Transcript
Page 1: Design 3 R1 - Mass.gov

345

Summit Access Road - 4.05 mi. (2.35 m.i up,13% average grade, 1.7 mi. down, 19% average grade)Entrance at the Park Visitor Center on Mountain Rd, (seasonally open to automobile use).

Sponsored by:

Top Related