Stretching Pavement Maintenance Dollars Through
Pavement Preservation
By R. Gary Hicks and Ding Cheng
CP2 Center, CSU, Chico for the
Fall Asphalt Pavement ConferenceOctober 24, 2013
![Page 2: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/2.jpg)
• Types of TreatmentsTypes of Treatments– Materials UsedMaterials Used– Design & Construction Design & Construction
ConsiderationsConsiderations– Causes of problemsCauses of problems
• Factors Affecting Factors Affecting PerformancePerformance
• Strategy Selection ProcessStrategy Selection Process
Most of this work has been supported by Caltrans
Overview of Presentation
2
![Page 3: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/3.jpg)
http://www.dot.ca.gov/hq/maint/MTA_GuideVolume1Flexible.html
3
![Page 4: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/4.jpg)
4
Co
nd
itio
n
Time
$1-3 for preventive
maintenance here
Costs $10-20 or more
when it’s done as rehab
Cost Effectiveness Pavement Preservation
![Page 5: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/5.jpg)
• Fog and Rejuvenating Fog and Rejuvenating SealsSeals
• Chip SealsChip Seals• Slurry SealsSlurry Seals• MicrosurfacingMicrosurfacing• Cape SealsCape Seals• Bonded Wearing CoursesBonded Wearing Courses• Thin HMA overlaysThin HMA overlays• CIR and HIRCIR and HIR
Types of Preservation Treatments
5
![Page 6: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/6.jpg)
• Purpose- enriches dry pavement Purpose- enriches dry pavement surfaces, reduces raveling, and surfaces, reduces raveling, and locks in chips on chip sealslocks in chips on chip seals
• Materials- generally diluted asphalt Materials- generally diluted asphalt emulsions or a specialty productemulsions or a specialty product
• Design considerations- application Design considerations- application rate a function of surface condition rate a function of surface condition
• Construction- applied using a Construction- applied using a distributor truck in diluted formdistributor truck in diluted form
• Expected life - 1 to 3 years or moreExpected life - 1 to 3 years or more
Fog and Rejuvenating Seals
6
![Page 7: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/7.jpg)
• Using excess emulsion for the Using excess emulsion for the existing pavement surfaceexisting pavement surface
• Placing in wet and/or cool weatherPlacing in wet and/or cool weather• Over or under dilutionOver or under dilution• Incompatible water for dilutionIncompatible water for dilution
7
![Page 8: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/8.jpg)
• Purpose- waterproof the existing Purpose- waterproof the existing surface and improve texture. Can surface and improve texture. Can also serve as an interlayeralso serve as an interlayer
• Materials- application of emulsions Materials- application of emulsions or hot binders followed by clean or hot binders followed by clean aggregate aggregate
• Design- application rates need to Design- application rates need to be determined be determined
• Construction-asphalt is applied Construction-asphalt is applied followed by an application of followed by an application of aggregate. May be used in multiple aggregate. May be used in multiple layerslayers
• Expected life- 5-7 years or moreExpected life- 5-7 years or more
8
![Page 9: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/9.jpg)
Sweeping (before and after)Sweeping (before and after)
RollingRollingAggregate Aggregate ApplicationApplication
Binder Binder ApplicationApplication
9
![Page 10: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/10.jpg)
• Improper surface preparationImproper surface preparation• Applying in cool and/or wet weatherApplying in cool and/or wet weather• Using dirty rockUsing dirty rock• Not accounting for new patches or flushed Not accounting for new patches or flushed
surfacessurfaces• Not taking traffic into accountNot taking traffic into account• Over spreading or under spreading binder or Over spreading or under spreading binder or
aggregate aggregate • Application on unsound pavementsApplication on unsound pavements
10
![Page 11: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/11.jpg)
Loose Chips
Bleeding Streaking
11
![Page 12: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/12.jpg)
• Chip seal with a polymer modified rejuvenating emulsion (PMRE)
• A scrub broom is used to push the emulsion into the cracks
• Rejuvenates as it seals the pavement surface
12
![Page 13: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/13.jpg)
13 13
![Page 14: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/14.jpg)
14
The size of wave is a function of the number and severity of cracks.
14
![Page 15: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/15.jpg)
Existing pavementExisting pavement
After emulsion After emulsion applied with the applied with the scrub broomscrub broom
15
![Page 16: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/16.jpg)
• Purpose- Seals minor cracks, restores Purpose- Seals minor cracks, restores surface texture, mitigates ravelingsurface texture, mitigates raveling
• Materials- a mixture of graded Materials- a mixture of graded aggregate, asphalt emulsion (generally aggregate, asphalt emulsion (generally polymer modified), and setting agentspolymer modified), and setting agents
• Design considerations- special mix Design considerations- special mix design is neededdesign is needed
• Construction-applied using a special Construction-applied using a special paver mounted on a truckpaver mounted on a truck
• Expected life- 5 to 7 years or more if Expected life- 5 to 7 years or more if placed on sound pavementsplaced on sound pavements
16
![Page 17: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/17.jpg)
SweepingSweeping Manhole CoveringManhole Covering
ApplicationApplication HandworkHandwork 17
![Page 18: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/18.jpg)
Type
I II III
Crack Filling
Fine Seal
General Seal
Medium-Textured Surface
Rough -Textured Surface
Parking Lots Residential
Streets
Airfield Runway
Urban Streets
Primary Highways
18
![Page 19: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/19.jpg)
• Improper surface preparation or Improper surface preparation or placing on unsound pavementsplacing on unsound pavements
• Place in cool and/or wet weatherPlace in cool and/or wet weather• Not requiring a mix design or Not requiring a mix design or
calibrating the equipmentcalibrating the equipment• Aggregate grading out, especially Aggregate grading out, especially
in fines contentin fines content• Too much or too little additiveToo much or too little additive• Improper maintenance of spreader Improper maintenance of spreader
box and dragbox and drag• Adding too much waterAdding too much water
19
![Page 20: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/20.jpg)
Unsound Pavement Unsound Pavement
Improper Surface Preparation Improper Mix design 20
![Page 21: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/21.jpg)
• Purpose- seal the surface, fill wheel ruts and minor Purpose- seal the surface, fill wheel ruts and minor surface irregularities, and can be placed at nightsurface irregularities, and can be placed at night
• Materials- a mixture of graded aggregates, polymer Materials- a mixture of graded aggregates, polymer modified emulsion, and set additivesmodified emulsion, and set additives
• Design considerations- requires a mix design to Design considerations- requires a mix design to determine the proportion of componentsdetermine the proportion of components
• Construction- applied using a special truck mounted Construction- applied using a special truck mounted mixing/paving machine. For long straight jobs a mixing/paving machine. For long straight jobs a continuous machine is recommendedcontinuous machine is recommended
• Expected life-last 8-12 years depending on the surface it Expected life-last 8-12 years depending on the surface it is applied toois applied too
21
![Page 22: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/22.jpg)
Continuous Machine
22
![Page 23: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/23.jpg)
Quick Traffic Cool Climates
Placed at Night
Interstates
Arterials
23
![Page 24: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/24.jpg)
• Improper surface preparation or placing on Improper surface preparation or placing on badly cracked pavementsbadly cracked pavements
• No mix designNo mix design• Construction in wet weatherConstruction in wet weather• Truck mounted equipment placing improper Truck mounted equipment placing improper
jointsjoints• Too much hand workToo much hand work• Too much overlap on jointsToo much overlap on joints• Too much water in the mix causing segregationToo much water in the mix causing segregation
24
![Page 25: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/25.jpg)
Placed on Unsound
Pavements
25
![Page 26: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/26.jpg)
• Purpose- seal the surface and provide a Purpose- seal the surface and provide a smooth hard wearing surfacesmooth hard wearing surface
• Materials- a chip seal followed by a slurry Materials- a chip seal followed by a slurry sealseal
• Design considerations- mix designs for Design considerations- mix designs for both productsboth products
• Construction- application of a chip seal Construction- application of a chip seal followed by a slurry sealfollowed by a slurry seal
• Expected life- 8-12 years or moreExpected life- 8-12 years or more
26
![Page 27: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/27.jpg)
Chip Seal Followed by a SlurryChip Seal Followed by a Slurry
Slurry
27
![Page 28: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/28.jpg)
Chip Seal
Slurry SealFinished Surface
28
![Page 29: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/29.jpg)
• Improper surface preparationImproper surface preparation• No mix designsNo mix designs• Applying in cool and/or wet Applying in cool and/or wet
weatherweather• Over application of binder in Over application of binder in
either courseeither course• Using conventional chip seal Using conventional chip seal
or polymer modified chip or polymer modified chip seals over cracked surfaces.seals over cracked surfaces.
29
![Page 30: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/30.jpg)
Thin Bonded Overlays
• Application of Application of polymer modified polymer modified binder immediately binder immediately followed by a thin hot followed by a thin hot mix overlaymix overlay
• Total thickness has Total thickness has been about 25 mmbeen about 25 mm
• Applied with a spray Applied with a spray paverpaver
30
![Page 31: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/31.jpg)
Thin HMA Overlays
• TypesTypes– ConventionalConventional
– Polymer modified Polymer modified asphaltasphalt
– Asphalt rubberAsphalt rubber
– Terminal BlendTerminal Blend
• Thickness 1-1.5 Thickness 1-1.5 inchinch
• Used with warm Used with warm mix additivesmix additives
31
![Page 32: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/32.jpg)
• Existing pavement Existing pavement conditioncondition
• Construction process Construction process and workmanshipand workmanship
• Materials quality and Materials quality and selectionselection
• Climate and TrafficClimate and Traffic
Factors Affecting the Performance of Pavement Preservation Treatments
32
![Page 33: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/33.jpg)
Treatment Life Reduction Percentage, % AverageStandard Deviation
Pretreatment Pavement ConditionFair 36% 18%Poor 64% 18%
Materials Selection and QualityMarginal 36% 22%
Poor 57% 20%
Construction and WorkmanshipMarginal 45% 21%
Poor 61% 21%
Mix and Structural DesignMarginal 35% 19%
Poor 57% 20%
Traffic LevelMedium 22% 22%
Poor 45% 25%
Climate during and immediately after construction
Marginal 33% 24%Poor 50% 24% 33
![Page 34: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/34.jpg)
34
![Page 35: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/35.jpg)
Strategy Selection Process
• Assess Pavement Conditions
• Determine Feasible Treatment Options
• Analyze and Compare Feasible Options
35
![Page 36: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/36.jpg)
User Interface – Main Page
36
![Page 37: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/37.jpg)
•Treatment Life•Treatment Cost•Interest Rate
Equivalent Annual Cost
37
![Page 38: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/38.jpg)
Advantage of the Preliminary Developed Expert System
• Uses Caltrans MTAG existing decision matrix
• Can deal with more complex scenarios
• Knowledge is retained to the system
• New treatments can be added
http://ceresearch.ecst.csuchico.edu/TreatmentSelection2.0/View/LoginPage.aspx
38
![Page 39: DengXin Cheng & Gary Hicks](https://reader035.vdocuments.us/reader035/viewer/2022062512/554a5478b4c905522f8b4af8/html5/thumbnails/39.jpg)
• Types of Surface TreatmentsTypes of Surface Treatments– Design and construction considerationsDesign and construction considerations– Expected performanceExpected performance– Causes of problemsCauses of problems
• Factors Affecting the Performance of Factors Affecting the Performance of Preservation Treatments-FHWA studyPreservation Treatments-FHWA study
• Strategy Selection Process Using Life Strategy Selection Process Using Life Cycle Cost Cycle Cost
39