Design for Reliability Overview
![Page 2: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/2.jpg)
© 2009 Ops A La Carte 2
was named one of the top 10 fastest growing, privately-held companies in the Silicon Valley in 2006 by the San Jose Business Journal.
owns a private test lab in Santa Clara which specializes in accelerated reliability testing.
is a privately-held professional reliability engineering firm founded in 2001 and headquarted in Santa Clara, California with offices in China, India, Singapore, and UK.
Our CompanyOur Company
![Page 3: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/3.jpg)
© 2009 Ops A La Carte
3
Industry PenetrationIndustry PenetrationWe have over 500 customers across 70 different industries, including:
AEROSPACEAIRPORT SECURITYALTERNATIVE ENERGYARMED FORCESAUDIO AND VIDEOAUTOMATIONAUTOMOBILE/TRUCKING AUTOMOTIVE COMPONENTSBIOMEDICALCABLE INDUSTRYCHAMBER MANUFACTURERCOMPUTERSCONTRACT MANUFACTURINGCONTROL SYSTEMSDEFENSE ELECTRONICSDESIGN AUTOMATIONDESIGN FIRMSDISK DRIVESDISPLAY ELECTRONICSELECTRIC METERSELECTRIC UTILITY COMPANYELECTRIC VEHICLESELEVATOR COMPANIES
ENVIRONMENTAL TEST LABFAILURE ANALYSIS LABFOOD INDUSTRYGAMING INDUSTRYGENERATORSGOVERNMENT RESEARCHGPS INDUSTRYHANDHELD METERSKITCHEN APPLIANCESLASERSLEGAL INDUSTRYMEDICAL DEVICESMININGMOBILE PHONEMOTORS AND ENGINESNETWORK APPLIANCESNETWORK SECURITYNETWORKINGOIL EXPLORATIONOPTICAL COMPONENTSPCB MANUFACTURERSPERIPHERALSPOWER SUPPLIES
RADIO/RF/MICROWAVERECREATIONAL PRODUCTSRELAXATION/RECREATIONALRF COMPONENTSRFIDROBOTICS, MEDICALROBOTICS, SEMICONDUCTORSATELLITESEARCH ENGINESECURITY SYSTEMSSEMICONDUCTORSEMICONDUCTOR MFG EQUIPSOCIETIESSOLID STATE STORAGESPACE EXPLORATIONSTORAGE NETWORKINGTELECOMTEST & MEASUREMENTUNDERWATER ELECTRONICSUNIVERSITIESVETERINARYVISION SYSTEMSWATER PURIFICATIONWIRELESS
![Page 4: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/4.jpg)
© 2009 Ops A La Carte
4
2009 Specific Industry Focus2009 Specific Industry Focus
Currently, our top four industries are…
MedicalClean-TechOil and Gas
Defense/Aerospace
![Page 5: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/5.jpg)
© 2009 Ops A La Carte
5
Our Customers in Our Customers in N.AmericaN.America
![Page 6: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/6.jpg)
© 2009 Ops A La Carte
6
Our Consultants in Our Consultants in N.AmericaN.America
![Page 7: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/7.jpg)
© 2009 Ops A La Carte
7
{
Our Customers Around the Our Customers Around the WorldWorld
![Page 8: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/8.jpg)
© 2009 Ops A La Carte
8
Our Consultants Around the WorldOur Consultants Around the World
![Page 9: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/9.jpg)
© 2009 Ops A La Carte
9
Our Business ModelOur Business Model
We provide Reliability Solutions using:
•Consulting•Training
•Testing
![Page 10: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/10.jpg)
© 2009 Ops A La Carte
10
• Ops Solutions – Ops provides end-to-end solutions that target the corporate product reliability objectives • Ops Individual “A La Carte” Consulting – Ops identifies and solves the missing key ingredients needed for a fully integrated reliable product• Ops Training – Ops’ highly specialized leaders and experts in the industry train others in both standard and customized training seminars• Ops Testing – Ops’ state-of-the-artprovides comprehensive testing services
![Page 11: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/11.jpg)
© 2009 Ops A La Carte
11
assesses a company’s needs and then develops programs to match their needs, using Reliability IntegrationSM to tie the program together.
Consulting ServicesConsulting Services
![Page 12: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/12.jpg)
© 2009 Ops A La Carte
12
Reliability Training/EducationReliability Training/Education- Over 30 different seminars on reliability -
We Offer a Host of Training Courses in Areas of:
• DfX/DfSS Training• Certification Training• Customer Skill Gap Training• Customer Tailored Training• Quality/Manufacturing Training
![Page 13: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/13.jpg)
© 2009 Ops A La Carte
13
Testing ServicesTesting Services• Our own lab facility located in Northern California in the heart of
Silicon Valley. We provide HALT/HASS services on a world-wide basis, using partner labs for tests outside California.
• Second oldest HALT facility in the world, established in 1995(originally owned by QualMark)
• HALT equipment has all latest technology – only lab in region
• Highly-experienced staff with over 100 years of combined experience in HALT and HASS
• Tested over 500 products in over 30 different industries• Our HALT/HASS services are fully integrated with our other
consulting services.
![Page 14: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/14.jpg)
© 2009 Ops A La Carte
14
DESIGN DESIGN FORFOR
RELIABILITYRELIABILITY
![Page 15: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/15.jpg)
© 2009 Ops A La Carte
15
Reliability is no longer a separate activity performed by a distinct group within the organization.
Product reliability goals, concerns and activities are integrated into nearly every function and process of an organization.
Each organization must factor reliability into every decision in order to ensure produce a successful product.
The SituationThe Situation
![Page 16: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/16.jpg)
© 2009 Ops A La Carte
16
Engineering teams must balance cost, schedule, performance and reliability to achieve optimal
customer satisfaction.
The Balancing ActThe Balancing Act
Cost Schedule
Reliability
Performance
Customer Satisfaction
![Page 17: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/17.jpg)
© 2009 Ops A La Carte
17
The Solution is in the following 4 steps:
assess the customer’s situationdevelop goalswrite program planexecute program plan
All focused on developing reliable products and improving customer satisfaction.
The SolutionThe Solution
![Page 18: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/18.jpg)
© 2009 Ops A La Carte
18
Now
Goal
$ unreliability
$ Profits
Assessment
StatisticalData Analysis
Benchmarking
Gap Analysis
Program Plan
complaintsfieldfailures
satisfaction
marketshare
? Unknown ?
The SolutionThe Solution
![Page 19: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/19.jpg)
© 2009 Ops A La Carte
19
Customizing Your SolutionCustomizing Your Solution
You may need to address reliability in these areas:
• Organizational – These companies don’t know where to start, and for this, we start off with an Assessment, and use it to determine how to structure a reliability program.
• Product – These companies have a specific product level problem they need to resolve, from start to finish.
![Page 20: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/20.jpg)
© 2009 Ops A La Carte
20
Organizational Level Organizational Level Individual ServicesIndividual Services
![Page 21: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/21.jpg)
© 2009 Ops A La Carte
21
Solutions PackagesSolutions Packages• Once an organization identifies their corporate reliability objective,
we can choose one of our Solutions Packages to drive results with an end-to-end solution.
• We combine “best in class” industry approaches with a tailored selection of reliability techniques suitable for that organization.
Industry Proven Complete Solutions Value Priced
![Page 22: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/22.jpg)
© 2009 Ops A La Carte
22
Reliability Solutions PackagesReliability Solutions Packagesfor Product Developmentfor Product Development
Next Generation ProductsNew Product LinesProduct ExtensionsProduct RevisionsCritical Component Qualification
The R&D cycle for product creation and enhancement requires integration of key reliability activities across all phases of a program.
![Page 23: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/23.jpg)
© 2009 Ops A La Carte
23
Reliability Solutions PackagesReliability Solutions Packagesfor Product Manufacturingfor Product Manufacturing
Reliability Test Development Manufacturing Performance AssessmentsContract Manufacturer Reliability AuditsRoHS Conversions
As a product transitions to manufacturing, the reliability goals, models and test results become the basis for refining reliability screening, monitoring and reporting.
![Page 24: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/24.jpg)
© 2009 Ops A La Carte
24
Reliability Solutions PackagesReliability Solutions Packagesfor Field Reliability Improvementfor Field Reliability Improvement
First Year Reliability GrowthWarranty AnalysisComponent Obsolescence
Once the product transitions to customer shipments, field data must be monitored in order to drive reliability growth until the targeted reliability objectives can be achieved and sustained.
![Page 25: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/25.jpg)
© 2009 Ops A La Carte
25
Reliability Solutions PackagesReliability Solutions Packagesfor OEM/ODM Deliverablesfor OEM/ODM Deliverables
Test Plan DevelopmentReliability AuditsTest Performance Improvements
Ensuring thatOEMs/ODMs supply components that meet your reliability specifications is one of the keys to successful manufacturing.
![Page 26: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/26.jpg)
© 2009 Ops A La Carte
26
Product Level Product Level Individual ServicesIndividual Services
![Page 27: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/27.jpg)
© 2009 Ops A La Carte
27
Reliability Integration Reliability Integration ServicesServicesfor a Life Cycle Phasefor a Life Cycle Phase
The key to a good reliability program is encompassing reliability activities in each phase of the product life cycle:
Concept, Design, Prototype, Manufacturingand then integrating each of these activities together into a cohesive reliability program.
![Page 28: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/28.jpg)
© 2009 Ops A La Carte
28
Reliability Integration ServicesReliability Integration Servicesin the Concept Phasein the Concept Phase
Reliability Goal SettingBenchmarking & Gap AnalysisTechnology Risk AssessmentReliability Program Plan
Reliability Goal Settingand establishing a planto achieve the goals characterize this phase. Reliability goals are part business decision, part technology capability and part customer driven.
![Page 29: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/29.jpg)
© 2009 Ops A La Carte
29
Key to a reliable product is the many design decisions, and for each decision, designers balance reliability with cost, time-to-market and performance objectives.
Reliability IntegrationReliability Integrationin the Design Phasein the Design Phase
Reliability Models and Predictions (MTBF)Reliability Block Diagramming (RBD)Fault Tree Analysis (FTA)Failure Modes and Effects Analysis (FMEA)Thermal AnalysisDerating Analysis / Component SelectionTolerance / Worst Case AnalysisMaterial SelectionDesign of Experiments (DOE)Finite Element Analysis (FEA)Design for Six Sigma (DFSS)Dynamic Analysis (modal, shock, vibration)Sneak Circuit Analysis (hardware or software)Software ReliabilityWarranty PredictionsMaintainability/Preventive Maintenance AnalysisDesign Review and Retrospective Facilitation
![Page 30: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/30.jpg)
© 2009 Ops A La Carte
30
Discovering design weaknesses and verifying achievement of reliability goals becomes possible with prototypes.
Reliability IntegrationReliability Integrationin the Prototype Phasein the Prototype Phase
Reliability Test Plan DevelopmentHighly Accelerated Life Testing (HALT)Root Cause Failure AnalysisFracture and FatigueDesign Verification Testing (DVT)Environmental Testing and AnalysisPackage Design and TestingRegulatory Compliance Testing and CertificationTest Fixture Design and FabricationThermal Testing and AnalysisAccelerated Life Testing (ALT)Reliability Demonstration Testing (RDT)Closed-Loop Corrective Action Process Setup
HALT Chamber
![Page 31: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/31.jpg)
© 2009 Ops A La Carte
31
As the product transitions to manufacturing, the reliability goals, models and test results become the basis for refining reliability screening, monitoring and reporting.
Reliability IntegrationReliability Integrationin the Manufacturing Phasein the Manufacturing Phase
Highly Accelerated Stress Screening (HASS)On-Going Reliability Testing (ORT)Vendor Reliability Program AssessmentRepair Depot SetupField Failure Tracking System SetupWarranty Performance AnalysisReliability Performance ReportingEnd-of-Life AssessmentLessons Learned Process Establishment
HASS Chamber
![Page 32: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/32.jpg)
© 2009 Ops A La Carte
32
Reliability Integration forReliability Integration forSpecific Product TypesSpecific Product Types
-- SemiconductorsSemiconductors-- SoftwareSoftware
![Page 33: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/33.jpg)
© 2009 Ops A La Carte
33
Even at the Semiconductor Level, Reliabilitymust be considered in each phase of the Semiconductor Life Cycle.
Reliability IntegrationReliability Integrationfor Semiconductorsfor Semiconductors
Development PhaseBIR (Built In Reliability)DFR (Design For Reliability)DFT (Design For Testability)
Product Qual/Volume Prod. Ramping PhaseDevelop Reliability Qualification PlanDevelop HALT ProceduresDesign all h/w for Prod. Reliability QualsDirect the Reliability Qualification ProcessConduct Failure AnalysisDevelop Statistical Bin Limit Control
Product Maturity PhaseReview/Direct Ongoing Reliability MonitorsDirect Failure Analysis/Corrective ActionsPropose Design ChangesEvaluate proposed fab. process changes
![Page 34: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/34.jpg)
© 2009 Ops A La Carte
34
As with the Hardware, Reliability must be considered in each phase of the Software Life Cycle.
Reliability IntegrationReliability Integrationfor Software Developmentfor Software Development
Software Reliability Goal SettingSoftware Reliability Program PlanFacilitation of Team Design Template ReviewsFacilitation of Team Design ReviewsSoftware Failure AnalysisSoftware Fault ToleranceFacilitation of Code Reliability ReviewsSoftware Robustness Testing TechniquesSoftware Reliability Measurements & MetricsUsage Profile-based TestingSoftware Reliability Estimation TechniquesSoftware Reliability Demonstration Tests
![Page 35: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/35.jpg)
© 2009 Ops A La Carte
35
Reliability Integration forReliability Integration forSpecific IndustriesSpecific Industries
- Medical- Clean-Tech- Oil and Gas- Defense/Aerospace
![Page 36: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/36.jpg)
© 2009 Ops A La Carte
36
Reliability IntegrationReliability Integrationfor Medical Productsfor Medical Products
MISSION CRITICAL VALUES• We are committed to Highly ReliableSystems that save human lives• We successfully analyze and test criticalmedical products with confidence• We deliver accuracy and precision to extendproduct and human life for each application• We deliver customized solutions &consultancy to address all program risks
![Page 37: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/37.jpg)
© 2009 Ops A La Carte
37
Our Our MedicalMedical CustomersCustomersHere is a partial list of our
medical customers3M Corporation Abbott Diabetes Care Abbott Laboratories Accuray Inc. Advanced Bionics AeroGenApplied BiosystemsAubrey Group BD Biosciences Boston Scientific CardeonCardiac Assist Cardinal Health CarestreamCochlear CovidienFisher and PaykelHealthcareFlextronics MedicalFrezneus Medical Gatan
GE Healthcare Guava Technologies Guidant Hewlett-Packard HospiraInogenIntrapaceIntuitive Surgical IridexLifescanLumenisLuminetxM2 Medical Mako Surgical MasimoMedtronic Mission Medical NeoGuideNeoVistaNext Safety
OmniCellOrtho-Clinical DiagnosticsPerfint Healthcare DevicesPhilips Presym Inc. Proteus Biomedical Inc. PulmoneticRadiant Medical RespironicsSiemens StrykerSuni Medical SynecorTecan Systems Terumo Medical Corporation ThermageThoratecTriage Wireless, Inc. Tyco Healthcare Ventana Medical World Heart
![Page 38: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/38.jpg)
© 2009 Ops A La Carte
38
Reliability IntegrationReliability Integrationfor Clean Tech Productsfor Clean Tech Products
WHAT IS “GREEN RELIABILITY”• Today, the topic of Green is being discussedeverywhere. But what does it mean to be green?• “Going Green” has many implications from thematerials being used to the type of energy beingused and the quantity being consumed.• And each aspect of “Going Green” hasreliability implications.• Any time we change material properties, thereare inherent reliability risks we must address.
![Page 39: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/39.jpg)
© 2009 Ops A La Carte
39
Our Our CleanTechCleanTech CustomersCustomersHere is a partial list of our CleanTech customers
Armageddon EnergyArtificial MuscleBloom EnergyCamelbakCapstone TurbineCarmanahClipper WindpowerCooligyEchelonEnergy InnovationsGE IonicsGeneral HydrogenHelix WindpowerItronKonarka
National SemiconductorNuventixOptiSolarSan Diego Gas and ElectricSilver Springs NetworksSolar Electric SolutionsSolar JunctionSolFocusSunPowerSylvan SourceTelsa MotorsThompson TechnologyVisyxXandexXantrex
![Page 40: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/40.jpg)
© 2009 Ops A La Carte
40
Reliability IntegrationReliability Integrationfor Oil and Gas Productsfor Oil and Gas Products
MISSION CRITICAL VALUES• Committed to Highly Reliable Systems foroil exploration and production to ensureequipment, tool, and production availability.• Successfully design and test criticalproduction scenarios.• Deliver customized solutions & consultancyto address RCM requirements.
![Page 41: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/41.jpg)
© 2009 Ops A La Carte
41
Our Our Oil and GasOil and Gas CustomersCustomersHere is a partial list of our Oil and Gas customers
Baker Hughes INTEQBritish PetroleumChevronHalliburtonNOVOctioSchlumbergerWestern Geco
![Page 42: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/42.jpg)
© 2009 Ops A La Carte
42
Reliability IntegrationReliability Integrationfor Military Productsfor Military Products
MISSION CRITICAL VALUES• We are committed to Highly ReliableSystems that save human lives• We successfully design and test criticalmilitary scenarios with confidence• We deliver accuracy and precision to extendproduct life for each mission• We deliver customized solutions &consultancy to address Program RAM reqts.
![Page 43: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/43.jpg)
© 2009 Ops A La Carte
43
Our Our MilitaryMilitary CustomersCustomersHere is a partial list of our
Military customers
ArmyACSSApplied SignalBAEBoeingGeneral DynamicsHoneywell DefenseKaiser (now Rockwell)L-3 CommunicationsLockheed Martin
Marvin EngineeringNaval Undersea Warfare Center (NUWC)RaytheonRockwell CollinsSpace Systems LoralTeledyne ControlsThalesUnited Defense (now BAE)
![Page 44: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/44.jpg)
© 2009 Ops A La Carte
44
Design for Reliability is made up of the following 4 steps:
assess the customer’s situationdevelop goalswrite program planexecute program plan
All focused on developing reliable products and improving customer satisfaction.
SummarySummary
![Page 45: Design for Reliability](https://reader038.vdocuments.us/reader038/viewer/2022102710/549329afb4795975158b46bf/html5/thumbnails/45.jpg)
© 2009 Ops A La Carte
45
Ops A La Carte, LLCMike Silverman
Managing Partner(408) 472-3889
Contact InformationContact Information