![Page 1: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/1.jpg)
Digital Innovation in the Construction of Buildings
May.2019Thomas MesserveyCEO/Founder – R2M
![Page 2: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/2.jpg)
PROMPT
How will the world of construction will look like in 10 years from now,
from the construction and operational phases?
• Not so much different
• More digital technologies and digital tools
• Buildings that have more requirements (NZEB / Circular)• Larger gap between have and have not companies
• Increased risk to a major market disruption where many won’t
survive (analogous to Amazon vs. shopping malls or Uber to Taxis
or big utilities vs. smart grid)• Opportunities for companies that innovate
![Page 3: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/3.jpg)
Block I: R2M
A bit about R2M and where we fit in digitalization and construction
• Who we are
• How we fit into digitalization and construction
• Sustainability certification as a market point of entry
• Sustainability certifications in the digital age
• What drives us
![Page 4: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/4.jpg)
OUR LOCATIONS
ItalyR2M Solution S.r.l.Via F.lli Cuzio 42
27100 Pavia, ItalyP.IVA: IT04998380879
SpainR2M Solution Spain, S.L.
Calle Villablanca 8528032 Madrid, EspañaVAT N° ES B87348470
FranceR2M Solution SASLes Galeries de
Beaumon06330 Roquefort-les-
Pins, FranceVAT: FR11828579367
United KingdomR2M Solution S.r.l.
Via F.lli Cuzio 4227100 Pavia, Italy
P.IVA: IT04998380879
R2M Solution
R2M IN BRIEF
R2M was founded 7 June 2012 inMilan and has its main office in theciy of Pavia, Italy.
R2M Solution has offices in Italy,France, Spain and the UK with ateam of approximately 50 personswho offer integrated andmultidisciplinary consulting serviceswith the objective of closing the
gap between research and marketimplementation of innovativetechnologies developed in theframework of European Research.
15 persons are dedicated todynamic energy modelling, LEED,BREEAM, Energy Audits,Commissioning, Indoor Air Quality,and digitalization of constructionand retrofitting processes.
In 2018, R2M Energy, an ESCOtargeting innovative NZEBinterventions, was founded.
![Page 5: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/5.jpg)
What we do
Innovation
• Participation and support tonational and Europan projects.
• Technology scouting andtechnology transfer.
• Software and services dedicated tomanagement and financialaccountability of R&D projects alsoleveraging tax incentives on R&D.
R2M Energy
• Demand Response & EnergyManagement
• NZEB design & implementation
• Deep Retrofit (Conto Termico 2.0)• Energy Diagnosis and ESCO Projects
Sustainability
• Dynamic energy modelling • Sustainability cetrifications (LEED,
BREEAM, WELL)• Commissioning• Due diligence
ICT
• Robotics software, training & applications
• Data Mining and sentiment analysis• Customization of ERP Solutions
(enterprice resource planning)
Engineering
• Worksite measurements (blower door test, thermography, IAQ)
• Drone overflights, video & 3D model construction, point clouds
• Matterport scanning with navigable
models, tags, point clouds, BIM• Structural Health Monitoring
Innovative Products
• Zutec: BIM-enabled Construction Management Platform
• IES: Dynamic Environmental and
Energy Simulation Environment• Onyx Solar: Photovoltaic Glass (BIPV)
![Page 6: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/6.jpg)
R2M Solution
360 degree integrated solutions across all phases of construction (and linking them). From design, to
construction, operation, maintenance and end of life, the development and implementation of new
technologies and tools for the monitoring and use of data to improve processes and performance.
![Page 7: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/7.jpg)
Onyx Solar – Photovoltaic Glass
![Page 8: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/8.jpg)
Sustainability Certifications – Our Market Point of Entry
Milan area study by CBRE• Rents 7-14% higher• After 6 months on market, 80% of certified building
rented vs. 21% non-certified
Building Certification is a good market point of entry because:• You engage decision makers• They are looking for innovation and are typically open
minded (e.g. early adopters)• They are investing in sustainability
![Page 9: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/9.jpg)
Sustainability Certifications – Today & Tomorrow
+ + +
Today
Tomorrow
Design
Based
Certification
Data Based
Certification
![Page 10: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/10.jpg)
Sustainability Protocol
Credits vs ENERGY and
DECARBONIZATION
▪ optimize
commissioning
operations
▪ easy sharing of
commissioning
results
Digitization and main objectives of sustainability
certification protocols
![Page 11: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/11.jpg)
Sustainability Protocol
Credits vs ENERGY and
DECARBONIZATION
▪ integration and
sharing of the
results of dynamic
simulations
Digitization and main objectives of sustainability
certification protocols
![Page 12: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/12.jpg)
Sustainability Protocol
Credits vs ENERGY and
DECARBONIZATION
▪ user involvement
in optimizing
energy
performance
▪ careful check
after construction
and during
operation
Digitization and main objectives of sustainability
certification protocols
![Page 13: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/13.jpg)
Sustainability Protocol
Credits vs CIRCULAR
ECONOMY
▪ easy LCA
comparison for
different solutions
Digitization and main objectives of sustainability
certification protocols
![Page 14: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/14.jpg)
Sustainability Protocol
Credits vs COMFORT and
HEALTHINESS
▪ indoor air quality
improvement related with
natural ventilation
strategies
▪ improvement of thermal
comfort
Digitization and main objectives of sustainability
certification protocols
![Page 15: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/15.jpg)
Digitization and main objectives of sustainability
certification protocols
Sustainability Protocol
Credits vs COMFORT and
HEALTHINESS
▪ interior lighting and
daylighting integration
▪ interior lighting
optimization
![Page 16: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/16.jpg)
Digitization and main objectives of sustainability
certification protocols
Sustainability Protocol
Credits vs COMFORT and
HEALTHINESS
▪ easy custom setting of
the parameters of
environmental comfort
![Page 17: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/17.jpg)
BIM is the platform for digitization
integration of all the building life
▪ all digital technologies that
support the achievement of
sustainability credits can be
integrated into a BIM platform
▪ a process managed with the BIM
can instantly provide the level
of sustainability related to
varying scenarios digitally
simulated.
Digitalization and BIM for the construction sector
![Page 18: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/18.jpg)
Zutec Video Hit2Gap
https://twitter.com/ZUTECGROUP/status/1129050501973184516
One example of digitalization – combining BIM/real time operational data.
A result coming out of the H2020 project Hit2Gap
![Page 19: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/19.jpg)
Motivation: Buildings, Energy & Population
DG Research & Innovation at Build Up website.http://www.buildup.eu
![Page 20: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/20.jpg)
Climate change – tipping point?
At 1.5 degrees of warming compared to 2 degrees of warming, 90 percentof coral reefs will bleach, as opposed to 98 percent. Sea levels will riseby 40 centimeters, as opposed to 50…
![Page 21: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/21.jpg)
Impacts of climate change
![Page 22: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/22.jpg)
Block II: Construction Sector Today & Tomorrow
1. Market landscape: digitalize or die
2. The productivity and business opportunity of digitalization
3. Upskilling companies and the labor force
4. Intelligent digital mesh
![Page 23: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/23.jpg)
26/05/2019
#DTConf201823
FROM MODERNIZE OR DIE TO DIGITALIZE OR DIE
The patient (construction) is sick, perhaps even dying.
Farmer Review
![Page 24: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/24.jpg)
26/05/2019
#DTConf201824
FROM MODERNIZE OR DIE TO DIGITALIZE OR DIE
Productivity has declined and is not keeping up with other sectors
![Page 25: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/25.jpg)
26/05/2019
#DTConf201825
FROM MODERNIZE OR DIE TO DIGITALIZE OR DIE
Labor force: most self-employed, most SMEs, nearly least trained
Is this the kind of opportunity wewant to offer to our students, childrenor the next generation?
How can we attract or keep top-talentinto the construction sector?
![Page 26: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/26.jpg)
26/05/2019
#DTConf201826
PRODUCTIVITY OPPORTUNITY
Mckinsey & Co
![Page 27: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/27.jpg)
26/05/2019
#DTConf201827
CONSTRUCTION MATTERS
• Engineering Firms• Builders
Business opportunity in
unlocking this value proposition
![Page 28: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/28.jpg)
26/05/2019
#DTConf201828
Definition:
“Digitization is about businessesencountering connected systemsat every link in the value chain. Itis about working with tools andpractices based on informationand communication technology”
DIGITALIZATION AS A CATALYST TO MAKE CONSTRUCTION GREAT AGAIN
- Roland Berger
“Constructionneeds to catch up.”
Photo credits: vitranc, peshkov, iStockphoto
![Page 29: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/29.jpg)
26/05/2019
#DTConf201829
DIGITALIZATION AS A CATALYST TO MAKE CONSTRUCTION GREAT AGAIN
Product suppliers areeducating but is the sectorresponding / buying in?
![Page 30: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/30.jpg)
26/05/2019
#DTConf201830
CONSTRUCTION ROLES THAT DON’T EXIST YET FROM THE B1M
Drone Wrangler – Robot Commander – Ocean Architect
https://www.theb1m.com/video/3-construction-jobs-that-dont-exist-yet
There will be change and new
opportunities (skills needed)
![Page 31: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/31.jpg)
26/05/2019
#DTConf201831
HOW ARE WE DOING USING AVAILABLE TECHNOLOGIES?
PC / Smartphone / TabletUtilization rates
Accessibility & Planned UseBasic technologies
In surveys of 177 construction firms of various sizes:
• In over half of construction firms, greater than 60% of employees have access to PCs and internet but there is still a large percent (29%) where access is limited to 20-40% of the staff and in 12% of firms, access is less.
• Smartphones are less implemented and despite the standard stock photographs of construction workers with tablets, in over half of construction firms, less than 20% of the staff have access.
![Page 32: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/32.jpg)
26/05/2019
#DTConf201832
HOW ARE WE DOING USING AVAILABLE TECHNOLOGIES? BIM
Accessibility & Planned UseBasic technologies
2015 Study of Construction Planning Methods (appx 300 respondents):
• Only 29% of firms are using BIM (BIM 3D).
• Only 6% of firms are using BIM that incorporate the element of time (BIM4D).
![Page 33: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/33.jpg)
26/05/2019
#DTConf201833
BUSINESS VALUE OF BIM
![Page 34: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/34.jpg)
26/05/2019
#DTConf201834
BUILT2SPEC A first important step is to make better use of the technologies we have available today
![Page 35: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/35.jpg)
26/05/2019
#DTConf201835
BUT THERE’S A PROBLEM
“When you’re a small organization, everyone has to chip in and just get it done. You are focused on tactical execution.” (and not on innovation)- Jeff Weiner CEO linkedin
What is the social impact of an EU construction workforce that doesn’t
upskill fast enough?
Source: European Builders Confederation
![Page 36: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/36.jpg)
26/05/2019
#DTConf201836
IMPLEMENTING CHANGE
Associations as gateways to industrials and professionals for both implementation and training
![Page 37: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/37.jpg)
26/05/2019
#DTConf201837
DIGITALIZATION AND ESPECIALLY ITS RESEARCH, DEVELOPMENT AND INNOVATION IS NOT (ONLY) ABOUT PCS / SMARTPHONES & TABLETS
Top Strategic Technology Trends for 2018
“The intelligent digital mesh is a foundationfor future digital business and its ecosystems.To create competitive advantage, enterprisearchitecture and technology innovationleaders must evaluate these top trends toidentify opportunities that their organizationscan exploit.”
![Page 38: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/38.jpg)
26/05/2019
#DTConf201838
Artificial Intelligence Intelligent Things
DIGITALIZATION AND ESPECIALLY ITS RESEARCH, DEVELOPMENT AND INNOVATION IS NOT (ONLY) ABOUT PCS / SMARTPHONES & TABLETS
![Page 39: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/39.jpg)
26/05/2019
#DTConf201839
Digital Twins Cloud and Edge Computing
DIGITALIZATION AND ESPECIALLY ITS RESEARCH, DEVELOPMENT AND INNOVATION IS NOT (ONLY) ABOUT PCS / SMARTPHONES & TABLETS
![Page 40: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/40.jpg)
26/05/2019
#DTConf201840
Platforms of Services& Multi-Sided Business Models
Intelligent Digital Mesh
DIGITALIZATION AND ESPECIALLY ITS RESEARCH, DEVELOPMENT AND INNOVATION IS NOT (ONLY) ABOUT PCS / SMARTPHONES & TABLETS
![Page 41: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/41.jpg)
26/05/2019
#DTConf201841
DIGITALIZATION AND ESPECIALLY ITS RESEARCH, DEVELOPMENT AND INNOVATION IS NOT (ONLY) ABOUT PCS / SMARTPHONES & TABLETS
https://www.iesve.com/icl
Digital Twins – beyond building and toward urban
spaces / smart cities
![Page 42: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/42.jpg)
26/05/2019
#DTConf201842
AS WE APPLY THESE CONCEPTS TO THE CONSTRUCTION SECTOR –WHAT TYPES OF BUILDINGS AND INFRASTRUCTURE ARE WE TRYING
TO DELIVER AND WHAT NEW SERVICES ARE UNLOCKED?
![Page 43: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/43.jpg)
26/05/2019
#DTConf201843
ARE WE BUILDING FOR TOMORROW?
Revisit value proposition designfor…..
and make sure we’re preparingto build the buildings peoplewant coupled to the appropriateinfrastructure .
2070-2120
Can business stay as usual?Any risk to market disruption?
![Page 44: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/44.jpg)
“Voice has emerged as adelightful technology in thehome, and there are now morethan 20,000 Alexa-compatiblesmart home devices from 3,500different brands”
![Page 45: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/45.jpg)
26/05/2019
#DTConf201845
BUT OUR EUROPEAN FUTURE IS NOT IN THE HANDS OF AMAZON OR ANYONE ELSE (UNLESS WE PUT IT THERE)
NZEB
Demand Response
Bundled Business Models – the focus is the service
![Page 46: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/46.jpg)
26/05/2019
#DTConf201846
EVOLUTION OF CERTIFICATION PROTOCOLS – TOWARD WELLNESS
https://www.egreenideas.com/resources/blog/well/
![Page 47: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/47.jpg)
26/05/2019
#DTConf201847
EVOLUTION OF CERTIFICATION PROTOCOLS – TOWARD CIRCULARITY
Prefabricated / ModularNZEB
Smart GridWellness
Circularity
Not futuristic concepts…
![Page 48: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/48.jpg)
Block III: H2020 Examples
Examples of European Research on
Digitalization in the Construction Sector to help mitigate
climate change, upskill construction workers and
increase sector productivity
![Page 49: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/49.jpg)
Energy performance gap view #1
The gap between actual energy
performance and design energy
performance can arise from:
- Design Errors
- Construction errors
- Commissioning errors
- the way buildings are actually
operated and used
The Performance Gap, Causes and Solutions, ARUP, Green Construction Board Buildings Working Group Final Report, 4 March 2013 available at www.greenconstructionboard.org.
![Page 50: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/50.jpg)
4 EU Projects working on these challenges
Some highlights
▪ BIM based knowledge management platform
▪ Use of scanners, drones, 3D recontruction and Augmented Reality on site
▪ AIR Pulse - Innovative air tightness measurement for envelope commissioning
▪ BIM for renovation and open source software as a way to stay at the cutting edge
![Page 51: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/51.jpg)
AIR Pulse
QUALITY ASSURANCE TESTING
• Track changes in airtightness throughout the build process, bringing
contractor accountability
• Reduce the risk of non-compliance, defects and the cost of remedy
• Give indication of build quality
![Page 52: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/52.jpg)
26/05/2019
#DTConf201852
DIGITAL MODELS
3D Point Cloud from Drone3D Point Cloud from
Google Tango
3D Point Cloud from HoloLens
3D Point Cloud from GoPro
OUTDOOR reconstruction INDOOR reconstruction
3D Point Cloud from 3D scanner or Matterport
3D Point Cloud from
3D scanner or
Matterport
3D Point Cloud from GoPro
3D SCANNING at R2M
![Page 53: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/53.jpg)
VIEW
~16m
HoloLens in action (video)
3D SCANNING – CASO STUDIO DI SAN SALVO
Video removed for file size –feel free to contact us
![Page 54: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/54.jpg)
Quick 3D scanning and modelsMatterport
Video removed for file size –feel free to contact us
![Page 55: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/55.jpg)
![Page 56: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/56.jpg)
Assess progress and quality
1
3
1
2
3
4
2
4
![Page 57: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/57.jpg)
Identify differences in time and with BIM
1
2
1-2
Video removed for file size –feel free to contact us
![Page 58: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/58.jpg)
Live difference with Augmented reality
![Page 59: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/59.jpg)
Assess progress and quality for outdoor with drone
![Page 60: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/60.jpg)
Assess progress and quality for outdoor with drone
Video removed for file size –feel free to contact us
![Page 61: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/61.jpg)
BIM based knowledge management platform
Architects Engineers Contractors Owners
![Page 62: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/62.jpg)
Building Life Cycle approach
Design Build Operate Transact
Design specification
archived in the BIM or the
Asset register
History of all submission and approval loops for each asset
Management of site minutes,
action lists and non-compliance
and delivery cycles
Definition of a maintenance plan
already scheduled in the delivery phase and ticketing for
reactive maintenance
Document and administrative
compliance supporting the purchase of the
property
![Page 63: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/63.jpg)
Seamless integration
Direct bi-directional connection between:
- Platform- BIM- 3D scan model- Reality (QR codes)
Project data available in IFC
formatApproval history Data sheets
PM inspections results
Testing documentsWarranty
documents
Commissioning documents
Scheduled maintenance plan
Management of events of
responsive maintenance
![Page 64: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/64.jpg)
Variety of customizable outputs
![Page 65: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/65.jpg)
MOBILE PRODUCTS
Onsite
Defect Management
QA/QC
Progress Management
For Field Teams OnsiteElevations
DimensionsElevation
2D Drawings
For Field Teams
Dimensions
3D Interface
For Field Teams
For Office Teams
![Page 66: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/66.jpg)
Key Features
Reviews
Forms
Offline
Google Maps
Mark up
Pin Locations
Photos
QR Codes /
Barcodes
ONSITE
![Page 67: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/67.jpg)
Use Cases
Work Inspection Requests
Defect Management
Void Inspections
Progress Monitoring
Non Compliance Reports
Commissioning Inspections
Planned Maintenance
Compliance
H&S Audits
ONSITE
![Page 68: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/68.jpg)
ONSITE – WORK INSPECTION REQUEST PROCESS
![Page 69: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/69.jpg)
ONSITE - REPORTING
Reports
WIR Live Report
90% Time Saving
Report Adapter
Any BI Tool
JSON/HTML/.XLS
![Page 70: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/70.jpg)
ONSITE – TASK MANAGEMENT
![Page 71: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/71.jpg)
ELEVATION
Version Control
Collaboration
Speed
Ease of Use
Change Control
Audit Trail
![Page 72: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/72.jpg)
ELEVATION
Mark up
Drop Pins
ShareRedline
Attach Photos
![Page 73: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/73.jpg)
Confidential
![Page 75: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/75.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Reducing the gap in energy
performance between design,
construction and use of buildings
This project has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant
agreement N° 680708.
BEMServer:
A new kind of energy management platform
![Page 76: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/76.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
The energy performance gap
The Actual energy consumption of buildings in Europe often exceeds design
energy predictions by a significant margin!
This gap between actual energy performance and design energy
performance can arise from:
- design constraints,
- construction errors,
- commissioning errors, and,
- the way buildings are actually used
![Page 77: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/77.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
What is BEMserver?
BEMServer was established by the H2020 HIT2GAP project to develop an
energy management platform which could eliminate this gap in existing
buildings, by providing:
- a data platform – collection and storage of data
- modelling – e.g. energy predictions, benchmarks
- modules – calculations, statistics and visualisation
![Page 78: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/78.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Simulation services
Platform for collecting and storing data
EnergyHVACPowerICT
EnvironmentWeather
Air qualityGIS
Information services
Perceptualisation services
PeoplePresenceBehaviour
Environment
Core modulesData processing and visualisation
Third party modulesData processing and
visualisation
Forecasting energy requirements & benchmarking
SMS text, e-mail generation, mobile phone
applications
Simple and detailed energy information dashboards
A quick illustration
![Page 79: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/79.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Core functionalities
Management
Visualisation
Connectivity
Data
processing &
statistics
temperatures
clockgraphs
emissions
![Page 80: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/80.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Who can benefit from BEMServer?
Owners of buildings
- plus decision-makers, managers of buildings,
energy-managers, estates managers, facility managers,
Users of buildings
ESCOs and financial institutions that promote a green economy where
energy saving pays for investments
Providers of technology, providers of advice
Organisations concerned with climate change
Suppliers of energy……..
![Page 81: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/81.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Who can benefit from BEMServer?
Companies working in the field of energy efficiency
Engineers: providers of BMS technology, ICT professionals,
maintenance staff
Research communities and clusters,
Other H2020 projects – e.g. BUILT2SPEC, MOEEBIUS, QUANTUM, TOPAs
Regional politicians & citizens’ representation bodies
Standardisation bodies and certifiers of technology
General public and the media.
![Page 82: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/82.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Visualisation
Visualisation is a key outcome:
Tools/modules to interrogate
processed data - tailored for
particular audiences: e.g.
- detailed information
for energy managers, but
- a simpler but engaging
presentation for public display.
H2G
temperatures
clock
graphs
emissio
ns
![Page 83: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/83.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Projects – proof of concept
Establish reference energy
performance, for a base year.
Gather data from energy bills related
to the base year.
Compare the designed (i.e. simulated)
and real energy performance of each
pilot
Survey user’s preferences
![Page 84: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/84.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Offices and laboratories, Nanogune
Offices & Laboratories,
Nanogune, San Sebastian,
Spain:
− PV panels
− BMS to control lighting and
HVAC
![Page 85: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/85.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: The Challenger Building
Challenger - Office building,
France
− PV panels & dual solar panels
− Ground source heat pump
− BMS controls lighting, HVAC,
hot & cold water & technical
alarms
![Page 86: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/86.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Headquarters of
Bouygues
Construction,
Guyancourt,
Paris
Pilot Project: The Challenger Building
![Page 87: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/87.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Challenger - Office building,
France
− solar panels
− Ground source heat pump
− BMS controls lighting,
HVAC, hot & cold water &
technical alarms
Pilot Project: The Challenger Building
![Page 88: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/88.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Town hall in Wilanów
Office building, Warsaw, Poland
− BMS controls lighting & HVAC
![Page 89: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/89.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Town hall in Wilanów
Ratusz w Wilanówie
![Page 90: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/90.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Town hall in Wilanów
Office building, Warsaw, Poland
− This slide was NOT used in the
presentation on 16 August 2016
![Page 91: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/91.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Alice Perry Engineering Building
Teaching and research
building, Ireland
− BMS controlling HVAC
− Lighting controls with lux
adjustment
− Uses district heating
network
![Page 92: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/92.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Project: Alice Perry Engineering Building
Teaching and research building, Ireland
− District heating
− Combined Heat & Power
− Biomass pellet boiler
− Night purging
− Heat exchangers
![Page 93: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/93.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Pilot Projects
The approach:
1. Establish an energy baseline by examining energy bills and information
from the HVAC
2. Decide which parts of the building should have BEMServer sensors
3. Survey user preferences and conduct energy simulations
4. Evaluate the gap between actual and theoretical energy use
5. Decide which parts of the building are going to have BEMServer
sensors
6. Implement a system of data collection
7. Evaluate the impact of the BEMServer system
![Page 94: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/94.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
A new kind of energy management platform
![Page 95: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/95.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
![Page 96: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/96.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Modules interaction through BEMServer API
![Page 97: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/97.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
EXAMPLE PROFILE
SITUATION
USECASE 1
John is a building manager working for
the Challenger building
He needs to check that the overall energy
consumption of the building is compliant with
expectations and that no deviation occurs.
Where a deviation does occur, he needs to
identify where the gap originates from.
![Page 98: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/98.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
“Energy Management
Module” selection
#1
Energy Management Module
![Page 99: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/99.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Selecting the building
to be checked
#2
Energy Management Module
![Page 100: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/100.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Launching the “Energy
performance” feature
#3
Energy Management Module
![Page 101: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/101.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Overall Energy
Consumption
verification
#4
Energy Management Module
![Page 102: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/102.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Choice of the EnPI to
be checked
#5
Energy Management Module
![Page 103: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/103.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Energy Per Area
Consumption
verification
#6
Energy Management Module
![Page 104: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/104.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Checking current year
energy distribution
then changing the
period
#7
Energy Management Module
![Page 105: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/105.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Comparison with last
year’s usages
#8
Energy Management Module
![Page 106: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/106.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Displaying the meters
consumption details
#9
Energy Management Module
![Page 107: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/107.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Raising an
”Improvement
Opportunity” against
the energy use
#10
Energy Management Module
![Page 108: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/108.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Creating the new
“Improvement
Opportunity”
#11
Energy Management Module
![Page 109: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/109.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Basic awareness
#12
Energy Management Module
4 %Save onenergy usage
![Page 110: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/110.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Raising the awareness
of building occupants
#13
Data visualisation module for building occupants
![Page 111: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/111.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Setting up the module
#14
Data visualisation module for building occupants
![Page 112: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/112.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
User interface for
each building
occupants
#15
Data visualisation module for building occupants
![Page 113: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/113.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Alerts / Tips
submodule
#16
Data visualisation module for building occupants
![Page 114: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/114.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Getting involved
BEMServer website at https://www.bemserver.org/
www.hit2gap.eu website has contact details and details
of forthcoming conferences and events plus
downloadable newsletters and flyers
A sister project, focusing on the design and construction
phases, can be seen at www.built2spec-project.eu
This project has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement N° 680708.
![Page 115: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/115.jpg)
#GM5 Bordeaux: 28 Feb – 1 March 2019
Project Partners
![Page 116: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/116.jpg)
This project has received funding from the H2020
programme under Grant Agreement No. 820773
General Presentation
![Page 117: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/117.jpg)
H2020 G.A. 820773
INTRODUCTION
Easy-to-use BIM tools and workflowsfor collaborative and energy-efficientrenovation of residential buildings
Coordinator: Nobatek/INEF4
Consortium: 23 partners from 10 European countries
Duration: 48 months
Start: 1st Oct 2018
Budget: 7M€
![Page 118: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/118.jpg)
H2020 G.A. 820773
CONSTRUCTION SECTOR LANDSCAPE
Existing buildings areresponsible for 40% of thetotal energy consumptionand 38% of GHG emissions
Presentation title + Location + Date 118
• Has a very low productivity• Has a very low use of digital tools
99.9% of the sector is made up of SMEs with less than 10 employees
We need to increase the renovation level ofthe existing building stock from 1% to 3% !
The construction sector:
We need to put adapted tools inthe hands of every kind ofconstruction actor.
Digital Transformation is noteasily accessible to SMEs andhandcrafters.
60% of the sector production is done by SME (less than 50 employees) while employing 70% of the sector working population (Eurostat 2011)
![Page 119: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/119.jpg)
H2020 G.A. 820773
BIM is both:
• A collaborative process involving the generation andmanagement of a digital representation of a building
• A semantically enriched model to describe a building, coveringits lifecycle.
It allows for a more efficient, collective and integrated designamong all stakeholders.
Presentation title + Location + Date 119
The BIM revolution needs to be available for all the construction value-chain.
BIM has strong potential to improve information management during a renovation and help overcome process fragmentation and communication
problems between stakeholders.
BIM AS A TRIGGER FOR THE DIGITAL REVOLUTION
![Page 120: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/120.jpg)
H2020 G.A. 820773 Presentation title + Location + Date 120
BIM4Ren 4 INNOVATION PILARS
BIM4Ren Tools & Digital EnvironmentWorkflows are backboned by a novel, state of the art, open and decentralized environment, and BIM solutions on data collection, data management and data driven design are integrated into it.
02
Digital Driven Workflows
Development of BIM based workflows dedicated to the renovation of residential buildings adapted to the complexity of targets of construction sector and put into a systematic and integrated workflows.
01 One Stop Access Platform
All the services are integrated altogether, accessible from a single
entry point granting access to all end users offering the most adequate
solutions to its needs and objectives.
03
Pilots as Living LabsProject pilots are used as a user-
centered, open-innovation ecosystem with co-creation, exploration,
experimentation and evaluation of the deployed tools.
04
![Page 121: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/121.jpg)
H2020 G.A. 820773
Data collection
WHAT IS THE EXISTING DATA ?
BIM4Ren CONCEPT
Year?
Local regulation?
Cost € ?
Energy performance?
Geometry?
Stakeholders expectations?
Type of occupants ?
Renovation potential ?
State of the existinginfrastructure ?
Data Management
Data- driven design
Stakeholders involved in the renovation
![Page 122: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/122.jpg)
H2020 G.A. 820773
Data collection
WHAT IS THE EXISTING DATA ?
BIM4Ren CONCEPT
Data Management
Data- driven design
Stakeholders involved in the renovation
1. To create the BIM model2. To organize, consolidate, secure3. To exploit the BIM model
Digital inputs
![Page 123: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/123.jpg)
H2020 G.A. 820773
Data collection
WHAT IS THE EXISTING DATA ?
BIM4Ren CONCEPT
Data Management
Data- driven design
Stakeholders involved in the renovation
Exploit BIM
1. To create the BIM model2. To organize, consolidate, secure3. To exploit the BIM model
Digital inputs
![Page 124: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/124.jpg)
H2020 G.A. 820773
BIM4Ren CONCEPT
BIM4REN ONE STOP ACCESS PLATFORM
Data collection
Data Management
Data- driven design
Stakeholders involved in the renovation
![Page 125: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/125.jpg)
H2020 G.A. 820773
BIM4Ren CONCEPT
![Page 126: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/126.jpg)
H2020 G.A. 820773
TO OFFER TOOLS :
• Articulated around Data collection / Data management / Data driven design• Making the most of the potential of BIM• Adapted to the size, to the capacity, to the ambition of the project
TO BUILD:
• A digital ready renovation workflow based on stakeholders elicitations• A novel, state of the art, open, decentralized environment
TO DEMONSTRATE AND IMPACT:
• Through pilots as living labs for user-centered, open innovation ecosystems• To contribute to standardization bodies as BuildingSmart• To train a new generation of workers to the use of BIM tools
BIM4Ren TECHNICAL OBJECTIVES
![Page 127: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/127.jpg)
H2020 G.A. 820773
Country Spain France Italy
Use Residential (private)Residential (social
housing)Residential (student
dormitory)Dwellings area per
building20 – 400 m² 14 – 4000 m² . - 2000 m²
Building ownerMulti owner private
propertyLOG || Private SHO Public organisation
Architect Contractor Contractor ATIGeneral construction
companyKURSSME
ContractorCMB Carpi
Large EnterpriseTechnical support TEC NBK R2M / GBCRenovation work Façade Energy renovation Full renovation
PILOTS AS LIVING LABS
![Page 128: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/128.jpg)
H2020 G.A. 820773
Sharing and exchanging complementary experiences, expertise and best practices can benefit the project and ensure that the technical developments will meet the needs of the sector.
STAKEHOLDER COMMUNITIES
![Page 129: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/129.jpg)
H2020 G.A. 820773
Ongoing Activities
• To be detailed by the presenter
![Page 130: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/130.jpg)
This project has received funding from the H2020
programme under Grant Agreement No. 820773
http://bim4ren.eu/
@bim4ren
THANK YOU
![Page 131: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/131.jpg)
RECAP
• A bit about R2M, where we fit in digitalization and construction, and how sustainability protocols andinnovative products are our market point of entry
• Construction today & tomorrow, productivity challenge and opportunity, use of digital technologies,upskilling building professionals, and requirements of future buildings and retrofits.
• Impressions from several EU projects where we are working on the energy performance gap,digitalization and construction site technologies across all phases of the building lifecycle
![Page 132: Digital Innovation in the Construction of Buildings · • Onyx Solar: Photovoltaic Glass (BIPV) R2M Solution 360 degree integrated solutions across all phases of construction (and](https://reader033.vdocuments.us/reader033/viewer/2022060313/5f0b57d17e708231d4300bd7/html5/thumbnails/132.jpg)
Thank you
www.r2msolution.com
T: +39 0382 1726596
Via F.lli Cuzio 42, 27100 Pavia, Italy
Thomas Messervey
CEO, R2M Solution