PLAN & READINESS OF PLNTO EXPLOIT OR TO PURCHASE
BIOMASS BASED ELECTRICITY
Mochamad SofyanHead of New & Renewable Energy Division
INDONESIA GERMAN WORKSHOPInstitut Teknologi Bandung
Bandung , 26th of September 2011
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
2/21
AGENDA
.
AGENDA
CONCLUSION
GENERAL POLI Y.
B. THE UTILISATION OF BIOMASS TO GENERATE ELECTRICITY
2
AGENDA
2
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
3/21
Gas
Geothermal
Hydro
LNG
HSD MFO
Coal
General Policy: Conservation and Diversification of primary Energy by utilization of renewable energy
President Decree no 5/2006, contribution of renewable energy by 2025 : 17%.
PERMEN ESDM (Regulation of Ministry of Energy and Mineral Resources) no 31/2009
concerning energy price and obligation of PLN to purchase an electricity generated from
small scale renewable energy ( under 10 MW ).
PLN Plan and Policy ( RUPTL 2010 -2019 ): The growth of electricity demand by 9,2 % annually which supplied by various energy
resources
Electrification ratio grows from 68 % in 2010 to be 91 % by 2019.
The program to reduce oil consumption from 19 % to 3 % by 2015.
With the dominant of coal power plant development (58 %), the contribution of renewable
energy will increase from 12 % ( 2010 ) to be 19 % ( 2019 ).
The utillisation of biomass energy has been planned in the RUPTL ( general plan for
electricity supply).
PLN considered not to have biomass power plant, but treated as an Excess Power or IPP
power plant , due to feedstock supply issues.3
Policy on Energy Development
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
4/21
Indonesia Energy Policies to Reduce GHG emission
Presidential Decree No 5/2006 regarding National Energy Policy
Presidential Decree No. 4/2010 that assigns PLN to accelerate development of powergeneration plants using renewable energy, coal and gas. The renewable energy portion is
40% of the total capacity listed in this program
Oil
20 %
Oil
20 %
Gas 30 %Gas 30 %
Coal 33 %
N&RE
17 %
Bio-fuel 5 %
Geothermal 5 %
Biomass, Nuclear,
Hydro, Solar Power,
Wind Power 5 %
Coal Liquefaction 2 %
Target of National Energy Mix 2025
(Based on Presidential Regulation No. 5/2006)
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
5/21
Planning Policy
5
Policy for Generation Expansion Planning
Reserve margin for power systems outside Java-Bali is allowed to be higherthan 40% to accommodate uncertainties in the completion of power plant
projects.
Site location for new power plant is determined by taking into account the
availability of local primary energy sources and considering the regional
balance principle to minimise investment of transmissions.
Development of renewable energy, especially geothermal, is not decided by
least-cost principle, but by considering its expected development period.
Fuel-oil power plants are only planned to meet peak demand, and other type
of peaking plants such as pumped storage hydro plants, reservoir hydro plants
and gas-fired turbine power plants are also planned.
The development of electricity supply in remote areas, the borders islands
and other outer islands, especially in the eastern part of Indonesian
archipelago, would be prioritized to utilize locally available renewable energy
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
6/21
Realisation and Projection of Electricity Demand 2010-2019 (GWh)
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Realization Projection
Indonesia electricity demand is predicted to grow at average of 9.2% annually (Java-Bali 8.97%,
West Indonesia 10.2% dan East Indonesia 10.6%)
327
TWh
252
TWh
54 TWh
28 TWh
133
TWh
104
TWh20 TWh
10 TWh
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
7/21
7
Renewable Energy ( RE ) Development Target( RUPTL PLN 2010-2019)
Development Program( up to 2019 ):
Hydro :
Additional Cap: 5.990 MW
Geothermal :
Addtional Cap: 5.550 MW
Others Small scale RE:
Additional Cap: 1.700 MW
( Including Biomass : 374 MW )
PLN will focus mainly on mini
hydro , solar and biomassdevelopment.
6% 6% 5% 5% 5% 4% 4% 4% 4% 4%
6% 6% 6% 9%
12% 13% 13% 13% 13% 13%
46%
54% 52% 51%
51% 54% 56%
57% 56% 58%
25%
25% 28%29%
26% 24% 22% 19% 20%
18%
0%
0%
3%2% 2% 2% 2% 3% 4% 4%
3%
3%2.0%
1% 0% 0% 0% 0% 0% 0%
13%
7% 4.8% 3% 3% 2% 2% 2% 2% 2%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2010 2011 2012 2013 2014 20 15 2016 2017 20 18 2019
Hydro Geothermal Nuklir Batubara Gas LNG MFO HSD Pumped Storage
RE contribution on National Energy Fuel Mixedi will increased from 12 % (2010) to 19 %, Coal
Thermal still dominant by 58 % ( 2019 )
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
8/21
AGENDA
.
AGENDA
PENUTUP
GENERAL POLI Y AND POTENTIAL RESOUR ES.
B. RE DEVELOPMENT PLAN AND THE UTILISATION OF BIOMASS
AGENDA
8
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
9/21
ADDITIONAL PLANT CAPACITYCAPACITY
(INCL. GREEN & NEW ENERGYDEVELOPMENT)
Total Capacity of Green & New Energy PP to be built in the period is 11,540 MW(total capacity of Geothermal PPs, Hydro Electric PPs-HEPP, Mini HEPPs, and Small
Scale Green & New Energy PP)
57% of the total capacity of Green Energy PP will be expected from IPPs
Tahun 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Total
PLN
Coal STPP 3,291 4,090 834 1,479 2,203 110 1,200 200 7 3,007 16,421
Comb. Cy. PP 194 820 393 350 240 - 700 1,500 2,250 - 6,447Gas TPP 105 - 225 50 - 65 235 800 1,065 1,280 3,825
Diesel PP 11 14 12 48 44 42 34 16 33 50 303
Geo. PP 10 55 78 143 203 20 23 3 20 20 575
Mini HEPP 14 6 6 14 8 4 5 8 1 - 66
HEPP - - 10 300 1,000 65 103 715 1,311 818 4,321
Total PLN 3,625 4,985 1,558 2,384 3,698 306 2,299 3,242 4,686 5,175 31,958
IPP -
Coal STPP 26 891 2,649 1,703 2,212 2,160 2,550 1,930 1,410 745 16,276
Comb. Cy. PP 290 110 30 - 120 - - - - - 550
Gas TPP 10 10 80 - - - - - - - 100
Diesel PP - 22 - - - - - - - - 22
Geo. PP - 3 178 857 2,450 50 330 392 510 645 5,415
Mini HEPP 25 31 91 42 6 2 1 1 1 - 201
HEPP 180 195 - - 157 90 310 30 - - 962
Total IPP 531 1,262 3,028 2,601 4,945 2,302 3,191 2,353 1,921 1,390 23,525
PLN+IPP
Coal STPP 3,317 4,981 3,483 3,182 4,415 2,270 3,750 2,130 1,417 3,752 32,697
Comb. Cy. PP 484 930 423 350 360 - 700 1,500 2,250 - 6,997
Gas TPP 115 10 305 50 - 65 235 800 1,065 1,280 3,925
Diesel PP 11 36 12 48 44 42 34 16 33 50 325
Geo. PP 10 58 256 1,000 2,653 70 353 395 530 665 5,990
Mini-Hydro PP 39 38 98 56 13 6 6 9 2 - 267
Hydro Electric PP 180 195 10 300 1,157 155 413 745 1,311 818 5,283
Total PLN+IPP 4,156 6,248 4,586 4,985 8,643 2,608 5,490 5,596 6,607 6,565 55,484
SMALL SCALE
GREEN & NEW
ENERGY PP
58 57 90 155 191 208 217 222 242 263 1,703
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
10/21
SMALL SCALE RE DEVELOPMENT PLAN
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 TOTAL1 PLTMH MW 0
2 PLT Surya MWp 2 5 5 10 15 30 30 30 30 30 187
3 PLT Bayu MW 0 5 5 8 8 8 10 10 10 10 74
4 PLT Biomass MW 4 10 10 10 10 25 25 25 25 40 184
5 PLT Kelautan MW 0.0 0.0 0.2 0.3 0.5 1.0 1.5 2.0 2.0 2.5 10
6 PLT Bio-Fuel MW 0.0 0.5 2 2 2 3 5 5 10 10 40
7 PLT Gas-Batubara MW 12 15 15 15 15 25 25 25 30 30 207
MW 18 36 37 45 51 92 97 97 107 123 702
( RUPTL TAHUN 2010 - 2019 )
No Pembangkit - EBT StnTAHUN
PENGEMBANGAN PEMBANGKIT LISTRIK EBT - ENERGI ALTERNATIF
TOTAL
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 TOTAL
1 PLTMH MW
2 PLT Surya MWp 20 40 50 60 70 70 75 75 80 80 620
3 PLT Angin MW 5 15 15 15 15 15 20 20 25 25 170
4 PLT Biomass MW 16 33 35 35 35 40 40 45 45 50 374
5 PLT Kelautan MW - - 0 0 1 1 2 2 2 3 10
6 PLT Bio-Fuel MW - 1 2 2 2 3 5 5 10 10 40
7 PLT Gas-Batubara MW 12 56 60 80 80 90 90 95 95 100 758
MW 53 145 162 192 203 219 232 242 257 268 1,972TOTAL
PENGEMBANGAN PEMBANGKIT LISTRIK EBT - ENERGI ALTERNATIF( USULAN REVISI RUPTL TAHUN 2011 - 2020 )
No Pembangkit - EBT StnTAHUN
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
11/21
PALM WASTE BIOMASS POTENTIAL ( MW )
( State Own Plantation Company)
Sahabat Setia untuk Kemajuan11
2010 2011 2012 2013 2014
1 PTPN I 0.59 0.16 0.16 0.05 0.13
2 PTPN II 9.49 8.37 5.64 4.45 3.51
3 PTPN III 13.26 13.65 14.06 14.48 14.92
4 PTPN IV 11.54 14.98 12.84 16.05 16.05
5 PTPN V 21.86 18.59 17.11 14.49 13.29
6 PTPN VI 14.33 16.49 16.41 16.24 15.85
7 PTPN VII 3.91 3.56 2.71 2.24 2.24
8 PTPN VIII 0.62 0.75 0.75 0.75 0.75
9 PTPN XIII 3.09 3.34 3.66 3.92 4.32
10 PTPN XIV 1.82 2.24 2.65 2.90 2.90
11 RNI 4.83 5.24 5.37 5.74 6.5812 Jumlah 85.34 87.38 81.38 81.32 80.55
13 Tot.Inti+Plasma+Phk I II 249.10 265.23 268.25 285.24 287.19
Proyeksi Besarnya Daya (MW) BUMN Perkebunan 2009-2014
No UraianAsumsi (MW) - Rata rata
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
12/21
MSW (PLTSampah) Potential (Proposed by Developers)
12
No Lokasi MW
1 Bekasi, Bantargebang 26
2 Bandung 10
3 Surabaya, Benowo 10
4 Bali, Suwung 9
Total 55
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
13/21
The Current Biomass Power Plant Contracted with PLN ( 38 MW )
No Nama Perusahaan Nama Pembangkit COD Jenis kontrak Lokasi Biomass
Type
Kapasitas
Kontrak
(MW)
Harga
Rp/KWh
1 PT Listrindo Kencana PLTBiomassa
Listrindo Kencana
2006 IPP Bangka Palm waste 5
766
2 PT Growth Sumatra PLTBiomassa
Growth Sumatra 1
2006 Excess power Sumatera
Utara
Palm waste 6 785.4
3 PT Navigat Organic PLTSampah
Suwung
2008 Excess power Bali MSW 2
800
4 PT Navigat Organic PLTSampah Bantar
Gebang
2009 Excess power Bekasi MSW 4
800
5 PT Belitung Energy PLTBiomassa
Belitung Energy
2010 IPP Belitung Palm waste 7
787
6 PT Growth Sumatra PLTBiomassa
Growth Sumatra 2
2010 Excess power Sumatera
Utara
Palm waste 9 785.4
7 PT Pelita Agung PLTBiomassaDumai
2010 Excess power Riau Palm waste 5 787
13
Data Perusahaan Penjual Tenaga Listrik dari Biomassakepada PT.PLN (Persero)
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
14/21
Biomass Power Plant in Progress of Contract with PLN
( 21 MW )
1 PT Victorindo PLTBiomassa
Padang Lawas
2011
progress
Excess
power
Sumatera
Utara
Palm
waste
5 787
2 PT Nubika Jaya PLTBiomassa
Pinang
2011
progress
Excess
power
Sumatera
Utara
Palm
waste
6 787.2
3 PT Growth Asia PLTBiomassa
Growth
Sumatra 3
2011
progress
Excess
power
Sumatera
Utara
Palm
waste
10 787.2
14
No Nama Perusahaan Nama Pembangkit COD Jenis kontrak Lokasi Biomass
Type
Kapasitas
Kontrak
(MW)
Harga Rp/KWh
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
15/21
15
Key Challenges / Constraints
1.
Legal aspect / regulation :
Permits
Pricing
Contract
2.Uncertainty on long term fuel supply of biomass feed stock
Continuity of long term supply
3.
Lending Aspect
Contract for Excess Power limited to 3 year
Uncertainties on long term fuel / feed price
4. Environmental and Social Aspect
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
16/21
16
Regulation for Feed-in Tariffs ( FIT )
MoEMR Decree 31/2009:
For RE with 10 MW Maximum installed capacity
Tariff is set as: - 7 c USD /kWh (connected to medium voltage line)
- 10.8 c USD /kwh (connected to low voltage line)
- Incentive factor of 1.1 1.5 for outside Java-Bali
Tariff higher than setting tariff : B to B mechanism and subject to GOI
approval
MoEMR Decree 32/2009 :
Ceiling tariff set as 9.7 c USD/kWh for Geothermal
Propossed FIT for Biomass :Estimated Tariff propossed: 10 11 cent USD/kwh
Incentive factor based on region
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
17/21
The Barriers of Biomass Energy Development
There is no standard price of biomass fuel. The price tends tofollows oil price issue.
The continuity of supply is questionable as the feedstock producer
tend to export their product ( esp. Palm waste) for higher offer.
Feedstock producer do not want to be tightened with long term
contract .
The lack of interest of farmers to plant energy crops due to Income
from growing energy crops may not be competitive than growing
other crops.
Unpredictable crops failure that lead to uncertain financial return
for farmers.
High capital cost of advanced biomass technology
Social objection for MSW power plant17
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
18/21
Opportunities of Biomass Energy Developers
Unlike in Sumatra and Kalimantan, there are only a few biomass
plant developers in Eastern Indonesia. These provide opportunities
for new players to invest.
Low electrification ratio by less than 60% in Eastern Indonesia
presents interesting chance for developers. There will be new Feed in Tarif for electricity generated from
biomass, which is around 10 11 cent USD/ kWh.
The risk of sustainability of feedstock supply can be minimized
with the availability of various type of biomass
Availability of unproductive land that can be utilize as a cultivatedwood for wood pellets.
18
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
19/21
AGENDA
.
AGENDA
CONCLUSION
GENERAL POLICY AND POTENTIAL RESOURCES.
B. THE UTILISATION OF BIOMASS TO GENERATE ELECTRICITY
AGENDA
19
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
20/21
CONCLUSION
As the electricity demand growing rapidly, PLN is ready to
purchase electricity generated from Biomass.
Considering that the average selling electricity price to
customers is Rp 700,00 per kWh, the new proposed base
Feed in Tariff for biomass energy by Rp 950,- is sufficient
to provide profit for energy developers as well as to avoid
subsidy burden for government.
The export of raw materials biomass should be limited by
introducing the fiscal policy to stabilize domestic price.
Financial incentive is required by all stake holders in order
to accelerate the biomass plant growth.
20
-
8/14/2019 d1 04 Plan Readiness of Pln to Exploit or to Purchase Biomass e28093 Based Electricity Moch Sofyan
21/21
21
erima Kasiherima Kasih