EDUCATION
Diploma in Civil Engineering from Faculty of Engineering of
University of Porto, Portugal, in 2006, including one Erasmus
semester in 2005-2006 at the ENPC – École Nationale des Ponts
et Chaussées, Paris, France
CURRENT JOB POSITION
Partner and Project Manager at “ADAO DA FONSECA –
Engenheiros Consultores, Lda.” (AdF) - www.adfconsultores.com
PROFESSIONAL ASSOCIATIONS
Chartered Civil Engineer in “Ordem dos Engenheiros”, with
registration nº 59915
LANGUAGES
Portuguese (native)
English (professional working proficiency)
Spanish (professional working proficiency)
French (limited working proficiency)
PROFESSIONAL MOST IMPORTANT DATA
Structural designer of bridges and outstanding buildings in AdF
(2006-2008 and from 2010) and in IDEAM – www.ideam.es (2008-
2010).
Since 2014, as Project Manager at AdF, João Adão da Fonseca
became also responsible for business development for some
countries of Africa and South America.
João Adão da Fonseca is partner at AdF since 2017.
MOST RELEVANT PROJECTS
MOST RELEVANT BUILDINGS
Cinnamon Life Complex, Colombo, Sri Lanka – integrating two
residential towers of 47 stories, one office tower of 33 stories, one
hotel with 900 rooms, one exhibition centre, one retail park and
parking for about 3.000 cars, adding up to a total construction
area of more than 400.000 m2 – structural engineer in AdF team
of Structural Engineer/Architect/Designer Cecil Balmond of
Balmond Studio (under construction).
International Airport of Santiago de Chile, Chile – Detail design of
the facades of the Airport. More than 20.000 m2 of facades
located in one of the most seismic world's regions. The steel
structure is composed of vierendeel trusses up to 19 m high that
are connected to the main structure by isolation devices that
allow the correct seismic insulation of the facade (under
construction).
Zimbo Project, Luanda Bay, Angola – integrating 2 residential
towers of 37 stories, 2 office towers of 32 stories, hotel of 37
stories, congress centre, underground parking, all occupying
55.450 m2 – structural engineer in AdF team of Architect Diogo
Lima Mayer - Intergaup - Gabinete de Urbanização e
Planeamento (scheme design in 2007 and project cancelled)
CURRICULUM VITAE de
JOÃO ADÃO DA FONSECA
2 / 6
Auditorium, Ville de Bordeaux, France – including an auditorium
with 1.440 seats, a car park in 7 underground floors and a
residential building of 3 stories which is supported by the eight
prestressed beams of the roof of the auditorium – structural
engineer in AdF team of Construction Company Buidin and
Architect Michel Pétuaud-Létang (built in 2012).
2.3
5
Pente 4,83 %
Pente 4.83 %
Pente 4.83 %
Pente 4,83 %
Pente 4,83 %
Pente 4,83 %
Pente 4,83 %
+20. 60NGF
Pente 18,0 %
2.678
1.50
2.00
passage sous le nez de
la dalle au droit d'appuis
pente MO YENN E sur 4m 5% max i
(dans l'axe de c irculation)
1,84
3,6
1,1
5
2.10
3,4
63,
74
2,7
1
pent e 3 3%
2.85
3.44
2.03
6. 77
2.50
2.59
2.1
62.5
1
0.2
0
2.8
9
2.7
0
2.5
8
35
51
96
0.4
0
0.1
0
2.5
1
2,3
5
2.1
5
2.1
0
0.1
00
.20
0.2
0
0.2
00
.20
2.7
0
0.2
0
2,5
8
0,2
0
2.3
5
1,35
36,7
6
1,2
4
X Tower, Luanda, Angola – building with 22 stories with a total
construction area of more than 29.000 m2 – project manager at
AdF design team for Rojual – Gestão de Proj. Lda. (built in 2018).
New football stadium, Zaragoza, Spain – total construction area
of 190.000 m2 – structural engineer in IDEAM design team of
Architects Joaquín Sicilia y Asociados (project finished in 2009
but not yet built)
Angra do Heroísmo new public library and regional archive, in
Terceira Island, Azores, Portugal – More than 10.000 m2
predominantly in concrete marked by the presence of a large
bridge in composite structure – structural engineer in AdF design
team of Architect Inês Lobo (built in 2014).
Avelar Brotero School, Coimbra, Portugal – rehabilitation and new
construction project – more than 16.000 m2 – structural engineer
in AdF design team of Architect Inês Lobo (built in 2011)
Quinta do Vallado wine cellar, Régua, Portugal – rehabilitationof
the old cellars and construction of the new cellar “Adega das
Barricas” – structural engineer in AdF design team of Architect
Francisco Vieira de Campos (built in 2010)
Visual Arts and Architecture Complex of Évora University,
Portugal – Reinforcement and requalification design of more than
CURRICULUM VITAE de
JOÃO ADÃO DA FONSECA
3 / 6
16.000 m2. Where more than 2500 m2 of existing wood slabs have
been reinforced through a concrete slab, turning the wood slabs
into composite wood-concrete slabs – structural engineer in AdF
design team of Architect Inês Lobo (built in 2007)
Headquarters of “Ferreira Construções”, Porto, Portugal -
rehabilitation and conversion of the old School of Journalism into
headquarters of “Ferreira Construções” – more than 2100 m2 –
structural engineer in AdF design team of Architects João Luís
Carrilho da Graça and Inês Lobo (built in 2008)
Residential buildings at Quai de Queyries, Bordeux, France –
detail design of the metallic structure of the roofs and of the main
composite beams of the large openings in the facades (26 m
span, supporting 5 stories). (under construction).
MOST RELEVANT BRIDGES AND VIADUCTS FOOTBRIDGES RAILWAY BRIDGES ROAD BRIDGES
FOOTBRIDGES Footbridge and cycling Bridge, Lisbon, Portugal – structural
engineer in AdF design team, in collaboration with Architects
Telmo Cruz and Maximina Almeida (built in 2015)
Forte da Casa Footbridge, Lisbon, Portugal - 220 m long viaduct,
with 42 m main span, connecting Forte da Casa, north of Lisbon,
to the Leziria Park, on the Tagus embankment – structural
engineer in AdF design team, in collaboration with Architect
Telmo Cruz. (built in 2015)
Footbridge Fuente Clara in Medellin, Colombia – detail design for
consortium Ferrocol (Colpatria+Ferrovial). Total length of 205 m
with main spans up to 26 m supported by precast and
prestressed I beams. Deep foundations on concrete piles. High
seismic zone – project manager of AdF design team in
collaboration with IDEAM (built in 2015).
CURRICULUM VITAE de
JOÃO ADÃO DA FONSECA
4 / 6
RAILWAY BRIDGES
3 railway Viaducts (Kinatoi, Zabaleta and Larrazábal), San
Sebastián, Spain, integrated in the high speed railway between
Vitória and San Sebastián, built by movable scaffolding system –
structural engineer in IDEAM design team (built)
Special overpass for high-speed railway, Madrid, Spain,
integrated in the high-speed railway between Madrid and Castilla
La Mancha; special overpass 162 m long, composed by several
precast and prestressed I beams with spans between 23 m and
31 m – structural engineer in IDEAM design team (built in 2010)
Four railway Viaducts, Murcia, Spain, in the high-speed railway
between Murcia and Almeria. Four viaducts in a high seismic
zone, with continuous prestressed decks – structural engineer in
IDEAM design team (built in 2016)
Bridge over River Barra (metro train), Rio de Janeiro, Brazil –
structural engineer in AdF and IDEAM local design team, in
collaboration with RMG Engenharia, of Rio Barra construction
consortium, working for Architect Santiago Calatrava (detail
design in progress in 2013 when project was cancelled)
High speed railway Viaduct over river Deba, Spain, integrated in
the high-speed railway between Deba and Bergara; steel-
concrete composite continuous beam with overall length of 900
m with typical spans of 80 m; piers up to 85 m height, built by
movable scaffolding system – structural engineer in IDEAM
design team (project finished in 2010 but not built)
Bridge over River Barra (metro train), Rio de Janeiro, Brazil;
cable-stayed bridge with one single reinforced and prestressed
concrete mast and main span of 140 m – structural engineer in
AdF design team and responsible for the full review of the whole
project, including control of the construction process (Built in
2015).
Railway Viaduct over river Piauí, Brazil – multiple simple
supported spans with overall length of 1360 m (68x20 m double
“I” composite beams) with precast columns – project manager of
AdF design team in collaboration with RMG-Engenharia (project
finished in 2014 but not yet built)
CURRICULUM VITAE de
JOÃO ADÃO DA FONSECA
5 / 6
ROAD BRIDGES
Road Viaduct in A42 highway, Sigües, Spain – a steel-concrete
composite (double composite action) cell box girder with lateral
struts (total width 26 m) with typical spans of 86 m and without
expansion joints; columns height up to 40 m - detail design as
structural engineer in IDEAM design team (built in 2009)
Mina Apolo Viaduct, Belo Horizonte, Brazil – concrete box girder
cantilever bridge with 170 m main spans, with mineral conveyor
inside the box beam – structural engineer in AdF design team in
collaboration with IDEAM, developing the detail design of the
main structure and composite steel-concrete box girders of
access decks (project finished in 2012 but not yet built)
Road Viaduct, Cartagena da Índias, Colômbia – inside the
Ecopetrol refinery installations; a 350 m long viaduct comprising
typical spans of 28 m and 22 m in precast post-tensioned
concrete beams – project leader of AdF design team of Mota-
Engil Construction Company (not yet built)
Bridge over the Amatitlán River on the federal road 95, Mexico
City to Acapulco, Mexico – enlargement of the deck from 10 m to
20 m wide and reinforcement of piers and abutments, including
foundations in a high seismic zone – project manager of AdF
design team in collaboration with IDEAM (project finished in 2014
but not yet built)
Integral bridge for Avenida del Rio, Malecon II, Barranquilla,
Colombia – detail design for Mota-Engil. Integral bridge over the
connection between la Darsena and the river Magdalena. Deep
foundations on concrete piles in a high seismic zone – project
manager of AdF design team (under construction).
Underpass, Spain, integrated the new road between Castellfollit
del Boix. – structural engineer in IDEAM design team (built in
2011)
Two road overpasses, Spain, at Manresa and Monteconil and
integrated in the new road between Castellfollit del Boix; simple
supported prestressed and precast box with 27 m span –
structural engineer in IDEAM design team (built in 2011)
Viaducto for Expo 2015, Milan, Italy – structural engineer in AdF
design team of Structural Engineer/Architect/Designer Cecil
Balmond of Balmond Studio (scheme design in international
design/built competition, in 2010).
New road Viaduct, Reunion Island, France, integrated in the new
road between Saint-Denis and La Possession – structural
engineer in AdF design team developing preliminary design for
BERD S.A. (2012)
CURRICULUM VITAE de
JOÃO ADÃO DA FONSECA
6 / 6
Several road viaducts, Lauro de Freitas, Brazil – structural
engineer in AdF design team performing review and quality
control of structural projects of several viaducts (Built in 2016)
OTHER PROJECTS PORTS and OFFSHORE STRUCTURS WATER FACILITIES SCAFFOLDING SYSTEMS
Terminal Harbour in Ponta da Madeira, São Luis Maranhão, Brazil
– project leader of AdF team for the full review of the whole
project, including the entire compatibility of all specialties and the
independent checking of all structural elements; total area of
platforms 19.300 m2, supported by 186 piles up to 45 m long
(built in 2016)
Antioquia Offshore Harbour and Access Viaduct, Antioquia,
Colombia – scheme design in international design/built
competition, in 2016 for Mota-Engil. More than 154.000 m2 of
offshore Platform and Viaduct in concrete supported by 2000
steel piles driven up to 90 m deep in high seismic zone. Project
leader of AdF design team (not built)
Torrential water control along the 65 street in Barranquilla,
Colombia – Box-Culvert in concrete for conduction of torrential
waters along more than 2500 m until discharge in the Magdalena
river. Maximum project flow for a 100 year return period of about
82 m3 / s. Project leader of AdF design team (built in 2018)
Movable scaffolding systems – structural engineer in AdF design
team working for BERD (www.berd.eu) in the detail design of an
overhead movable scaffolding system for the construction of
viaducts with concrete decks with spans up to 60 m.