PREPAREDNESS OF TODAY AND

FUTURE NATIONAL POWER SUPPLY

BOBBY ADHITYO RIZALDI, SE Ak., MBA, CFE

Member or Parliament Commission VII of the Republic of

Indonesia

PREPREDNESS OF TODAY AND FUTURE NATIONAL

POWER SUPPLY

ECONOMY GROWTH AND NATIONAL POWER

SUPPLY

� In the middle of today’s global crisis threat, World Bank admitts

that compared to other developing countries, Indonesia

economy growth is relatively stable.

� Government in APBN 2012 economy growth target is 6,7%

(increase from economy growth in 2011 by 6,3%).

� Target achievement of economy growth will be hard to

implemented without infrastructure acceleration development.

Bappenas reports the electricity infrastructure issue still be a

constraint to investment growth level in Indonesia.

PREPAREDNESS OF TODAY AND FUTURE NATIONAL

POWER SUPPLY

ECONOMY GROWTH AND NATIONAL POWER

SUPPLY

� World Bank through a survey doing business

2012 reduces business (investment) climate in

Indonesia from position 126 to 129. The

deceasing rank is caused by low electricity

infrastructure as one of the factor.

� The cause from the electricity infrastructure issue is

fund availability.

126

129

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

DEMAND GROWTH ON POWER

� Statement by LPEM UI in 2008 : Economy growth 1% needs

input in form of power growth by 1,5 – 2%, or elasticity

between 1,5 – 2%. PLN uses average elasticity 1.5

� Based on RUPTL 2010-2019, with economy growth

assumption averagely 6,1%, Electrification ratio (RE) will

increase from 65% in 2009 to 91% in 2019.

� Indonesia power needs predicted to grow in average by 9,2%

per year. In East Indonesia reaches to 10,6% per year, West

Indonesia reaches 10,2%, and in Jawa-Bali grows by 8,97%.

Power needs projection in 2019 reaches 327 TWh from 133

TWh in year 2010.

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

DEMAND GROWTH ON NATIONAL POWER

6

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Indonesia

Jawa-Bali

West Indonesia

East Indonesia

Realization Projection

327 TWh

252 TWh

54 TWh

28 TWh

133 TWh

104 TWh

20 TWh

10 TWh

Power needs of Indonesia predicted to grow in average of 9.2% per

year (Jawa-Bali 8.97%, West Indonesia 10.2% and East Indonesia

10.6%)

Realization and Projection of Power Needs 2010 - 2019 (GWh)

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

POWER SUPPLY GROWTH

� Per October 2010, from target 2010 by 67,56% elektrification

ration (RE) implemented only 66,28%. Or of number of

household per 2010 by 58.070.327 only 38.486.988

households that receives power (target 2010 is 39.231.030 household customers).

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

SUPPLY GROWTH OF POWER

Electrification ratio in average 66% and will increase in

2019 to 91%

9

PROJECTION OF ELECTRIFICATION RATIO 2010-2019

40,0

50,0

60,0

70,0

80,0

90,0

100,0

110,0

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

(%)

RE (%) Ind RE (%) IB RE (%) IT RE (%) JB

TAHUN 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

RE (%) Ind 66 69 71 74 77 79 82 86 88 91

RE (%) IB 62 64 67 69 72 74 77 79 82 85

RE (%) IT 48 50 52 54 57 60 62 65 68 72

RE (%) JB 72 75 78 81 84 87 90 93 96 98

10

PLAN OF POWER SUPPLY AND INVESTMENT

NEEDS

� Investment required for construction of new generator or

transmission line and its distribution up to 2019 predicted USD

97,1 billions or USD 9,7 billions per year. Investment need at

electricity sector at this huge certainly can not afford by PLN

or government only, private role required for the development

of National electricity.

� To fulfill electricity needs in 2019 will reach to 327 TWh (of 133

TWh in year 2010) required new plant construction up to

55.484 MW until 2019 or in average of 5.500 MW more per

year. More than that from 65% among of them needed in

Jawa-Bali.

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

11

Additional Plan of Generator Throughout Indonesia

-

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

9.000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

PLTU PLTP PLTGU PLTG PLTD PLTA

Total : 55.484 MW

MW 4.156

6.248

4.586 4.985

8.643

2.608

5.490 5.596

6.607 6.565

12

Investment Need of Generator for PLN + IPP, Transmission and Distribution

Total Investasi

Pembangkit

TransmisiDistribusi

-

2,000.0

4,000.0

6,000.0

8,000.0

10,000.0

12,000.0

14,000.0

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Juta USD

Column1 Column22010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Jumlah

Pembangkit 5,353.3 6,605.8 9,230.0 9,687.6 8,054.9 6,070.6 6,744.4 7,025.9 6,301.8 5,559.5 70,633.7

Transmisi 1,987.7 2,045.9 1,577.0 1,509.7 1,836.1 2,239.0 1,310.1 971.0 878.0 840.7 15,195.2

Distribusi 781.2 1,087.4 1,014.0 956.0 999.9 1,183.6 1,210.5 1,330.1 1,371.7 1,340.3 11,274.7

Total Investasi 8,122.2 9,739.0 11,821.1 12,153.3 10,890.8 9,493.2 9,265.0 9,326.9 8,551.5 7,740.5 97,103.6

13

� Production of power in 2010 reached to more or less 170 th

GWh and will increase 10% or 187 th GWH in year 2011,

where around 27% from private. This shows besides state

enterprise, private also has participated in power supply and

will increase in line with power need growth.

SUPPLY PLAN OF POWER AND INVESTMENT

NEED

� The participation of private (IPP) nationally very beneficial, hence power supply to local areas shortly be handled considering limited investment by PLN finally to accelaret the increase of electrification ratio.

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

14

PLAN OF SUPPLY OF POWER AND

INVESTMENT NEED

� To encourage acceleration in power supply needs support from many aspects, either regulation aspect or technical aspect or commercial aspect such as national banking support as well as government guarantee.

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

� On the acceleration program of construction of plants 10.000 MW phase 2, especially on the geothermal plants development that reaches to 39% or 3.967MW of the private role (IPP) will get bigger starts from exploration phase to power plants construction.

15

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

Area PLTA PLTGU PLTP PLTU PLTG Total

Jawa 1,000 1,200 1,970 1,600 5,770

Outside of

Jawa204 360 2,007 1,712 100 4,373

Total 1,204 1,560 3,967 3,312 100 10,143

Portion 12% 15% 39% 33% 1% 100%

Acceleration Project of Plants 10.000 MW Phase 2

16

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

Acceleration Project of Plants 10.000 MW Phase 2

Total electricity production 170 GWhwith consumption from PLN and IPP

18

LEGISLATIVE ROLE IN NATIONAL

POWER SUPPLY

� Subsidy to allocate in form of primary energy and grid system availability.

� Demand Side Management which is determination of basic tariff of electricity.

� Main priority of State Enterprise in dealing with electricity company. In Law No.30 year 2009 on Electricity Section 4 : The implementation of power supply by government and local government is done by state enterprise and local area enterprise. Private enterprise, cooperative, and community self-reliant can be participated in power supply business.

� National electricity not only to illuminate but stimulates the new center of industry .

KESIAPAN PENYEDIAAN TENAGA LISTRIK NASIONAL

SAAT INI DAN DI MASA MENDATANG

.

ELECTRICITY SUBSIDY GROWTH

Rp.55,1 T

Rp.65,48 T

Rp.45,0 T