Collaboratively Innovating and
Implementing PBN
Doug Marek FAA Operations Manager,
16 October 2012
Greener Skies over Seattle
2 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Greener Skies Scope i1 –Design/Implement PBN instrument procedures into a complex airspace, with a mixed fleet, all while providing an environment for research.
• OPD STARs and RNAV (RNP, GPS, RVFP) approaches • Flight Simulation (9) / Flight Trials (2067 flights over 50 days) • Environmental Study
i2 - Evaluate concepts, research alternatives and establish requirements resulting in full implementation of PBN technologies within SEA/BFI airspace and NAS-wide.
• RNP Established • Concurrent Approaches • RNP to ILS Capture • Procedurally Separating Arrivals/Departures
i3 - Implementation of new procedure, rule making, and TFM/training.
• Implement RVFP, RNP Establish, Concurrent Approaches, RNP to ILS • Waivers and DCPs • Ensure TFM/training is developed
3 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Actions
Keys to Success:
ATC/Pilot use Repeatable in all WX
TFM
4 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Connecting RNAV STARs with RNP, RVFP,
and ILS Approaches
RNAV vs. Conventional STAR
Build speeds and altitudes into procedures
6 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
One Track, Three Approaches, All Weather
Visual / RVFP RNAV / RNP ILS / RNP to ILS
Keeping It Simple
7 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
WX / ATC Separation
56.10%
19.70% 17.00%
7.20%
5,000+ ft / 5+ nm 2,500+ ft / 3+ nm 800+ ft / 2+ nnm NA / 300 RVR
Visual Charted
RVFP GVFP RNP
ILS
B6500 A6000
6000
5000
12 miles further
Continuous Glideslope from HEDDR
8 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Importance of One Track
ATC issues and the pilots fly the same track every time, predictable and stabilized STAR connects to all approaches, continuous glideslope, no level-offs or vectors issued
9 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Simultaneous Operations
Overlay: Visual/RVFP RNAV (RNP)
RNAV/RNP to ILS
Repeatable Track (LNAV/VNAV/SPD) Simultaneous Operations
ATC/Pilot/TFM Predictability
10 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
RNAV Visual Flight Procedure
11 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Guided Visual Flight Procedure
12 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
Guided Visual Flight Procedure
MARNR STAR
1) ASA481, after DALTN, cleared RNAV Z Rwy 16R, report the airport in sight DALTN
2) ASA481 has the airport insight
3) ASA481, cleared Guided Visual
7110.65, para. 7-4-4 separation visual separation
13 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
RNP Established
14 Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
RNAV (TF)/RNP (RF) to ILS
RNAV (TF)/RNP (RF) to ILS Mode Change
ILS Section
Parallel ILS/RNP/GPS
RNAV/RNP Section
15
Concurrent Approaches
16
Key to Success
Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
• Focused research, building off today's standards to deliver more benefits in the future
• Create ATC separation procedures that use today’s aircraft avionics technology (RNP Established, Concurrent Approaches, RNP to ILS Capture, RVFP, etc.)
• Overlay different types of PBN IFP, covering all
weather conditions, keeping ATC/flight deck/TFM simple
17
Keys to Implementation
Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
• Collaboration with all stakeholders, conduct flight trials, and integrate ATM/TFM procedures
• Collect and analyze lessons learned for replication globally
• Build an experienced cadre to implement the process
in like facilities across the ATM system
18
Thank You
Collaboratively Innovating and Implementing PBN – Greener Skies over Seattle
6L 6R
24L
34L
16R
34R
16L