CERT: Priority Group Flexibility Option
Emily FlattEnergy Efficiency Manager, Ofgem
4th September 2007
![Page 2: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/2.jpg)
2
Why do we need the PG flexibility option?
• Increases options for suppliers to reach their CERT Priority Group obligations
• Attempts to targets a portion of PG activity to the most fuel poor in this group
![Page 3: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/3.jpg)
3
What is it?
• The transfer of a capped percentage of a suppliers target from PG to non PG in return for undertaking additional fuel poverty activity (details coming later)
• Extent of fuel poverty action determined by notional cost saving of transferring activity from PG to non PG
• Translation factor applied to convert the carbon transferred into number of fuel poverty measures
![Page 4: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/4.jpg)
4
Eligible Fuel Poverty measures
Solid wall insulation
Biomass boilers (under consideration)
Ground source heat pumps
![Page 5: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/5.jpg)
5
Eligible Fuel Poverty recipients
Recipients
A subgroup of the PG attempting to identify the fuel poor
These are:
• Not in social housing ie home owners
• Off the gas grid
![Page 6: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/6.jpg)
6
Using the mechanism
• Proposed that suppliers apply as a normal scheme, on application pro forma
• Applications will include: (I will go into this in more detail later with a worked example)
• % reduction sought
• Carbon equivalent of this
• Which fuel poverty measures will be used
• Approval will be granted if all the required info is provided and is correct.
• (Any Qs at this point)
![Page 7: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/7.jpg)
7
A word about terminology…
• ‘relevant reduction’ = carbon equivalent of the % reduction in the PG target
• ‘specified reduction’ = carbon savings from fuel poverty measures (determined by translation factor)
THESE WILL HAVE THE SAME VALUE!
![Page 8: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/8.jpg)
8
Worked example of application (1)
• Supplier x has a carbon obligation of 10,000 tC
• PG obligation of 4,000 tC
• Wants to switch 5% of their obligation from the PG to the non PG
• 5% = 500 tC
• New PG obligation would be 3,500 tC
• New non PG obligation would be 6,500 tC
• Overall obligation remains 10,000 tC
• 500tC to be achieved through fuel poverty measures
![Page 9: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/9.jpg)
9
Worked example of application (2)
The application must include:
• % reduction of overall obligation = 5%
• Relevant reduction = 500tC
• Specified reduction = 500tC
• Which fuel poverty measures will be used = eg solid wall insulation
• How overall obligation will be achieved = brief written summary of supplier’s other schemes
![Page 10: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/10.jpg)
10
To determine the number of fuel poverty measures needed:
Specified reduction = number of fuel poverty measures neededtranslation factor eg 50
Specified reduction = 500tC
500 = 10 fuel poverty measures needed 50
![Page 11: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/11.jpg)
11
Supplier x obligation illustrated
0 2,000 4,000 6,000 8,000 10,000 12,000
With PG flex.
Initial obligation
tC
non- PG
PG
Plus fuel poverty activity
![Page 12: CERT: Priority Group Flexibility Option Emily Flatt Energy Efficiency Manager, Ofgem 4 th September 2007](https://reader035.vdocuments.us/reader035/viewer/2022062511/551b2e955503465c7e8b47f6/html5/thumbnails/12.jpg)
12