By: Ashish Sinha Nithin H S Pratik Tilak Ramakrishna Anantha
-
7/27/2019 Centralized System for Traffic Control
2/59
Objectives of Our ProjectReducing Traffic density in GangwaysCreating a centralized system in order to improve
traffic condition.
-
7/27/2019 Centralized System for Traffic Control
3/59
Root causes for Traffic Jam
-
7/27/2019 Centralized System for Traffic Control
4/59
Problem 1Under utilized gangway between engine Jundate and
engine sub assembly lineRoot Cause:Tow motor is being parked in that gangway, whiledriver is fixing hose pipes for engine.
Solutions:Shifting the parking place and inventory shelf
towards engine sub assembly line.Benefits:Diversion of Chassis frame tow motor and engine sub
assembly line supplies to weld shop gangway throughthis route.
-
7/27/2019 Centralized System for Traffic Control
5/59
36503900
Present Situation
Gangway is blocked by the parking of Tow motor
Engine Jundate
Tow motor with engine
chorokyu
Pneumatic cylinder
-
7/27/2019 Centralized System for Traffic Control
6/59
-
7/27/2019 Centralized System for Traffic Control
7/59
-
7/27/2019 Centralized System for Traffic Control
8/59
-
7/27/2019 Centralized System for Traffic Control
9/59
-
7/27/2019 Centralized System for Traffic Control
10/59
-
7/27/2019 Centralized System for Traffic Control
11/59
Tow motor with engine
chorokyu
Proposed Idea
Pneumatic cylinderEngine Jundate
-
7/27/2019 Centralized System for Traffic Control
12/59
Problem -2Parking of Dollies near IP Sub assembly line obstructing the
gangway 1Root CauseThere is no space available for dollies while
replenishing the stock.SolutionIntroducing Set Pallet System for IP sub assembly line.BenefitsIt will remove traffic congestion near IP sub assembly line.
-
7/27/2019 Centralized System for Traffic Control
13/59
-
7/27/2019 Centralized System for Traffic Control
14/59
-
7/27/2019 Centralized System for Traffic Control
15/59
-
7/27/2019 Centralized System for Traffic Control
16/59
-
7/27/2019 Centralized System for Traffic Control
17/59
Problem - 3Parking of Dollies near Engine Sub assembly line
obstructing the weld shop Gangway Root CauseThere is no space available for dollies while
replenishing the stock.SolutionIntroducing Set Pallet System for Engine sub assembly line.
BenefitsIt will remove traffic congestion near Engine subassembly line.
-
7/27/2019 Centralized System for Traffic Control
18/59
-
7/27/2019 Centralized System for Traffic Control
19/59
-
7/27/2019 Centralized System for Traffic Control
20/59
Kaizen -1
Increasing the Rear Axle lot size from 4 to 5
Number of movements can be reduced are - 19
Increased movement of Assembly line employee is- 30 cms
-
7/27/2019 Centralized System for Traffic Control
21/59
-
7/27/2019 Centralized System for Traffic Control
22/59
-
7/27/2019 Centralized System for Traffic Control
23/59
-
7/27/2019 Centralized System for Traffic Control
24/59
Kaizen -2Shifting the tow motor parking place which is
obstructing the traffic in the junction
-
7/27/2019 Centralized System for Traffic Control
25/59
-
7/27/2019 Centralized System for Traffic Control
26/59
-
7/27/2019 Centralized System for Traffic Control
27/59
Problem - 4Traffic Jam at JunctionsTo many tow motors are coming from differentdirection at the same time causing an average traffic
jam of 1.2 mins.
-
7/27/2019 Centralized System for Traffic Control
28/59
-
7/27/2019 Centralized System for Traffic Control
29/59
-
7/27/2019 Centralized System for Traffic Control
30/59
-
7/27/2019 Centralized System for Traffic Control
31/59
-
7/27/2019 Centralized System for Traffic Control
32/59
-
7/27/2019 Centralized System for Traffic Control
33/59
-
7/27/2019 Centralized System for Traffic Control
34/59
-
7/27/2019 Centralized System for Traffic Control
35/59
Centralized Inventory and Traffic monitoring system
Based on the real time inventory at assembly line each tow motor agent is assigned dynamically with a priority.The priority is completely automatic and it can be setmanually in the master centralized control unit by usingthe key pad and an LCD display.IR transmitter is installed on each Tow motor and IR receiver is installed on each road near the common
interface.The agent continuously transmits its ID code and when thetow motor approaches the common interface IR signalfrom the agent is detected by the road unit.
-
7/27/2019 Centralized System for Traffic Control
36/59
R l i I i l
-
7/27/2019 Centralized System for Traffic Control
37/59
Real time Inventory manipulator
-
7/27/2019 Centralized System for Traffic Control
38/59
Sensors used for finding out inventory at Assembly line
Ultrasonic SensorError 0.5 cms
Bending Beam Load SensorError 1% of its capacity
Motion sensor
Long range IR Proximity sensor
-
7/27/2019 Centralized System for Traffic Control
39/59
Ultrasonic sensor: List of workstationsFortuner SPS dolly
CarpetRoof mouldWeighing sensor: List of workstations:Stabilizer barRear axle
Propeller shaftExhaust center pipeRadiatorProximity sensor: List of workstation:Tyre LHTyre RHMotion sensor: List of workstation:Modular dolly IP dolly Engine
-
7/27/2019 Centralized System for Traffic Control
40/59
Ultrasonic Sensor working Principle
Centralized system
-
7/27/2019 Centralized System for Traffic Control
41/59
-- Tow motor
-- Base station
-- Zig bee Transreceiver
-- Micro processor
-- EEPROM
2 0 m
t s Real timeinventory data
-
7/27/2019 Centralized System for Traffic Control
42/59
Centralized system
Real timeinventory data
Inventory atassembly line
-
7/27/2019 Centralized System for Traffic Control
43/59
1 234
Real timeinventory data
-
7/27/2019 Centralized System for Traffic Control
44/59
12345
Real timeinventory data
-
7/27/2019 Centralized System for Traffic Control
45/59
-
7/27/2019 Centralized System for Traffic Control
46/59
SPS
1. Tow motor moves from SPS to A/S line for part delivery,
2. Tow motor waiting in A/S line for part delivery ,
3. First tow motor inform the Second Tow motor to stop nearSPS until it inventory get consumed to fixed quantity ,
The parking of Tow motors can be eliminated with propercommunication between two tow motors.
Proper Communication Between tow motors
-
7/27/2019 Centralized System for Traffic Control
47/59
-
7/27/2019 Centralized System for Traffic Control
48/59
-
7/27/2019 Centralized System for Traffic Control
49/59
-
7/27/2019 Centralized System for Traffic Control
50/59
BenefitsLow cost and efficient systemLong range sensors
Reprogrammable cmosIt can minimize traffic Jam with real time dataReduction of traffic congestion at each junction.Proper information sharing between tow motors.
-
7/27/2019 Centralized System for Traffic Control
51/59
-
7/27/2019 Centralized System for Traffic Control
52/59
Estimated project cost for one junction
Centralized Unit:Cost: Rs.15,000/unit
Vehicle Unit:
No. of tow motors: 14Total cost per unit :Rs.7,000Total cost : Rs.98,000
Road Unit:
No. of road units required=3Total cost per unit= Rs.4,500Total cost: 4500*3= Rs.13,500
Total cost for this junction= Rs.1,26,500
-
7/27/2019 Centralized System for Traffic Control
53/59
-
7/27/2019 Centralized System for Traffic Control
54/59
a) Ultrasonic sensor: List of workstations:Fortuner SPS dolly CarpetRoof mould
Estimated cost for using Ultrasonic sensor:No. of sensors= 3Cost per sensor= Rs.1,100Total cost= 1100*3= Rs.3,300
Estimated cost of Real Time Inventory system
-
7/27/2019 Centralized System for Traffic Control
55/59
b) Weighing sensor: List of workstations:Stabilizer barRear axlePropeller shaft
Exhaust center pipeRadiator
Estimated cost for using Weighing sensor:No. of sensors per workstation= 4Cost per sensor= Rs.5,000
Junction box= Rs.6,000Total cost per workstation= Rs.26,000
Total no. of workstations= 5
Total cost required= 5 * 26000= Rs.1,30,000
Estimated cost of Real Time Inventory system
-
7/27/2019 Centralized System for Traffic Control
56/59
c) Motion sensor: List of workstation:Modular dolly IP dolly
Engine
Estimated cost for using Motion sensor:No. of sensors per workstation= 2Cost per sensor= Rs.2,500
Total cost per workstation= 2*2500= Rs.5,000
Total no. of workstations= 3
Total cost required= 3*5000= Rs.15,000
Estimated cost of Real Time Inventory system
-
7/27/2019 Centralized System for Traffic Control
57/59
d) Proximity sensor: List of workstation:Tyre LHTyre RH
Estimated cost for using Proximity sensor: No. of sensors required in each workstation : Tyre LH= 15Tyre RH= 10
Cost per sensor= Rs.500No. of sensors required= 25
Total cost required= 25*500= Rs.12,500
Estimated cost of Real Time Inventory system
-
7/27/2019 Centralized System for Traffic Control
58/59
-
7/27/2019 Centralized System for Traffic Control
59/59
Thank you