Plan
• Specific requirements for your system.
• Defines functionality.
• You sign it you buy it.
Design Specs
Plan
• Deployment timeline for deliverables.
• Meeting deliverable deadlines.
• PM has direct authority
Project Plan
Go Live
• Adoption rate.
• ROI (Cost Savings-Project Cost)
• Actual versus Budgeted Cost
• Payback period
• Time to go-live.
Key Performance Indicators
Best Practices Takeaways
Barcoding’s keys to a successful deployment.
• Develop a concise Statement of Work.
• Scrutinize the Requirements Document before signing-off.
• Give PM autonomy over the project.
• Anticipate bottlenecks and resolve quickly.
• Create measurable KPI’s to measure project success.
• Encourage collaboration, feedback, and strong communication at all
organizational levels.