![Page 1: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/1.jpg)
Construction of the Breakwater Road Cycleway Napier
“The Devil is in the Detail”
Presented by Tony Fong, Project Engineer
Resolve Group Ltd
![Page 2: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/2.jpg)
Presentation Outline
• Background• Location of site• Design phase• Tendering• Construction phase
![Page 3: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/3.jpg)
Background
Project initiated by Rotary Pathways Trust
Trust has 10 year plan to build cycle network in Hawkes Bay region started 2003
Currently at Stage 4 of 7 stages
Project funding 47% from Land Transport New Zealand subsidyBalance from Napier City Council
![Page 4: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/4.jpg)
Napier Airport
Location of Site
Area of Works
![Page 5: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/5.jpg)
Location of Site cont’d
Marine Parade
War Memorial Centre
Hardinge Rd
![Page 6: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/6.jpg)
Design Phase
Design generally in accordance with Transit’s Supplement to Austroads GTEP Part 14
Cycleway 1.6km long, typically 3.5m wide
Concrete cantilever specifically design by Maunsell as design subconsultant
Consulted with Transit, Napier City, Port of Napier and Ontrack
![Page 7: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/7.jpg)
Design Phase cont’d
Combined pedestrian & cycleway
Included signage
![Page 8: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/8.jpg)
Tendering
Physical works let as a Transit contract
Four (4) week tender period
15 set of tender documents issued to potential tenderers
Potential tenderers located from Wellington to New Plymouth, Tauranga & Hawke Bay
Received four (4) tenders
![Page 9: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/9.jpg)
Tender cont’d
Tenders evaluated using LTNZ’s Lowest Price Confirming method.
Winning tenderer was Tuck Contractors Ltd from Hastings.
Project budget was $600,000 Excl GST.
Contract period was originally 8 weeks.
![Page 10: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/10.jpg)
Construction Phase
![Page 11: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/11.jpg)
Location of cantilever & gabion wall overlooking Breakwater
BeachMarine Parade
Port of Napier
Breakwater Rd
Construction Phase cont’d
![Page 12: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/12.jpg)
Construction Phase cont’d
Footpath over gabion wall before cantilever construction,overlooking Breakwater Beach
Existing gabion wall
![Page 13: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/13.jpg)
Construction Phase cont’d
Cantilever construction propped falsework
Existing gabion wall
![Page 14: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/14.jpg)
Construction Phase cont’d
Cantilever construction to extend cycleway above existing gabion wall
![Page 15: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/15.jpg)
Construction Phase cont’d
Completed cantilever
![Page 16: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/16.jpg)
Construction Phase cont’d
Marine Parade
Breakwater Rd
Location of western rail
level crossing
Port of Napier
![Page 17: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/17.jpg)
Construction Phase cont’d
Rail level crossing at western end before works commenced
![Page 18: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/18.jpg)
Construction Phase cont’d
Rail level crossing at western end during construction
![Page 19: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/19.jpg)
Construction Phase cont’d
Completed rail level crossing with maze fencingat western end
![Page 20: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/20.jpg)
Construction Phase cont’d
Marine Parade
Breakwater Rd
Location of Gate 3 port of Napier heavy
truck crossing
Port of Napier
![Page 21: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/21.jpg)
Construction Phase cont’d
Gate 3 heavy truck entry into Port of Napierbefore works started
![Page 22: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/22.jpg)
Construction Phase cont’d
Gate 3 heavy truck entry into Port of Napierpedestrian & cyclist crossing
![Page 23: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/23.jpg)
Construction Phase cont’d
Completed pedestrian & cyclist crossing Gate 3 heavy truck entry at Port of Napier
![Page 24: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/24.jpg)
Construction Phase cont’d
Marine Parade
Breakwater Rd
Concrete cycleway
construction
Port of Napier
![Page 25: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/25.jpg)
Construction Phase cont’d
Typical steel reinforcing dowels between successive sections to minimise differential settlement
![Page 26: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/26.jpg)
Construction Phase cont’d
Breakwater Rd
Marine Parade
Port of Napier
Location of kerb & channel level
adjustments to match adjacent pavement
![Page 27: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/27.jpg)
Construction Phase cont’d
Checking to match kerb & channel levels to existing pavement
![Page 28: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/28.jpg)
Construction Phase cont’dConstruction Phase cont’d
Marine Parade
Breakwater Rd
Location of rail level crossing
opposite Coolstore
Port of Napier
![Page 29: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/29.jpg)
Construction Phase cont’d
Rail level opposite Coolstore
![Page 30: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/30.jpg)
Construction Phase cont’d
Completed rail level opposite Coolstore
![Page 31: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/31.jpg)
Construction Phase cont’dConstruction Phase cont’d
Marine Parade
Breakwater Rd
Approx location of guardrail
Port of Napier
![Page 32: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/32.jpg)
Construction Phase cont’d
Guardrail installation at chainage 600m
![Page 33: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/33.jpg)
Completed guardrail end terminal
Construction Phase cont’d
![Page 34: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/34.jpg)
Construction Phase cont’d
Marine Parade
Breakwater Rd
Location of Port of Napier
Gate 1
Port of Napier
![Page 35: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/35.jpg)
Construction Phase cont’d
Cycleway at eastern end by Port’s Gate 1 entry
![Page 36: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/36.jpg)
Construction Phase cont’d
Completed cycleway at eastern end by Port’s Gate 1 entry
![Page 37: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/37.jpg)
Completed cycleway at eastern end by Port’s Gate 1 entry
Construction Phase cont’d
![Page 38: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/38.jpg)
Summary
• Project is Pathways Trust initiative
• Stage 4 of 7 stages
• Project funding from LTNZ and NCC
• Constructed by Tuck Contractors Ltd
• Project budget $600,000.00
![Page 39: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/39.jpg)
Summary cont’d
• Key design features» Two rail level crossings» Two heavy truck crossings into Port» Concrete cantilever over Breakwater Beach
![Page 40: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/40.jpg)
Acknowledgements
• Mike Wong, Transit New Zealand
• Peter Scott, Napier City Council
![Page 41: Construction of the Breakwater Road Cycleway NapierCompleted cycleway at eastern end by Port’s Gate 1 entry Construction Phase cont’d. Summary • Project is Pathways Trust initiative](https://reader035.vdocuments.us/reader035/viewer/2022070921/5fb9ad894b311825695651ae/html5/thumbnails/41.jpg)