Download - COMPANY PORTFOLIIO
![Page 1: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/1.jpg)
C O M P A N Y P O R T F O L I I O
MCLENDON ENTERPRISES
FOOTPRINTIN GA.
![Page 2: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/2.jpg)
OFFICE LOCATIONS
Main Office2365 Aimwell RoadVidalia, GA 30474(912) 537-7887
Savannah Office9 Chatham Pkwy. S. Dr. Suite B-2Savannah, GA 31405(912) 349-0677
![Page 3: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/3.jpg)
MISSION STATEMENT
McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project.
MEET THE TEAM
President Benny D. Mclendon Email UsSecretary / Treasure Jennifer Hollis [email protected]
General Manager Tim Adams [email protected]
Office Manager Anne Roller [email protected]
Chief Engineer Sean Scott P.E. [email protected]
Lead Estimator Shane Holland [email protected]
Construction Manager Rusty Williams [email protected]
Senior Project Manager Adam Lee [email protected]
Business Development Bill Boies [email protected]
![Page 4: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/4.jpg)
Contract Revenue Earned2011: $ 33,457,474.00 2012: $ 46,660,631.00
*Number Of Permanent Employees*2010: 93 2011: 112 2012: 130 2013: 140
BACKGROUND
McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon
![Page 5: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/5.jpg)
Transportation ProjectsGeorgia Department of Transportation
CDBG ProjectsCity Streets / Roadway
Utility InstallationsWaterStorm
Sewer / Force main / Pump stations
Other ProjectsSubdivisions
Treatment PlantsDesign Builds
ON THE HORIZON
![Page 6: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/6.jpg)
CURRENT PROJECTS OVER $ 2,000,000.00
NAME ACREAGE CITY / STATE GENERAL CONTRACTOR GC REFERENCE COTRACT COST
Dean Forest Road Widening
4480 Savannah, GA. Chatham CountyRuss Abolt
(County Manager) $7,895,231.00
Fort Stewart Elementary
50Fort Stewart,
GA.Sauers Constr.
Darren Harrell (305) 306-0205
$2,546,200.00
GA DOT CSSTP-0007000(190)
1200 Savannah, GA. GA DOTWill Murphey (912) 427-5754
$2,001,921.00
Multi-Purpose Machine Gun Range
420Fort Stewart,
GA.Trend Constr.
Bill Cooke (910) 436-3426
$3,509,212.00
GA DOT EDS00-0545-00(014)
9600 Vidalia, GA. GA DOTWill Murphey (912) 427-5754
$24,040,300.00
GA DOT B145143-13-000-00
1500Bryan /
Effingham GA DOT
Will Murphey (912) 427-5754
$4,023,000.00
GA DOT Screven County
Bridge1200 Sylvania, GA. GA DOT
Edwin Thompson
(478) 552-4603$3,900,000.00
Hwy 80 & Pine Barren / Old
Louisville Road800 Pooler, GA. City of Pooler
Robert Bryd (912) 748-7261
$2,000,120.00
![Page 7: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/7.jpg)
PROJECTS COMPLETED WITHIN PAST TWO YEARS OVER $ 1,000,000.00
NAME CITY / STATE GENERAL CONTRACTOR OR ENGINEER CONTRACT COST
North Aviation Expansion Savannah, GA. North Aviation $24,371,531.00MLP 00-0030-(081) Evans
CountyClaxton, GA. GA DOT $18,934,256.00
ESS00-0545-00(028) Appling County
Baxley, GA. GA DOT $31,000,789.00WWTP Improvements City of Uvalda Hofstadter & Assoc. $415,019.00South Hunter Housing Savannah, GA. Balfour Beaty $3,047,079.00
Hazlehurst Airport Hazlehurst, GA. Hofstadter & Assoc. $2,087,801.00Swift Creek Bridge Toombs County GA DOT $2,952,926.00
Vidalia Cancer Center Vidalia, GA. Little Jon Engineering $1,097,626.00CCA Correctional Facility Millen, GA. Flint Constr $588,628.00
JD Dickerson School Vidalia, GA. McDonald Construction $385,144.00Aspen Heights Statesboro, GA. The Aspen Group $2,569,941.00
Bleckley Middle School Cochran, GA. Pope Construction $1,819,523.00East Dublin WWTP East Dulin, GA. Hofstadter & Assoc. $2,776,066.00
Bundy Officer Housing Ft. Stewart, GA. Balfour Beaty $2,727,139.00New Meadows Hospital Vidalia, GA. Brasfield & Gorrie $4,183,202.00
Hardin Canal Bridge Culvert
Savannah, GA. Chatham County $4,248,657.00
![Page 8: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/8.jpg)
3D-GPS, 3D-MILLIMETER GPS, LPS
BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY
![Page 9: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/9.jpg)
-- INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY-- REDUCE STAKING ON JOBSITE ALMOST ENTIRELY
-- CONTROLLING OF MATERIAL
![Page 10: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/10.jpg)
- - UP TO 300% MORE ACCURATE THAN STANDARD GPS-- INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE
- - GRADE TO TIGHTER TOLERANCES
![Page 11: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/11.jpg)
- - HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS-- USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE
![Page 12: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/12.jpg)
CURRENT PROJECTS AS OF AUGUST 1, 2013
MCLENDON ENTERPRISES INC. FOOTPRINT IN GA.
![Page 13: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/13.jpg)
-- LENGTH OF TAXI WAY = 6,800 FEET-- LENGTH OF TUNNEL =1,200 FEET
-- PILES DRIVEN = 688-- CUBIC YARDS OF DIRT MOVED = 850, 000
-- COST OF PROJECT = $ 24,371,531.00
NORTH AVIATION EXPANSION
![Page 14: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/14.jpg)
- 15,000 CYDS. OF DIRT REMOVED-- THREE RUNS OF 72” RCP 180’ LONG EACH REPLACED
-- 50 CYD. CONCRETE WEEP WALL INSTALLED-- 20,000 CYDS. OF DIRT REPLACED
-- 130,000 LBS. OF SAND AND CONCRETE BAGS-- REPLACED 300’ OF RAILROAD
PLANT VOGTLE “21” DAY EMERGENCY RAIL REPAIR
![Page 15: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/15.jpg)
-- LENGTH OF PROJECT = 2.5 MILES-- TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET
-- CUBIC YARDS OF DIRT MOVED = 60, 000-- COST OF PROJECT = $ 7,895,231.00
DEAN FOREST ROAD WIDENING
![Page 16: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/16.jpg)
-- LENGTH OF PROJECT = 1.58 MILES-- CYDS. OF CONCRETE POURED FOR RETAINING WALL
-= THREE FOOTBALL FIELDS x THREE FT. DEEP-- TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET
-- COST OF PROJECT = $ 18,934,256.00
GA DOT MLP OO-0030-(081) EVANS COUNTY
![Page 17: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/17.jpg)
NEW MEADOWS HOPISTAL
ASPEN HEIGHTS APARTMENT COMPLEX
VIDALIA, GA
STATESBORO, GA
COST OF PROJECT = $ 4,183,202.00
COST OF PROJECT = $ 2,569,941.00
![Page 18: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/18.jpg)
MCLENDON ENTERPRISES INC. WORKING HAND IN HAND
![Page 19: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/19.jpg)
-- CREATING MAXIMUM VALUE FOR EVERYONE-- WAYS TO MAINTAIN PROJECT SCHEDULES
-- HIGH QUALITY PROJECT RESULTS
BUDGETING
![Page 20: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/20.jpg)
-- PLANNING AND PREPARING-- PROJECTS PROGRESSION-- EXECUTION OF PLANNING-- PROJECT COST ANALYSING
ON SITE MEETINGS
![Page 21: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/21.jpg)
-- -- DID WE MAINTAIN A GOOD QUALITY PRODUCT ?
-- DID WE FINISH UNDER BUDGET ?-- DID WE FINISH PROJECT EARLY ?
-- WHAT DID WE LEARN ?
COMPLETION OF PROJECTS
![Page 22: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/22.jpg)
THE
WAY !
![Page 23: COMPANY PORTFOLIIO](https://reader035.vdocuments.us/reader035/viewer/2022062520/5681637c550346895dd45afb/html5/thumbnails/23.jpg)
ITEMS TO DISCUSS:
- MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE
- BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY
- MCLENDON ENTERPRISES INC. WORKING HAND IN HAND