Traffic at Major ports, the past and the furture – Kolkata port
in million tonnes
![Page 23: Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816435550346895dd5fb92/html5/thumbnails/23.jpg)
Infrastructure needs for meeting the furture Growth
• Number of Berths• New Non Major Ports• Increase in efficiency of Coal Handling• Warehousing space for coal• Minimize the Turnaround time of the Ship• Increase the Draft• Rail connectivity with Wagons availability• Road connectivity
![Page 24: Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816435550346895dd5fb92/html5/thumbnails/24.jpg)
Increase Draft upto 20 m to accommodate Capesize Vessel upto 2 lakh tonnes
High unloading Capacity around 50,000 MT per Day
Recommending to plan Mega ports with above
infrastructure than smaller ports .
Where we need to invest for Coal
![Page 25: Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?](https://reader036.vdocuments.us/reader036/viewer/2022062520/56816435550346895dd5fb92/html5/thumbnails/25.jpg)
Valemax Still a Dream for handling Coal
•Environmental and Safety Concerns ?
•Can the Ports afford to have a draft of 25 M?