![Page 1: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/1.jpg)
Climb Audit – Guyed Tower BC000 - Metchosin
Metchosin, BC
Prepared for: Telecom Company
![Page 2: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/2.jpg)
SITE DETAILS Site Information Customer: Telecom company Customer Site Code: BC0000 Customer Site Name: Metchosin Tower Owner: Telecom Company Owner Site Code: W0000 Owner Site Name: HYW 14, Metchosin, BC Address: Highway 14 , Metchosin, BC Latitude: 48°24’11.7 N Longitude: 123°34’20.1 W Site Access: Four-wheel drive Co-locators: Telecom Company A and Telecom Company B Structure Information Tower Manufacturer: Trylon Tower Serial Number: 3810 Year Manufactured: 2002 Tower Height (meters): 64 Tower Height (feet): 210 Tower Azimuth(Leg closest to 0° N): 10.4° Face Width (inches) : 36 Climbing Ladder present: Yes If applicable: Outside Fall Arrest Type: Rail Manufacturer : Trylon Anti-Climb present: Yes Tower Lighting present: Yes Lighting Type: Incandescent Lighting Elevation(s): 150’ & 210’ Tower reinforcing present: No Reinforcing type & elevation: N/A Foundation reinforcing present: No
![Page 3: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/3.jpg)
AUDIT DETAILS
Audit Prepared for: Doug Johnson, Telecom Company 123 Main Street, Vancouver, BC Audit prepared by: Joe White Audit prepared: May 10, 2013
Audit Performed by: Mike Wilson Audit Date: April 30, 2013 Temperature: 10°C Wind Direction and Speed: 15KM/H NW Guy Anchor & Cable Condition notes:
1) Acceptable.
2) Acceptable.
3) Acceptable. Scope of Work This audit prepared by Trylon, is intended to show the current appurtenances, transmission line locations, compound lay out and the general state of the structure. This audit should in no way be interpreted as a warranty of structural integrity. Other Notes N/A
![Page 4: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/4.jpg)
APPURTENANCE SCHEDULE We noted the following appurtenances on the tower during our site visit: Appurtenance
Number Elevation
Anteena(s) Azimuth
(° True North)
Line ft. m Type Qty Mount Owner Size Qty
1 219.5 66.9 K 742 223 6 Pinwheel Telecom Company 50/170/300 LDF7 12
2 172.0 52.4 Ericsson 4-ft (UKY21042) 1 Face Telecom
Company 55 LDF2 2
3 147.0 44.8 UHX6-107 1 Face Telecom Company 55 LDF2 4
4 117.0 35.7 VHLPX4-23-SS2 1 Face Telecom
Company 350 LDF2 4
5 100.0 30.5 VFEED-4X-18 1 Face Telecom
Company 50 LDF2 2
Other Notes
• Empty Mounts are included in appurtenance schedule • Azimuths are +/- 10 degrees
![Page 5: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/5.jpg)
PHOTOGRAPHS
Azimuth 10° Azimuth 130° Azimuth 250°
Tower Profile and Name Plate
![Page 6: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/6.jpg)
Close-Up of Pinwheel(s) from Ground
Azimuth 225°
Azimuth 135°
ITEM 1
![Page 7: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/7.jpg)
Pinwheel Elevation View
Azimuth 60°
Azimuth 180°
Azimuth 300°
![Page 8: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/8.jpg)
Item 1: Elevation View of Antennas
![Page 9: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/9.jpg)
Item 2: Microwave at 172’
![Page 10: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/10.jpg)
Item 3: Microwave at 147.0’
![Page 11: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/11.jpg)
Item 4: Microwave at 117.0’
![Page 12: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/12.jpg)
Item 5: Microwave at 100.0’
![Page 13: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/13.jpg)
Views of Each Tower Face
Azimuth 75°
![Page 14: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/14.jpg)
Azimuth 195°
![Page 15: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/15.jpg)
Azimuth 315°
![Page 16: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/16.jpg)
Climbing Ladder and Transmission Line Ladder(s)
Transmission Line Layout – Face Azimuth 75°
Transmission Line Layout – Face Azimuth 315°
Climbing Ladder
![Page 17: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/17.jpg)
Port Entry Outside
Port Entry Inside
![Page 18: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/18.jpg)
Tower Foundation
![Page 19: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/19.jpg)
Guy Anchor 1 – Azimuth 10°
![Page 20: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/20.jpg)
Guy Anchor 1 – Azimuth 10°
![Page 21: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/21.jpg)
Guy Anchor 2 - Azimuth 130°
![Page 22: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/22.jpg)
Guy Anchor 2 - Azimuth 130°
![Page 23: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/23.jpg)
Guy Anchor 3 - Azimuth 250°
![Page 24: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/24.jpg)
Guy Anchor 3 - Azimuth 250°
![Page 25: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/25.jpg)
Compound Layout
![Page 26: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/26.jpg)
Compound Layout
![Page 27: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/27.jpg)
AutoCAD Entry Port Sketch
![Page 28: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/28.jpg)
AutoCAD Tower Plan View Showing Lines
![Page 29: Climb Audit – Guyed Tower - Trylon · Climb Audit – Guyed Tower . BC000 - Metchosin . Metchosin, BC . Prepared for: Telecom Company](https://reader030.vdocuments.us/reader030/viewer/2022021521/5b25b9c97f8b9a5b4d8b475a/html5/thumbnails/29.jpg)
AutoCAD layout from previous drawing package to be reviewed and updated from field audit redlines/sketch.