Download - Converting and upgrading dredge equipment
Converting and Upgrading of
Existing dredge equipment
Iulia Berchiu & Basel Yousef
About Dredge Yard
• Specialized in Dredging & Mining components and equipment
• Supply of dredgers CSD & TSHD
• Engineering & Consultancy
• Components, Pipe & Coupling solutions
Dredge Yard Locations
THE NETHERLANDS TURKEY UAE
Dredge Yard Team
U.A.E.
The Netherlands
Turkey
Dredge Yard Facility
Upgrade Dredge Pumps
Upgrade Dredge Pumps Efficiency
Upgrade Dredge Pumps Efficiency
Upgrade Dredge Pumps Efficiency
Upgrade Dredge Pumps Efficiency
Upgrade Dredge Pumps Efficiency
Upgrade Dredge Pumps Efficiency
Comparison OLD PUMP NEW PUMP
Efficiency 72 % 84 %
Power 1,800 kW 1,540 kW
Investment 0
Per Year(340 days – 16 hr/day)
297 ton / Year
Fuel Consumption(210 g/kW-hr)
55 KG / Hour
Difference 260 kW
Hopper Unloading System
Hopper Unloading System
Hopper Unloading System
Bow Couplings
Double Walled Pipes
Double Walled Pipes
Swivel bends
Questions