    Client Requirements

    License Installation RequirementsPlease enter the number of licenses required for each type of installation

    Outlook Version Professional Stand-alone edition

    2003

    Client RequirementsPlease indicate what benefits you would like to experience through Orla

    Client Comment Response by the Project Manager?

    At an end user level

    At management level

    Professional CitrixEdition

    Professional ServerEdition

    1.2.3.

    1.2.3.

    1.2.3.

    1.2.3.

  • 8/14/2019 Client Plan 2007 28 11

    2/5

    Standard Operating Environment AuditA Non-SOE Audit must be completed for every computer not included in the Company SOE

    IT Environment Question Response from client

    Is Outlook accessed via Citrix or other terminal software?

    If Yes, then how many users access Outlook via this method?

    What virus and spyware protection software do you use?

    What Version(s) of Windows are used ?

    What Version(s) of Outlook are used?

    Please indicate the size of each user's PST file

    Testing Response from Client

    Is there any specialized software typically installed on youruser workstations?(In-House Application, MS CRM, Contact Management, ETC)

    What versions of Microsoft Service Packs are installed onuser's workstations?

    How do you typically upgrade and install software(per machine or via server run routines?)

    What kind of email server is used?(exchange/IMAP/POP3)

    Where is e-mail typically saved on your network?(Exchange DB/PST/Server/ETC)

    What (if any) policies are in place to manage the size of usersPST files?

    Is any email compliance software used? If so please providedetails

    Do you run or have installed on Outlook any third party app orcom add-ins? If so please provide details

    As Orla requires Admin Rights to install, can we have Adminaccess on the day?

    Can your organization provide a spare test PC to use located on

  • 8/14/2019 Client Plan 2007 28 11

    3/5

    ContactsPlease ensure that a Project Coordinator has been designated in case of the Project Sponsor's absence

    Client Contacts

    Name Position Contact Number Contact e-mail Role on Project

    Project Sponsor

    Project Coordinator

    Technical Representative

    Orla Contacts

    Name Position Contact Number Contact e-mail Role on Project

    Account Manager

    Project Manager

  • 8/14/2019 Client Plan 2007 28 11

    4/5

    Feasibility Study Timetable

    Step No. Step Name Description Client Responsibility Deliverable Target Date

    1.1 1-2-3 Meeting Prepared as requested First draft of Client Plan D-14

    1.2 Trial Installation D-14

    1.3 Scheduling D-12

    1.4 Client Sign off of Client Plan Client to sign off on the Client Plan D-3

    1.5 Installation Full installation Successful installation D-2

    2.1 Group Presentation Group Introductory Presentation All Participants attend D

    2.2 Personal Workshops All Participants attend D

    Follow-up 3.1 Clinic #1 All Participants attend D+1

    3.2 Ongoing Support Ongoing

    3.3 Clinic #2 All Participants attend D+7

    3.4 Day 15 Survey A 2 minute online survey All surveys complete D+14

    3.5 Feasibility Study Workshop Feedback gathered D+18

    Next Steps 4.1 Next Steps Meeting TBD

    ImplementationPreparation

    Meeting between the Orla andClient Teams

    Trial installation to ensure possible

    problems are minimised

    Ensure Tech

    Representative ispresent

    Full testing of the Clients'

    Operating Environment

    Participants are scheduled for all 4Learning Sessions

    Registers are completedand returned to theProject Manager

    Completed LearningRegisters

    Review the Client Planand sign off afterincorporation of anyfinal comments

    Clients' approval tocontinue with theImplementation

    Ensure all requirementsare met

    Installation andLearning Session

    Every scheduledParticipant attends thefull presentation

    1 hour sessions between eachParticipant and an Orla Organizerat the Participant's desk

    Participants areavailable at theirScheduled time

    Individaul 20 minute on-siteWorkshops

    Ensure users areavailable at theirscheduled time

    Support is available to allParticipants via the website andthrough the Project Manager

    Forward any urgentqueries to ProjectManager

    Any issues are loggedand dealt with by theOrla Team

    Individaul 20 minute on-siteWorkshops

    Ensure users areavailable at theirscheduled time

    Ensure all Participantscomplete the survey

    A Workshop between the OrlaTeam and Feasibility Study Groupto assess Orla

    Ensure as manyParticipants as possibleoffer feedback

    A Meeting between the Client andOrla Account Manager to discussNext Steps

    Ensure meeting isattended byrecommendedindividuals

    Decision on the NextSteps with Orla

  • 8/14/2019 Client Plan 2007 28 11

    5/5

    Facility RequirementsPlease indicate if the listed requirements are available as they may affect the comfort of the Participants and the Orla Organizers

    Area Requirement Yes/No Comments

    Training Room Seating for 4 Participants

    Space for 2 Organizers at front of roomTable for Organizers

    Projector

    Projector screen or blank wall

    Airconditioning/ventilation

    Appropriate lighting

    Organizers' Break Out Area An area to take refreshments

    Participants' Workstations Quiet, interruption free location

    Space for 1 Organizer

    Chair for Organizer

    Are all Participants in the same location?