Transcript
  • CONCEPT UNDER CONSIDERATION: SKYWAY REMOVAL WITH IMPROVEMENTS TO EXISTING STREETS / INTERSECTIONS

    • Removes Skyway structure and elevated approaches betweenTifft Street and Church Street

    • To minimize right-of-way impacts, no additional through lanes would be added on City streets

    • Adds turn lanes and optimizes signals to improve existing streets and intersections at key locations throughout the Study Area

    • Adds new connection between Abby Street and Rittling Boulevard

    Removal of Skywaystructure andelevated approaches

    Roadways and intersectionsto be improved

    New or reconstructedroadways

    Ti�t S

    t.

    Church St.Church St.

    Abby St.

    South Park Ave.

    Smith

    St.

    Ohio St.

    Loui

    sian

    a St

    .

    Ohio St.

    Exit 3

    Exit 6

    Ohio St.

    Loui

    sian

    a St

    . 190

    Ohio St.

    Smith

    St.

    South Park Ave.

    South Park Ave.

    Ti�t S

    t.Ba

    iley

    Ave.

    Baile

    y Av

    e.

    South Park Ave.

    City Ship Canal

    City Ship Canal

    Bu�alo River

    Bu�alo River

    Abby St.

    Rittling Blvd.

    Rittling Blvd.

    Exit 5

    Exit 4

    Elk St.Elk St.

    Seneca St.

    Seneca St.

    Clinton St.Clinton St.


Top Related