15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Successful CNS/ATM Project Implementation: Human Resource and Training Needs
Dr. Frank T. Ruggiero
Project DirectorFANS Stakeholders’ Group
IATA Headquarters, Montreal, Quebec [email protected]
Successful CNS/ATM Project Implementation: Human Resource and Training Needs
Dr. Frank T. Ruggiero
Project DirectorFANS Stakeholders’ Group
IATA Headquarters, Montreal, Quebec [email protected]
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
CNS/ATM Success FactorsCNS/ATM Success Factors
Plann ing Project O pe ration sDevelopm ent
Approval
M anagem ent
National Im plem entationGlobal
Regional
ANPp
Transition
M aintenance
ANPp
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Satisfying Regional Differences while Maintaining Interoperability with Global Approach
Cost-benefit & Business Case for adopting FANS, CNS/ATM elements for all stakeholders’
Need for “implementation orientated” regional coalitions for achieving real progress
Team-Centered, Human Resources Management, Planning & Training
Plan and manage full system life-cycle solution
Planning for Success: Lessons from 5 Years of ProjectsPlanning for Success: Lessons from 5 Years of Projects
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Focus on Technical System Component DesignFocus on Technical System Component Design
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
(RNP 5) Basic RNAV ‘98 / 8.33 kHz VHF ‘99 / (RNP 1) Data Link Comm ‘01
(RNP 10) ‘98/
ADS-A, RNP-4 CPDLC ‘03
(RNP 10) ‘98/
ADS-A, RNP-4 CPDLC ‘03
Reduced Vertical Separation Minimums (RVSM) ‘98
Focus on Technical System Component DesignFocus on Technical System Component Design
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Rqmt PlanningDocuments
TechnicalDocuments
CarriageDocuments
PotentialSolutions
Dates/ Confidence
8.33 kHzVHF
ICAO COM/DIV-Apr 95MNC Statement
SARPs Annex 10EUROCAE MOPS ED23BRTCA MOPS, DO-186A
Eurocontrol 8.33Implementation Plan,8.33 kHz User GuideAIC IFR 6/96 (Ger)
See Radio SlideUHF alternative
Eur - Jan 99(High)
VHF DLACARS,Mode 2(AVPAC),Mode 3(TDMA)
ICAO COM/DIV-Apr 95NAS Arch Plan
Draft VDL SARPsARINC 716-9, 750-1TDMA draft MASPsMode 2 draft MOPS
CONUS TDMA -2004-2010(Low)Europe Mode 2~2005 (Low)
HFDL ICAO AMCP/4Mar 96
Draft SARPs, to be completedlate 97ARINC 753, 635, 634Draft MASPs and MOPS, to becompleted late 97
ARC-190/CP2024B Pacific 2003-2005(Med-High)NAT >2000(Low-Med)
SATCOM ATS SR&OIPACG/9FAA/JCABStrategic OceanicPlan
AMSS SARPs, Annex 10ARINC Char 741RTCA DO-210C,215A,222FAA Notice N8110.58
ICAO Annex 11proposal
Aero-HAero-IUHF SATCOM (?)Iridium (?)
Pacific 2003-2005(Med-High)NAT >2000(Low-Med)
CMU All ADS/CPDLCPlans
ARINC Char 758ARINC Report 660
Allied SignalCollins CMU-900
Typical CNS/ATM Transition Table
Focus on Technical System Component DesignFocus on Technical System Component Design
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Airport Analysis Lacks Work Systems Airport Analysis Lacks Work Systems
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Work Task/Systems AnalysisWork Task/Systems Analysis
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Large System DevelopmentLarge System Development
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Full Life-cycle Project Planning ProcessFull Life-cycle Project Planning Process
Plann ing Project OperationsDevelopm ent
Approval
M anagem ent
National Im plem entationGlobal
Regional
ANPp
Transition
M aintenance
ANPp
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
ConclusionsConclusions
15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil
Develop a new accredited job skill
“Bridge” between Planning and Operations
Modular training approach
Would not replace consultants, but improve their effectiveness and reduce risk
CNS/ATM Implementation SpecialistCNS/ATM Implementation SpecialistCNS/ATM Implementation SpecialistCNS/ATM Implementation Specialist
Plann ing Project OperationsDevelopm ent
Approval
M anagem ent
National Im plem entationGlobal
Regional
ANPp
Transition
M aintenance
ANPp
CNS/ATM Implementation SpecialistCNS/ATM Implementation Specialist
CNS/ATM Implementation SpecialistCNS/ATM Implementation Specialist