measurableNeeds to be a requirement to communicate the results to the publicItaly ndash For new buildings use asset rating and operational for existing public buildings need to be able to use total consumption for Asset rating to later compare Asset and operational rating results
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010
bull Hungary ndash Energia Club are proposing that Display to be an official equivalent for the certificate (document attached)
bull France ndash need to have fines
What are my expectations for What are my expectations for the transposition of the revised the transposition of the revised
EPBDEPBD
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby
Display Steering Committee meeting Helsinki 8-9 June 2010Display Steering Committee meeting Helsinki 8-9 June 2010
Am I motivated to participate in Am I motivated to participate in the transposition processthe transposition process
Interest to lobby at European and National level ndash Spain Italy Portugal UK Croatia and HungarySuggestion that maybe big European chain stores can lobby