Download - Caythorpe Gas Storage Project
![Page 1: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/1.jpg)
Caythorpe Gas Storage ProjectLiaison Committee Meeting28th September 2009
![Page 2: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/2.jpg)
Caythorpe Liaison Committee 28th September 20092
Agenda
• Project Status Report – September 2009
• Archaeological site investigation
• Bridge design
• Seismic survey
• Traffic management plan
• Ongoing community liaison
• Environmental support fund
• Activities on site within coming weeks / months
• Questions
![Page 3: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/3.jpg)
Caythorpe Liaison Committee 28th September 20093
Health, Safety & Environment
• No on or off site complaints (to date)
• No on or off environmental impacts (to date)
• No accidents, incidents or near misses to report (to date)
• Project working under the “Construction Design & Management
Regulations” regulated by the Health & Safety Executive
• Site visit by HSE Construction Division 27th August. No issues of
concern raised
• Baseline noise survey completed August 2009 and issued to ERYC
• Noise, Vibration, Dust Management and Monitoring Scheme submitted
to ERYC (in accordance with planning conditions)
![Page 4: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/4.jpg)
Caythorpe Liaison Committee 28th September 20094
Current Status
• Demolition of existing equipment completed in June
• Archaeological site investigation ongoing
• Geotechnical site investigations
![Page 5: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/5.jpg)
Caythorpe Liaison Committee 28th September 20095
Archaeological Site Investigation
• Located on the margins of a settlement occupied in the late Iron Age,
Roman and early Anglo-Saxon periods (about 200BC to AD700)
![Page 6: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/6.jpg)
Caythorpe Liaison Committee 28th September 20096
Archaeological Site Investigation
![Page 7: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/7.jpg)
Caythorpe Liaison Committee 28th September 20097
Archaeological Site Investigation
![Page 8: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/8.jpg)
Caythorpe Liaison Committee 28th September 20098
Invitation to an Archaeological Site Visit
• Liaison Committee Saturday 10th October
• Boynton School w/c 12th October
![Page 9: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/9.jpg)
Caythorpe Liaison Committee 28th September 20099
Bridge Crossing of Gypsey Race
• Would like to install October/November 2009 but may delay until Spring
2010
• Design approved by the Environment Agency
• Ecological surveys on river ongoing
![Page 10: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/10.jpg)
Caythorpe Liaison Committee 28th September 200910
Bridge Crossing of Gypsey Race – Existing View
![Page 11: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/11.jpg)
Caythorpe Liaison Committee 28th September 200911
Bridge Crossing of Gypsey Race – Proposed View
![Page 12: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/12.jpg)
Caythorpe Liaison Committee 28th September 200912
Water Voles
• Water Vole is a protected species and
present on the Gypsey Race including
location of bridge crossing
• Ongoing daily surveys on the river
• Habitat management to encourage
voles to move along the river
• Fallback option is to move the voles
under licence from Natural England
• Ecological Mitigation & Monitoring
Strategy submitted to ERYC (in
accordance with planning condition)
![Page 13: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/13.jpg)
Caythorpe Liaison Committee 28th September 200913
Seismic Survey
• Seismic survey underway, due to
complete mid November
• 7 day/week operation.
• Mitigation measures in place to avoid
damage to land and protect
archaeology and ecology
• Vibration monitoring at residential
properties
![Page 14: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/14.jpg)
Caythorpe Liaison Committee 28th September 200914
Seismic Survey – Notification to Residents
![Page 15: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/15.jpg)
Caythorpe Liaison Committee 28th September 200915
Seismic Survey – Notification to Residents
![Page 16: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/16.jpg)
Caythorpe Liaison Committee 28th September 200916
Construction Traffic Management Plan
![Page 17: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/17.jpg)
Caythorpe Liaison Committee 28th September 200917
Construction Traffic Management Plan
![Page 18: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/18.jpg)
Caythorpe Liaison Committee 28th September 200918
Environmental Support Fund
The Fund will be structured into two elements:
• An initial one-off sum of £150,000 which is available up until the completion of construction of the project (2012); and
• An ongoing annual budget of £5,000 as per the Warwick Energy agreement with ERYC (over the 24 year lifespan of the planning permission this equates to £120,000)
• The allocation of monies will be subject to applications to the Liaison Committee in accordance with published guidelines
![Page 19: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/19.jpg)
Caythorpe Liaison Committee 28th September 200919
Future Activity October-December 2009
• Completion of seismic survey by mid November
• Completion of archaeological site works for this season (with remainder of work to be done in spring)
• Moving of water voles if habitat management unsuccessful
• Construction of bridge and access road (although may be delayed until spring)
![Page 20: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/20.jpg)
Caythorpe Liaison Committee 28th September 200920
Point of contact for seismic survey
IMC Geophysics International Ltd
c/o Garland Total Vehicle SolutionsLancaster RoadCarnaby Industrial EstateCarnabyBridlingtonYO15 3QY
Tel: 07810 855318
![Page 21: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/21.jpg)
Caythorpe Liaison Committee 28th September 200921
Points of contact for project
Paul Dacombe
Consents & Licencing Manager
Caythorpe Gas Storage Project
Centrica plc
Millstream West
Maidenhead Road
Windsor
Berkshire
SL4 5GD
Mobile 07789 570416
Justin Kenyon
Site HSE Manager
Caythorpe Gas Storage Limited
Caythorpe Well Site
Rudston
Driffield
YO25 4JD
Site Office 01262 420177
Mobile 07904200995
• Project Website
![Page 22: Caythorpe Gas Storage Project](https://reader035.vdocuments.us/reader035/viewer/2022062305/56814e44550346895dbbbadd/html5/thumbnails/22.jpg)
Caythorpe Liaison Committee 28th September 200922
Questions?