Cockermouth
Eight Months On
Main Street
Abandonment
Restoration
Adaptation
Wordsworth House
Flood Level
Education
Riverside
Despair
Hope
Brewery Bridge
Defence
1 Million from the EA
Workington North Station
• At the end of September 2010 Workington North Railway Station closed
• Serving 2000 passengers following the bridge collapse this has now dropped to 60.
Credits
• Photos
Mark OLLIS
• based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery