Download - Construction Technology 3 D39 TA
![Page 1: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/1.jpg)
Construction Technology 3 D39 TA
Dr Mohamed Abdel-WahabEdwin Chadwick Building, Room 1.16
Lecture 3: Types of offsite production
![Page 2: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/2.jpg)
What are the drivers for offsite production?
![Page 3: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/3.jpg)
Lecture Outline
1. Volumetric
2. Panellised construction systems
3. Hybrid construction
4. Sub-assemblies and components
![Page 4: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/4.jpg)
Volumetric
![Page 5: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/5.jpg)
Can you think of a type of project where it would be crucial to use volumetric construction?
![Page 6: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/6.jpg)
Would you live here?!
![Page 7: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/7.jpg)
How long did it take to construct Container City 1 and how long it would have taken if constructed the traditional way?
Container City 1
![Page 8: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/8.jpg)
What could be the practical considerations for volumetric construction?
![Page 9: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/9.jpg)
Volumetric construction: bathroom and kitchen pods
Bathroom in a box
![Page 10: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/10.jpg)
![Page 11: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/11.jpg)
Practical considerations for volumetric construction (Pods)
![Page 12: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/12.jpg)
Summary of Pod cost data
![Page 13: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/13.jpg)
Panellised construction systems
![Page 14: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/14.jpg)
Types of panels
Open panels
Closed panels
Concrete panels
![Page 15: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/15.jpg)
Composite panels
SIPS
![Page 17: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/17.jpg)
Can you identify the 11-step process for the manufacturing of OSBs?
![Page 18: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/18.jpg)
Advantages of using SIPs
• Pre-assembled from the factory• Three times stronger than conventional stud walls • Allowing for design flexibility• Protection of the insulation material• Using recycled wood chips instead of newly-cut lumber
![Page 19: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/19.jpg)
Unitised curtain walling
![Page 20: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/20.jpg)
Practical considerations for panellised construction system
![Page 21: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/21.jpg)
Hybrid construction
![Page 22: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/22.jpg)
Practical considerations for hybrid construction
![Page 23: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/23.jpg)
Sub-assemblies and components
Pre-fabricated foundations (e.g. ground beams)
Floor cassettes
![Page 24: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/24.jpg)
Roof cassettes
Pre-assembled roof structure
Pre-cast stairs
![Page 25: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/25.jpg)
Practical considerations for sub-assembly
![Page 26: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/26.jpg)
Summary
1. Volumetric2. Panellised construction systems3. Hybrid construction4. Sub-assemblies and components
![Page 27: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/27.jpg)
Suggested resources
Steel framing walls assembly video
![Page 28: Construction Technology 3 D39 TA](https://reader036.vdocuments.us/reader036/viewer/2022062501/568168b3550346895ddf83eb/html5/thumbnails/28.jpg)
Go to m.socrative.com
G02
G02