Deepwater Deepwater district “North”district “North”
Of Arkhangelsk Of Arkhangelsk sea-portsea-port
The project has been approved by the Federal Agency of Sea and river transport of
the Ministry of transport of the RF
Russian transport passage “North sea route” in the system of international transport passages
The Ministry of regions of the RF has included the project of Arkhangelsk deepwater port
construction into elaborating conception of long-term socio-economic development of the Russian
Federation: “for provision including functioning of “the North sea route”
LAYOUT LAYOUT
of Deepwater district “Northern”of Deepwater district “Northern”
of Arkhangelsk sea-portof Arkhangelsk sea-port
Deepwater district “Northern” is planned to be arranged
in the north-eastern part of the Dry sea inlet in Dvinsky bay
•To build up-to-date deep-water freight zone of Arkhangelsk sea-port for processing approximately 28 mln. tons per year
•To provide acceptance of freight ships with dead-weight tonnage up to 75000 tons
•To form extra up to 9000 new workplaces in Arkhangels region
•To rise all-level budget incomings
Realization of the investment project will allow:
Freight zone consists of 4 independent pick-and-place complexes with general turnover of goods: 28 mln. tons per year
Port`sPort`s turnover of goods turnover of goods
Specialized containers pick-and-place complex (turnover of goods: 17,5 mln.
tons per year)
Specialized coal pick-and-place complex (turnover of
goods: 5,5 mln. tons per year)
Specialized bulk-oil cargos` pick-and-place complex (turnover of goods: 2,5 mln. tons per year)
Universal Complex
•Acceptance, mooring, download and upload of carriers
•Aceptance of cargos from adjacent types of transport
•Cargo dispatch by railway and auto -transport
•Conducting of export-import cargos customs control
Capital investments into construction of mooring hydrotechnical installations and
objects of coast infrastructure
Investment project realization is provided for on the basis of Investment project realization is provided for on the basis of public-private partnershippublic-private partnership
Name of Object Capital investments extent, in general (concerning each separate complex) (in thousands rubles)
Coal complex 3372965,4
Universal complex 4065563,8
Container complex 11431208,2
Bulk-oil complex 1866551,2
Subsidiary mooring line and port-fleet mooring line
549533,2
Access duct (dredging operations)
3964280,0
General volume of capital investments into construction of new district objects
25250101,8
Approximate terms of construction of immediate objects consist 44 months
Production activity of the complex : from the 4th quarter of the 2nd year,
Reach of total output: 3rd quarter of the 5th year
Investments payback period : 8,3 years
In connection with the construction and putting in operation first of all container terminal, export-import cargos composition is formed due to
container cargos
№ п/п
Cargo`s name Import
Volume, mln. of tons
Notes
2010-11 2015-16 2025-26
1 Containers 10,0 18,0 19,5 From America, Norway, GB, China to the RF
total 10,0 18,0 19,5
Volume of traffic on functioning auto and railway Volume of traffic on functioning auto and railway Arkhangelsk-Central Russia main linesArkhangelsk-Central Russia main lines
Volume of traffic on railway main line Volume of traffic on railway main line
Solikamsk- Gainy – Syktyvkar- Arkhangelsk (“BELKOMUR”) Solikamsk- Gainy – Syktyvkar- Arkhangelsk (“BELKOMUR”)
Railway main line construction project
Solikamsk- Gainy – Syktyvkar- Arkhangelsk
(BELKOMUR)
Project “BELKOMUR” is a part of the “Strategy of development of Russian railway transport up to 2030”
Freighting routes on sectors of railway direction “BELKOMUR” (Arkhangelsk - Syktyvkar- Solikamsk)
Mln. Tkm/km
Identification marks:
- Present railway lines
-Projecting railway
direction “BELKOMUR”
Total cargo
Total cargo
Socio-economic effect
• Independent departure of large-capacity ships to any foreign port all the world around
•Activation of North-East region of European part of Russia
•Considerable rise of investment attraction of Arkhangelsk region
•Annual tax assessments (only from the very new port activity) into the federal budget – approxim. 400 mln. Rubles, into the regional budget – approxim. 800 mln. Rubles
•To form extra up to 9000 new workplaces in Arkhangels region:
1500 of them are in new port and approximately 7500 workplaces in port-adjacent infrastructural objects
Project management
Management Company
Limited Company “Deepwater region “Northern” of Arkhangelsk
commercial port ”
Project initiators:
Arkhangelsk region administration
Contact information
Official Position Contact information
A. Z. Tagurov General manager of management company Co Ltd “Deepwater district “Northern” of Arkhangelsk commercial port ”
tel./ fax.: +7(499) 192-92-65e-mail: [email protected]
S. Y. Ustinov Executive director of management company Co Ltd “Deepwater district “Northern” of Arkhangelsk commercial port ”
tel./ fax.: +7(495) 608-99-84e-mail: [email protected]