![Page 1: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/1.jpg)
Intercem WorkshopsCEMENT TERMINAL STORAGE
Presented byTim Harvey, P.E.
River Consulting, LLC
Columbus, Ohio
6-7 December 2006
Tremont House, Galveston, Texas
![Page 2: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/2.jpg)
www.riverconsulting.com
Cement Storage Outline
• Cement Storage Types– Common storage vessels at terminals
• Cement Storage Considerations– Factors that influence storage choice
• Storage Type Comparisons– Pros and Cons for the various types
• Case Study– Houston Cement
• Conclusion
![Page 3: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/3.jpg)
www.riverconsulting.com
Cement Storage Types
• Concrete Domes• Concrete Silos• Steel Tanks• Warehouse Buildings• Floating Storage Vessels
![Page 4: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/4.jpg)
www.riverconsulting.com
Cement Storage Considerations
• Required Storage Volume– Ship Size Availability– Ship Draft Requirements– Loadout and Sales Schedule
• Real Estate Influence– Land Value and availability– Rail and roadway availability– Topography and elevation to structures
![Page 5: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/5.jpg)
www.riverconsulting.com
Cement Storage Considerations
• Product or Products Stored– Number of products– Volume of Each– Contamination
• Foundation/Geotechnical Issues– Terminals often at ports, rivers, reclaimed or alluvial soils– Deep foundations often required– Seismic factors and risk
• Cost and Schedule Issues– Capital costs– Operating costs– Urgency of Construction
![Page 6: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/6.jpg)
www.riverconsulting.com
Cement Storage Considerations
• Equipment Influence– Ship Unloader rate– Cement Transfer Rate– Pneumatic System Volume/Pressure
• Loadout/Shipping Systems– Rail and/or truck loadout systems and rates– Loadout bin volume
• Construction Issues– Union versus non-union construction– Labor availability– Material availability
![Page 7: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/7.jpg)
www.riverconsulting.com
Concrete Domes
• Storage Volume 20,000to 100,000 Metric Tons
• Reinforced Shotcrete onAir Form Construction
• Ship to Dome to Truckterminal shown
![Page 8: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/8.jpg)
www.riverconsulting.com
Concrete Domes
![Page 9: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/9.jpg)
www.riverconsulting.com
Concrete Domes
• Hemispherical Shapeor Cylinder withTop Hemisphere
• Reclaim typically byinterior screw auger or aerated floor.
• Rail and Ship to Dome to Truck and Rail terminal shown.
![Page 10: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/10.jpg)
www.riverconsulting.com
Concrete Domes
![Page 11: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/11.jpg)
www.riverconsulting.com
Concrete Domes
• Historically costeffective construction
• Low ratio of dead loadto live load
• Low profile, small seismic influence• California Terminal shown
![Page 12: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/12.jpg)
www.riverconsulting.com
Concrete Domes
![Page 13: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/13.jpg)
www.riverconsulting.com
Concrete Domes
• Typically limited to oneproduct
• Reclaim systems aretypically mechanicallyintensive with significant power demand
• Independent loadout Bins typically required.• Ship to dome to truck and barge terminal shown.
![Page 14: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/14.jpg)
www.riverconsulting.com
Concrete Domes
![Page 15: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/15.jpg)
www.riverconsulting.com
Concrete Silos
• Typically Cylindrical, butVarious shapes andcombinations are possible
• Slip form or jumpForm Construction
• Reinforced orprestressed concreteconstruction
![Page 16: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/16.jpg)
www.riverconsulting.com
Concrete Silos
• Conical Hopperstypical for flowwith aeration.
• Elevated Storagefor direct loadout
• Simple cylinders andmulti-cell construction
![Page 17: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/17.jpg)
www.riverconsulting.com
Concrete Silos
• Site specific construction– Adaptable, but.....– At a cost
• Small footprint• Flexible storage for
Multiple products andtransfer possibilities
![Page 18: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/18.jpg)
www.riverconsulting.com
Concrete Silos
• Historically more costly($ per ton) than others
• Large ratio of dead loadto live load, adds to foundation costs
• Heavy, often tall andslender – seismic influence
![Page 19: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/19.jpg)
www.riverconsulting.com
Steel Tanks
• Cylindrical Shapes• Welded or Bolted
construction• Prefabricated
Components• 5,000 and 2,000
metric ton bins shown
![Page 20: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/20.jpg)
www.riverconsulting.com
Steel Tanks
• Small size limitsuse at large importterminals
• Interior pressureand roof loadlimitations
• 1500 metric ton binsshown here underconstruction
![Page 21: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/21.jpg)
www.riverconsulting.com
Warehouse Buildings
• Relatively lowcapital costs
• Multiple buildingshell constructionpossibilities
• Low unit soil bearing pressures
![Page 22: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/22.jpg)
www.riverconsulting.com
Warehouse Buildings
• Internal compartments possible• Rapid construction possibilities• Possible use/conversion of existing
structures• Independent loadout required
![Page 23: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/23.jpg)
www.riverconsulting.com
![Page 24: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/24.jpg)
www.riverconsulting.com
Warehouse Buildings
![Page 25: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/25.jpg)
www.riverconsulting.com
Warehouse Buildings
• Filling and distribution equipment can be as simple or complex as desired
• Reclaim equipment can be as simple or complex as desired.
• Reclaim typically accomplished using a combination ofmobile and fixed equipment
• Limited cement pile height for worker safety• Dust and visibility• Large footprint required for large storage volumes
![Page 26: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/26.jpg)
www.riverconsulting.com
![Page 27: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/27.jpg)
www.riverconsulting.com
![Page 28: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/28.jpg)
www.riverconsulting.com
Floating Storage
• Ships and Barges• Limited on-shore
facilities required• Can be relocated
as needs changeor facilities expand
• Aerated and mechanicalreclaim
• Off-site construction advantages
![Page 29: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/29.jpg)
www.riverconsulting.com
Floating Storage
• Typically smallstorage volumes
• Large energy andmaintenance costs
• Independent loadoutfacilities required
• Limited use today
![Page 30: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/30.jpg)
www.riverconsulting.com
Case Study
• 100,000 metric tons of cement storage required• Dome and Silo Storage considered• Three truck loadout lanes required, with future rail and
truck loadouts desired• Deep Foundations required for domes or silos• Large land area available• Design-build project methodology. River Consulting and
Continental Construction of Memphis TN joined to pursue the project.
![Page 31: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/31.jpg)
www.riverconsulting.com
Preliminary Dome Scheme
![Page 32: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/32.jpg)
www.riverconsulting.com
Preliminary Silo Scheme
![Page 33: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/33.jpg)
www.riverconsulting.com
Final Site Plan
![Page 34: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/34.jpg)
www.riverconsulting.com
Case Study Considerations
• Cement Storage Types– Domes with screw auger reclaimers and Independent
loadout bins– Silo Group with elevated conical hoppers and direct
truck loadout• Storage Comparisons
– Both schemes developed by design-build team– Mechanical equipment layout and pricing developed– Electrical equipment and demands developed– Structures and foundations estimated
![Page 35: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/35.jpg)
www.riverconsulting.com
Case Study Considerations• Conclusions
– The silo scheme total project cost was greater than the total project cost of the dome scheme by less than 5%.
– The dome scheme electrical power demand was significantly greater than the silo scheme over the expected life of the facility.
• Outcome– The silo scheme was presented to the Owner for
consideration– The Owner elected to use the silo scheme, citing the
flexibility advantages of the group of six silos with a relatively small additional cost.
![Page 36: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/36.jpg)
www.riverconsulting.com
Project Construction View
![Page 37: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/37.jpg)
www.riverconsulting.com
Project Construction View
![Page 38: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/38.jpg)
www.riverconsulting.com
Project Construction View
![Page 39: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/39.jpg)
www.riverconsulting.com
Cement Storage Conclusions
• There is no one “right” answer. For the case study presented, the flexibility of the silo option was worth the increased cost to the owner.
• Storage choice depends upon many factors. Do not jump to a conclusion as to the preferable type for your terminal.
• Construction technologies and costs change more quickly than we sometimes think. Your “best” choice ten years ago may not be your optimum choice today.
• Consider both your short term and long term costs and needs. Where will your business be in five years? In twenty years?
• We have yet to have an owner tell us that they have too much storage!
![Page 40: Click to add title - Cement Distributioncementdistribution.com/wp-content/uploads/2016/10/... · Top Hemisphere • Reclaim typically by ... construction • Prefabricated Components](https://reader035.vdocuments.us/reader035/viewer/2022081615/5fd623190a7d6f59495a26f9/html5/thumbnails/40.jpg)
Thank you for your attention.Enjoy the rest of the conference.
Cement Terminal StorageTim Harvey, P.E.
River Consulting, LLC
Columbus, Ohio
6-7 December 2006
Tremont House, Galveston, Texas