Construction Programme
Team• Six Building teachers• Two Swedish and
English teachers• One Mathematic
teatcher• Satellite teachers • One teacher is
responsible for APU
Per Lennart Karin Runo
Agne Margareta Simon Joakim
Construction Programme
• For you who• You learn• The aim at
housebuilding• Theoretical studies • The first year• The second year• The third year• After the education• Education time
Programme structure• Core subjekt courses 750p• Common specific courses 500p• Branch courses (four national) 300p
- Building (Aranäsgymnasiet)- Construction- Painting- Plate working
• Profile courses 550p• Individual choice 300p• Project work 100p
Complete points:2500p
Profile courses (Aranäsgymnasiet)
Carpenter Bricklayer Concrete worker
Shuttering Brickwork B Reinforcement A+B
Main structure Plastering Concrete
Cladding Chimneys and open fires
Plastering
Building insulation Building insulation Building insulation
Joinery and interior
fittings
Ceramic tiles Shuttering
Courses that must be offered as optional courses
• English B
• Mathematics B
Points Hours Holidaytime Time. Tot.
0
0
0200 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0
0150 0
sum: 0 0 0
0
050 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0100 0
sum: 0 0 0
0
0
0150 0
sum: 0 0 0
0
050 0
sum: 0 0 0
0
0
0
0150 0
sum: 0 0 0
0
0100 0
sum: 0 0 0
100
100
1150 points 0 0 0Total points and hours:
Mathematic B MA 1202
English B EN 1202
Ceramic tilesHUS 1216100 poäng
Workingcard - CarpenterName: Group:
Structural timber andconcreteHUS 1206200 p
Practical elements
Profile courses:
Branch courses:
CladdingHUS 1203150 p
Reinforcement AHUS 1201100 p
Building insulationHUS 120550 p
ShutteringHUS 1207100 p
Joinery and interior f ittingsHUS 1213100 p
Main structureHUS 1214150 p
Repairs and conversionHUS 1211150 p
Individual choice:
ScaffoldingHUS 121550 p
Workingcard
Carpenter
BYNThe Swedish Construction
Industri Training Board
EmployerEmployees
RYKRYK
The Regional Construction Industri Vocational Training
Committees
RYK
School SchoolAranäsgymnasiet
The steps towards the professional titel
• Upper secondary school Buildings and Construction program 3 years. 2500 hours.
• 300 hours from RYK• Including work on
holidays.• Maximum 3400 hours
• Employment• Apply Apprenticebook
from RYK• Apprenticeship• 6800 hours• Theoretical test• Certificate
The workingplace training on constructions sites (APU)
• Contract/agreement
• Responsbility of the student
• Proper taskes
• Monitored by a tutor
• 4 weeks period of practice, 4 weeks in school
The workingplace training on constructions sites
• 20 kronor/hour (2 euro) 10 kronor foodcompensation, 10 kronor clothes and tools.
• Insurrance
• Hours of work
• Work environment
• Knowledge about machinery
The workingplace training on constructions sites
(APU)
• The third year is on construction site.
• The third year is in school
• The second year is in school.
• The second year is on construction site.
How can we find good companies to collaborate with?
BYNn´RYK-system
Aranäs-gymnasiet
Employees
Full-timeemployee
StudentConstructioncompanies
Confidence Flexibility Understanding
We know what it´s like to run a construction companyAnd we speak the same language.
Thank You for Your timeand Good Luck