Download - Construction Charter Portfolio Committee Briefing By Co-Chairs James Ngobeni and Mike Wylie
Construction Charter
Portfolio Committee
Briefing
By Co-Chairs
James Ngobeni and Mike Wylie
BACKGROUND• Despite progress since 1994 S.A.still face
economic inequalities;
• The constitution of R.S.A underlines the importance of redressing inequalities;
• Government introduced various pieces of legislation;
• The Broad Based Black Economic Empowerment Act 53 (2003) provides cohesions and guidance for the gazetting of Transformation Charters;
STATUS QUO
• Business, Labour and Government embarked on a process during 2004;
• Objectives:– Define scope– Ensure participation of ;
• National Business Organisations including Women;• Labour unions;• Government Department
– Create Integrated Management Committee and other committees to facilitate participation
STATUS QUO• Business:
– ASAQS (The Association of South African Quantity Surveyors)– ABA (African Builders Association)– MBSA (Master Builders South Africa)– NABCAT (National Association of Black Contractors and Allied Trades)– NAFBI (National Federation for the Building Industry)– SAACE (The South African Association of Consulting Engineers)– SABTACO (South African Black Technical and Allied Careers Organisation)– SAFCEC (South African Federation of Civil Engineering Contractors)– SAIA (South African Institute of Architects)– SAISC (South African Institute of Steel Construction)– SAWIC (South African Women in Construction)– Women for Housing
• Labour:– NUM– BCAWU
• Government:– National Department of Public Works (Leading Department)
STAKEHOLDER FORUM
LABOUR BUSINESS GOVERNMENT
BUSINESS CAUCUS
LABOUR CAUCUS
GOVERNMENT CAUCUS
INTEGRATED MANAGEMENT COMMITTEE
SECRETARIAT
DRAFTING TEAM
TECHNICAL TEAMS
COMMUNICATIONS
COMMITTEE
Charter
Overview and Challenges• The industry is skewed in terms of race and gender• Over the past two decades the sector experienced declining
investment and demand volatility. The prospect of increased investment goes hand in hand with increasing capacity and output.
• There is a depleted skills base partly due to the sectors lack of appeal and factors such as workplace training, mentorship and recognition of prior learning will need urgent attention.
• There is insufficient penetration and lack of sustainable growth of black companies.
• Preferential procurement policies is being applied on a subjective basis leading to legal uncertainty.
• The industry is fragmented.
Objectives of the Charter• Transformation, growth, competitiveness and efficiency • Enhance entrepreneurial development and sustainable
growth of BEE companies through strategic partnerships.
• Address skills development with a particular focus on women.
• Achieve a substantial change in the racial and gender composition of ownership, control and management.
• Bring to an end the malpractice of fronting.• Lay the foundation for the integration of the construction
sector to provide a single access point.
Application and Reporting• Charter is applicable to all companies involved in
the creation and/or maintenance of fixed assets related to residential or non-residential buildings, infrastructure, or any form of construction works in South Africa.
• Annual reporting/auditing will be promoted.• Once in operation the charter will be reviewed
periodically.• The charter will take into account the size and
nature of participants.• There will be an oversight structure to implement
and monitor.
STEPS TO FIN
• Complete the template which defines the indicators of the elements of the scorecard. This work is virtually complete and shown on the following slides.
• Populate the indicators with the relevant information on the existing situation in the industry. This info is available from a very thorough situational analysis which has been completed over the past 18 months in conjunction with CETA. We anticipate that this will be competed by the end of this week.
• Finally the weightings and targets. There are discrepancies between industry, government and labour and compromises will be sought through a thorough discussion of the facts. We are hoping to complete this process by the end of June.
• The qualitative part of the charter is complete and when the quantitative side (scorecard) is complete our work will be done.
SCORECARD TEMPLATE
OwnershipVOTING RIGHTS Voting Rights in the Enterprise in the
hands of black people
Voting rights in the hands of black women
Voting rights in the hand of broad-based groups
ECONOMIC INTEREST Economic interest to which black people are entitled
Economic interest to which black women are entitled
Economic interest to which broad-based groups are entitled
Unrestricted economic interest - full value transfer
Control
BOARD Members of the Board who are black people as a % of the board
Members of the Board who are black women as a % of the board
EXECUTIVEMANAGEMENT
Executive Management who are black people as % of Executive Management
Executive Management who are black women as % of Executive Management
Employment EquitySENIOR MANAGEMENT
Black senior management as percentage of total senior management
Black women in senior management as percentage of senior management
MIDDLE MANAGEMENT
Black middle management as percentage of total middle management
Black women in middle management as percentage of middle management
JUNIOR MANAGEMENT
Black Junior management as percentage of total junior management
Black women in junior management as percentage of junior management
Skills DevelopmentTRAINING COSTS Direct training cost as a percentage of
payroll
Percentage of above spent on black people
Percentage of above spent on black women
Percentage of above spent on black management
Percentage of above spent on black women management
LEARNERSHIP Learnerships as a percentage of employees
Black learnerships positions as a % of total learnerships
Black women learnerships as a % of total learnerships
Youth learnerships as a % of total learnerships
BURSARIES Bursary expenditure on black students, as % of payroll
MENTORSHIP Implementation of an approved and verified mentorship programme
Preferential ProcurementTotal procurement on BBBEE accredited companies measured as per the the various levels as a % of total procurement.
Total score of 100% and above
Total score of 80% and above
Total score of 65% to 79.9% or small and micro enterprises
Total score of 55% to 64.9%
Total score of 40% to 44.9%
Total score of 20% to 39.9%
Enterprise DevelopmentMeasurement by considering improvements in turnover, profitability, asset base, number of employees, ownership for designated groups, credit worthiness.
Number ratio: BEPs turnoverMedium (3m-36m)Large a (37m-59.9m)Large b (60m-119.9m)Large c (120m-200m)Large d (>200m)
Number ratio: Contractors turnoverMedium (12m-60m)Large a (61m-500m)Large b (501m-1000m)Large c (1001m-2000m)Large d (>2000m)
ResidualDEVELOPMENT Development imperatives
(still to be identified)
CSI CSI as a percentage of annual profit after tax (all), orCSI as a percentage of payroll (BEPs only) andCSI as a percentage of turnover (Contractors only)(Measurement mechanism requires further discussion)
Regulation and Scorecard
• A scorecard will be implemented to measure progress in broad based black economic empowerment.
• The charter and scorecard will be issued as a Code of Good Practice according to which companies will be evaluated when tendering for work.
• This charter and scorecard will be finalised in accordance with the requirements of the Codes on Charter issued by DTI.
WAY FORWARD & CLOSURE
Thank You