Download - CV Javanshir Najafov
Page 1 of 12
Curriculum Vitae – Javanshir Najafov
_______________________________________________________________________________________________ Address : Dadashev str 74 app 48 Baku/Azerbaijan E-mail : [email protected] LINKEDIN : https://www.linkedin.com/in/javanshir-najafov-81660019?trk=hp-identity-name Mob.: +994772771424 A. CAREER OBJECTIVE : Results-driven Manager with over 15 years of expertise as a PROJECTS/OPERATIONS/PLANT Manager for hundred million dollars in OIL&GAS SECTOR, NON-OIL&GAS SECTOR, INDUSTRIAL BUILDINGS (feasibility / fabrication/installation/commissioning/handover). History of concurrently directing multiple and multicultural projects to successful completion through effective management and team collaboration(Managing on peak time till 1000 men) . Continually strives to ensure high quality while adhering to a tight schedule and budget. Advanced understanding of customer needs with diligent attention to detail results in superior customer service and high levels of client satisfaction. Experience working on projects ranging from $120K to $350 M
LOOKING FOR NEW OPPORTUNITY IN PROJECT/OPERATIONS/PLANT MANAGEMENT
B. SKILLS Project Management
EPC Projects Brown Field Projects Multiple projects Change management Motivating staff Infrastructure projects Managing stakeholder’ s Prince 2 Practitioner Project planning Contract administration Performance Management
Professional
Onshore/Offshore Construction
Civil Works Identifying key issues Estimating Costs Budgetary Control Commercial awareness Information gathering Coaching staff Recruitment Feasibility/ Tendering Quality and HSE
management
Personality
Strategic thinking Multilingual Conflict resolution Problem solving Analytical mind High levels of integrity Negotiating skills IT Skills (MS Project ,
Autocad,Prima Vera , Vizion, SAP etc)
Leadership Skills
Page 2 of 12
____________________________________________________________________________________________
C. ACHIEVEMENTS
o Created and presented an excellent image of the company and its services to customers o Was awarded Certificate of Excellence for my performance o Organized and implemented and efficient work flow system that resulted in significant cost savings. o HSE and Quality system establishment o Increased productivity by work flow optimization o British Petroleum President ‘s (Azerbaijan) Award o Organized and implemented an efficient work flow system that resulted in significant cost savings.
_______________________________________________________________________________________________
E. ACADEMIC QUALIFICATION AZERBAIJAN TECHNICAL UNIVERSITY 1978-1983 FACULTY : ROBOTS AND ROBOTIC SYSTEM/MACHINE BUILDING DEGREE : MECHANICAL ENGINEER POST GRADUATE : CYBERNETICS INSTITUTE 1993-1997 SPECIALITY : COMPITER AIDED DESIGN&COMPUTER AIDED MANUFACTURE (CAD/CAM SYSTEMS) DEGREE : CANDIDATE OF TECHNICAL SCIENCE, PH.D F. LANGUAGE SKILLS Azeri (Native) Russian (Native) Turkish (Native) English (Fluent) G. COMPUTER SKILLS Advanced User of MS Office (Excel/Word on professional Level) MS Project (professionally) PrimaVera /Autocad/Vision etc H. INVENTIONS and PUBLICATIONS 14 scientific articles (Subjects :Construction, CAD/CAM) and inventions
Page 3 of 12
I. TRAINING and AWARDS Baku, ICALS (International Certified Advanced Leadership Skills & Coaching) – 13-19 Sep , 2015/Leoron , CPA Istanbul ,Senior Internationa Project Manager ASIPM and IABFM Aberdeen, Consafe Training Centre / Planning and Management Courses Azerbaijan BP President’s HSE Award Baku ,Advance Safety Auditing (ASA) Training Course(AMEC) Baku, “First Step” safe behavior Training Course(AMEC) Baku ,Awarded with “Silver” Star within bp “FIVE STARS” program(BP) Baku,Accident/Incident Investigation Course(BP) Baku, Buisness Training Group, Financial Management for Non-Financiers course
References :
Martin Trench – AMEC Construction Manager e-mail: [email protected] -----------------------------------------------------------------------
Tolga Kucukavsar – ATA (Amec-Tekfen-Azfen) Construction Manager e-mail: [email protected] Mob: +99450 201 90 66 Ismail Mamedov – MQS LLC (www.mqs.az) General Manager Mob: +994502147734 e-mail: [email protected]
CAREEAR HISTORY
NORM LLC (www.norm.az)
Position : Construction Projects/Operations Manager 2008-Present
SCOPE OF WORK – Feasibility,Tendering and Fabrication,Construction of New Cement Plant (5000 tpd clinker)/Green Field Project- EPC ---326 mln USD
Page 4 of 12
BETEKO LLC (www.beteko.az )& MQS LLC ( www.mqs.az )
Position : Technical Director/Operations Manager 2006-2008
AZFEN J.V.- TEKFEN- AMEC (ATA) Consortium 1999-2006 (www.azfen.cm/www.tekfen.com.tr/www.amec.com)
Positions : FABRICATION PROJECTs MANAGER /PROJECTS MANAGER/FABRICATIONS PLANT MANAGER Client : British Petroleum
PROJECT : Process Compressor Water Injection & Utility (PCWU) SCOPE OF WORK - Fabrication & Commissioning of the process, gas compression, water injection and utilities (PCWU) Top Side Platform (16 000 t) for Central Azeri offshore Platform. (Baku/Azerbaijan)
PROJECT :Fabrication and Assembly of VENT TOWER
SCOPE OF WORK - Fabrication & Assembly of the VENT TOWER (330 tonne) for TPG 500 Platform (Baku/Azerbaijan)
PROJECT: CA - CWP Yard Upgrade Work
SCOPE OF WORK Existing site upgrade work : earthwork, soil improvement, concrete work, piling, welding, prefabricated buildings erection, NDE and other civil activities.
PROJECT : BP Call-off Project SCOPE OF WORK : Feasibility, Fabrication, Installation and Commissioning work for all BP objects in Azerbaijan (PipiLines WREP,NREP, Sangachal Oil Terminal, Pump Stations in Georgia and Azerbaijan , Chirag -1 Offshore Oil Platform and other works )
PROJECT: Sangachal Onshore Terminal Expansion Project
SCOPE OF WORK: Provision of Civil & Mechnical works for Sangachal Terminal expansion
PROJECT: TMI-2 Barge Modification Project
SCOPE OF WORK : Fabrication and Installation of Seafastening on the TMI-2 Barge. Provision Fabrication
SCOPE OF WORK – Feasibility ,Fabrication ,Construction , Installation,Civil Works, Commissioning of Telecommunication Towers ,Industrial Buildings ,Optic Cabel Laying etc---- 20 mln USD
Page 5 of 12
CONSAFE (SCOTLAND/Aberdeen) LLC 1997-1999
PROJECT: Shelf 5 Rig Upgrade Client : British Petroleum (BP) Position: Planning Engineer
AZERBAICAN TECHNICAL UNIVERSITY 1987-1997
Position: Chief of CAD/CAM laboratory Senior Teacher Deputy of Chairman Machine-Building FACTORY ,”NORD” 1983 - 1987 Position : Mechanical Engineer
Page 6 of 12
Page 7 of 12
Page 8 of 12
Page 9 of 12
-
Page 10 of 12
Page 11 of 12
Page 12 of 12