Communication
1. ATS Services Network (ASN)
2. ATS Message Handling System (AMHS)
ScheduleItem
Relocation
4. Data Link Service Provider Partnership
3. Voice/Data Link VOLMET and ATIS
Navigation
1. SBAS
2. GBAS
Surveillance
1. ATC Organization Consolidation and Airspace Re-structure2. Construction of North & South ATS Centers
Air Traffic Management
1. ADS-B
3. Air Traffic Management System (ATMS)
ATM/DSP
4. Digital Voice Communication Switching System (DVCSS)5. Aeronautical Information Service System (AISS)
6. ATS Facilities Relocation
D/ATIS & VOLMET/DSP
Planning
7. Independent Back ATC System (IBAS)
Relocation
2003 2004 2005 2006 2007 2008 2009 2010 2011
3. APEC GNSS Test bed Project
Preplan
Planning
Planning
Completed by Mid 2007
Modify Transition
Planning
Relocation
Relocation
Planning
Planning
Procurement Implementation (39 months) Transition
Procurement Implementation (39 months) Transition
Procurement Implementation (39 months) Transition
Trail Sys
3
CN
S/ATM
Project
CommunicationCommunication
ASN (ATS Services Network) AMHS (ATS Message Handling System) Voice/Datalink VOLMET and ATIS Air-Ground Datalink AIDC (ATS Inter-facility Data Communicati
ons)
4
CN
S/ATM
Project
ATS Services NetworkATS Services Network
Commission: 2009.04
IMC 圖 1
ASN WAN15JUN2008
ASN2 WAN架構
2*NGSDH(4M) 2*NGSDH(4M)
2*T3
HiLinkATM Network
2*E12*E12*512k2*512k2*512k2*512k 2*512k 2*512k 2*512k
2*T3
南管園區(圖3)
北管園區(圖2)
蘭嶼塔台(圖14)
2*512k
恆春塔台(圖11)
綠島塔台(圖15)
豐年塔台(圖13)
馬公塔台(圖9)
金門塔台(圖8)
北竿塔台(圖7)
南竿塔台(圖6)
松山塔台/業務室(圖5)
高雄塔台
台北諮詢臺
台北塔台(圖4)
松山諮詢臺
翔安
2*E1
大屯山助航台FERCE
恆春助航台FERCE(圖12)
微波
清泉崗助航台FERCE
花蓮助航台FERCE
高雄諮詢臺
馬公助航台FERCE(圖10)
512k
512k
嘉義助航台FERCE(圖16)
512k
豐年FERCE
7
CN
S/ATM
Project
NavigationNavigation
SBAS GBAS APEC GNSS Test Bed Project RPS (RAIM Prediction System) RTRS (Real Time RAIM System)
8
CN
S/ATM
Project
APEC GNSS Test BedAPEC GNSS Test Bed
Starting 2005.10 Taipei TRS successfully integrated in 2006
9
CN
S/ATM
Project
CAA TRS Subsystem ArchitectureCAA TRS Subsystem Architecture
L1/L2GPS
Receiver
Computer(Linux)
NTPServer
Serial / EthernetSwitch R
oute
r
10 MHzReference
10BaseT
Ethernet
10BaseTEthernet
10BaseTEthernet
RS-232Serial
ConnectionTo TMS Site
GPS L1/L2Antenna
GPS L1/L2Signals
DCB
Remote Login Connection
OscillatorGPS L1Antenna
GPS L1Signals
11
CN
S/ATM
Project
RPS (RAIM Prediction System)RPS (RAIM Prediction System)
NCKU funded by CAA Offline processing
12
CN
S/ATM
Project
RTRS (Real Time RAIM System)RTRS (Real Time RAIM System)
NCKU funded by CAA Real-time processing
14
CN
S/ATM
Project
Radar InstallationRadar Installation
10 civilian radars (1 with Mode-S capability)
Replacement of 2 radars
15
CN
S/ATM
Project
ADS-B SystemADS-B System
6 ground stations Contract: 2009.04 System acceptance: 2009.12
17
CN
S/ATM
Project
ATM ProgramATM Program
ATS organization consolidation Airspace restructure Construction of North and South ATS
Parks Implementation of ATMS, AISS and
DVCSS ATS facilities relocation
19
CN
S/ATM
Project
Consolidation of ATC FacilitiesConsolidation of ATC Facilities
Concurrently with ATC OP transition
TACCTACC
Taipei TCCTaipei TCC
Kaoshiung TCCKaoshiung TCCTaichung TCCTaichung TCC
Hualien TCCHualien TCC
Taitung TCCTaitung TCC
NorthNorthATS ParkATS Park
SouthSouthATS ParkATS Park
21
CN
S/ATM
Project
Airspace - TerminalAirspace - Terminal
NorthNorthATS ParkATS Park
SouthSouthATS ParkATS Park
TaipeiTaipeiTMATMA
HualienHualienTMATMA MatsuMatsu
TMATMA
KaoshiungKaoshiungTMATMA TaitungTaitung
TMATMA KinmenKinmenTMATMA
26
CN
S/ATM
Project
Existing ATC SystemsExisting ATC Systems ATCAS
Commission: 1994 NAS - TACC ARTS - Taipei, Taichung, Kaohsiung TCC
Eurocat-1000 Commission: 2000 Hualien, Taitung TCC
Micro-ARTS Commission: 1990
IBAS Commission: 2007
27
CN
S/ATM
Project
ATMAS ImplementationATMAS Implementation
Major components ATMS (Eurocat-X by Thales ATM) AISS (ANAIS by Thales IS) DVCSS (VCS-3020X by Frequentis)
Contract: 2006.10.16 System Acceptance: 2010.02.19 Commission: 2011.02.20
29
CN
S/ATM
Project
ATMS FunctionalitiesATMS Functionalities
MSTS (Multi-Sensor Tracking System) FDP (Flight Data Processing) HMI for stripless operation ATC Tools Conflict Detection ATFM (Air Traffic Flow Management) A-G & G-G Datalink communications Synchronous replay of data and voice Simulation and training
30
CN
S/ATM
Project
AISSAISS
Application & Web servers
AMHS
DB
DB
AISS main server
Airlines / MIL
ATMSDevelopment system
FIC
ATSMO
Self/Home Briefing
ASN LAN ASN LAN
Demarcationpoint
ASN LAN
IMC
AISS clients
Demarcationpoint
WWW
CAA eAIP
ASN WAN
ASN LAN&WAN
WAN
ATMS CWP clients
FIS
Time Server
TAMC FTP server (AOAWS+WAFS)
ATSD
31
CN
S/ATM
Project
Aeronautical Information DistributionAeronautical Information Distribution
工程隊頁數:1
AISS流程96.09.19
AIS DISTRIBUTION
AISS
SITA
Airlines
AMHS
ATMS
RCAA OPMET
RCAA FPL Validated by AISS
RCAA DEP,ARR MSG
Other FIRs
FPL for va
lidation
FPL to SITA add
MET FTP
FPL/RPL/DPL/Flight RPTs
FPL/DPL/PIB/NOTAM/MET/Flight RPTs
RCAA FPL Validated by AISSNOTAM NOTAM
SITA Network
RCAA NOTAM
INTERNET
ASN
FPL/DEP,ARR MSGFPL for validation
FIDS
FPL/Fligh
t Data
FPL/DPL/PIB/NOTAM/MET/Flight RPTs/
AIP/Flight Data
FPL/RPL/DPL/Flight RPTs
ATSD eAIP
GRIB/RPL/DPL/AIP Static Data
FPL/DEP,ARR MSG
Flight Data to FIDS
RCAA NOTAM
RCAAOPMET
GRIB/Charts/OPMET/GTS
RCAA DEP,ARR MSG
RCAA OPMET
Boundary of ANWS’s Systems
Boundary of ANWS’s Systems
FPL to SITA
add
RCAA NOTAM
TAMC
AMHS UA
RCAA FPL Validated
by AISS
RCAA FPL Validated by AISS
RCAA FPL filed in ATMS
RCAA FPL filed in ATMS
FPL for va
lidation
FPL to SITA add
FPL for validation (paper)
RCAA FPL filed in ATMS
AISS WEB Server(AES)