![Page 1: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/1.jpg)
1
Contingency Planning in the Design of Air Pollution Control Systems
Carolinas Air Pollution Control Association
Presentation by:Michael Mannuzza
OBG
![Page 2: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/2.jpg)
2
CONTINGENCY PLANNING
<Risk: 1. Exposure to the chance of injury or loss, a hazard
or dangerous chance.<Risk Management:
1. The technique or profession of assessing, minimizing, and preventing accidental loss to a business, as through the use of insurance, safety measures, etc.
<Contingency: 1. A chance, accident, or possibility conditional on
something uncertain.
![Page 3: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/3.jpg)
3
Risk Associated with Diminishing Emission Limits NSPS Subpart Ce
Emission Standard for Medium HMIWIPollutant Limit
Lead0.0153mg/dscm
0.0079gr/103dscf
Cadmium0.013mg/dscm0.0057gr/103dscf
Mercury0.025mg/dscm0.011gr/103dscf
D/F (TEQ)0.00002mg/dscm
1.0gr/109dscf
RISK
EMISSION LIMITS
![Page 4: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/4.jpg)
4
LIMITATIONS OF SOURCE DATA<Process Scale-up
Uncertainties<Material Take-off
Limitations<Properties of Process
Exhaust that Preclude Data Collection
<Process Variability<Repeatability<Confidentiality
![Page 5: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/5.jpg)
5
CONTINGENCY PLANNING MEETING• A Type of Risk Assessment
– Systematic, Methodical Approach– Identifies Potential Exposure to Performance
Liabilities– Quantifies Potential Costs
• Provides a Methodology to Identify Potential Impacts on Project Cost & Schedule
• Adds the Most Value When:– Process Streams are Highly Variable– Available Data is Incomplete– Compliance Requirements are Challenging
![Page 6: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/6.jpg)
6
CONTINGENCY PLANNING MEETING<Implemented Much Like a HAZOP or Process Hazard
Analysis (PHA) Meeting– Assign a Score for Severity of Event– Assign a Score for Likelihood of Event– Establish a Risk Matrix Used to Drive Decision
Making<Excellent tool for:
– Identifying Regulatory Risk– Quantifying Potential Costs– Quantifying Potential Impacts on Schedule
![Page 7: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/7.jpg)
7
CONTINGENCY PLANNING PROCESS• Pre-Requisites:
– Knowledge of Process Constituency– Knowledge of Applicable Regulatory Codes
– Consequences of Non-Compliance– Potential Costs Associated with Non-Compliance
– Additional Labor Costs– Waste Disposal & Storage Costs– Lost Production Revenue– Regulatory Fines– Contractual Penalties– Additional Equipment Maintenance/Repair
Costs– Other Costs
![Page 8: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/8.jpg)
8
SEVERITY ASSESSMENTIMPACTS
SEVERITY REGULATORY PRODUCTION MAINTENANCE FINANCIAL1 Non-Reportable
IncidentNone Minorimpacton
equipmentlongevity
< $$$
2 Reportable Incident
Not Likely to Impact.
Minorimpactonequipmentlongevity.
$$$ to $$$
3 Reportable Incident
Possible Shutdown
Moderate.Mayrequireunscheduleddown-time,reduceequipmentlongevity.
$$$ to $$$
4 Reportable Incident
Definite Shutdown
Likelytocauseprematureequipmentfailure,requireextensiverepairs
> $$$
![Page 9: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/9.jpg)
9
LIKELIHOOD ASSESSMENT
LIKELIHOOD DESCRIPTION
1 Remote - Doubtful that it will ever occur
2 Unlikely - Might occur once during equipment lifetime
3 Likely - might occur several times during equipment lifetime.
4 Very Likely - could occur more than once on an annual basis.
![Page 10: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/10.jpg)
10
RISK MATRIXRISK MATRIXLi
kelih
ood 4 C N N N
3 A N N N2 A C C C1 A A A C
1 2 3 4Severity
A – Acceptable RiskC – Contingency Plan RequiredN – Not Acceptable – Must Design for Control.
![Page 11: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/11.jpg)
11
CONTINGENCY STRATEGY CATEGORIES
• APC Contingency Strategies Fall into 3 categories:1. Enhanced Equipment
Flexibility2. Provisions for Future
Equipment Implementation
3. Procedural Adaptation
![Page 12: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/12.jpg)
12
ENHANCED EQUIPMENT FLEXIBILITY –VENTURI SCRUBBER EXAMPLE
![Page 13: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/13.jpg)
13
FUTURE EQUIPMENT STRATEGIES• Certain Emission Levels May be Impossible to
Identify Prior to Start-Up.– Identify Technical Solution & Plan for it.
• Provisions Incorporated into the System Design to Facilitate the Installation of Additional Equipment if Needed:
– Spool Pieces– Nozzles– Concrete Pad Space– Fan Capacity– Fully Engineered Drawings– Budget
![Page 14: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/14.jpg)
14
FUTURE EQUIPMENT STRATEGIES –DRY SORBENT INJECTION
<Dry Sorbent Injection Skids4SO2 & SO3
4Mercury4Dioxin Furan4Enhanced ESP
Performance.
![Page 15: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/15.jpg)
15
BAGHOUSES – CATALYTIC FILTER OPTIONS FOR D/F CONTROL
Image provided courtesy of Gore Creative Technology Worldwide
![Page 16: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/16.jpg)
16
MERCURY ADSORPTION CONTINGENCY STRATEGIES
Image provided courtesy of Gore Creative Technology Worldwide
![Page 17: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/17.jpg)
17
PROCEDURAL ADAPTATION STRATEGIES
• Adjust APC Operating Parameters• Modify Waste Load size & Feed Rates• Limit Production Rates• Stagger Production Processes• Adjust Process Formulations• Employ Chemical Additives
![Page 18: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/18.jpg)
18
Conclusion• Contingency Planning Meeting:
– Provides a more focused contingency planning effort
– Engages all project stake-holders– Compensates for data shortfalls and
unknowns– Helps better define project cost exposure
and schedule– Mitigates risk– Helps project & plant managers sleep better
at night.
![Page 19: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/19.jpg)
19
![Page 20: Contingency Planning in the Design of Air Pollution ... · Contingency Planning in the Design of Air Pollution Control Systems Carolinas Air Pollution Control Association Presentation](https://reader030.vdocuments.us/reader030/viewer/2022040608/5ec75acb1ef01d61b2538602/html5/thumbnails/20.jpg)