ERCOT Quick Facts
• Electric Reliability Council of Texas – the ERCOT grid:
– Covers 75% of Texas land
– Serves 85% of Texas load
– >40,000 miles of transmission lines
– >550 generation units
– Peak Load: 68,379 MW (Aug 3, 2011 )
• Wind Integration– Wind capacity: ~10,500 MW– Includes ~2,000 MW in coastal area– Wind generation record: 9,418 MW
(Feb. 23, 2013), 28 percent of load at the time
ERCOT connections to other grids are limited to direct current (DC) ties, which allow control over flow of electricity
![Page 3: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/3.jpg)
3
ERCOT Wind Installations as of 12.31.12
![Page 4: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/4.jpg)
4
• Deliver wind power from remote region to the load centers through long extra high voltage transmission lines.
• Located at remote region, far away from synchronized generators and load.
• Significant power electronic devices to provide system support.
• Weak Grid Low short circuit ratio (SCR) Voltage will not be stiff, challenge
for voltage control (steady state and dynamic)
System performance is dominated by high wind/low wind, not summer peak/winter off-peak
Competitive Renewable Energy Zone (CREZ)
![Page 5: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/5.jpg)
Planning Studies: High Wind Scenario
(a). Without applying high voltage ride though capability.
(b). Applying limited high voltage ride through capability.
Fig. Voltage response at a 345kV bus in CREZ
![Page 6: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/6.jpg)
Cause and Potential Solutions
• Cause: Weak Grid– Low short circuit ratio (SCR)– Result in unstable voltage control (faster closed-loop voltage
control)– Result in temporary overvoltage that can lead to high voltage
collapse• Potential solutions
– Controller tuning– Enhance the system strength
![Page 7: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/7.jpg)
Operation Experience
WGR
0.69kV 34.5kV 34.5kV 69kV 69kV
Point Of Interconnection
ERCOT
Collector System
Bus 1 Bus 2 Bus 3 Bus 4 Bus 5 Bus 6
Bus 7
Short Circuit Ratio (SCR):Normal: 3Outage: Less than 2
![Page 8: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/8.jpg)
Operation Experience
Low Wind Output
High Wind Output
Low Wind Output
High Wind Output
PMU Records Benchmark Simulation
![Page 9: Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun- Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816939550346895de0a275/html5/thumbnails/9.jpg)
Challenges and Discussions
• A significant increase of wind projects proposed to connect to Panhandle area after CREZ implementation.– Short circuit ratio can be less than 1.5
• Challenges:– Dynamic model, tool adequacy– Controller limit: wind turbine, SVC, STATCOM…– System strength enhancement– Protocol requirement (grid code)– Protection challenges– …