Download - Case Study Team 2
![Page 1: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/1.jpg)
Case StudyENG4118D
2014-2015
![Page 2: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/2.jpg)
Group Members Apostolos Makantasis UoB:11017757 Despina Yiannopoulou UoB:10029977 Asimina Tzempetzi UoB:11006290 Azza AL-Mamari UoB:14009718 Hana Hamad UoB:14001674
![Page 3: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/3.jpg)
IntroductionBradford City: Cultural Centre City of Unesco as City of Film One of Largest Urban Areas in UK Industrial Area
![Page 4: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/4.jpg)
Flood Problems It is well known that town center and surrounding areas
have problem with floods For that reason our team proposes a scheme with
several mountable or permanent solutions for local and non local area
![Page 5: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/5.jpg)
Tank-Reservoir Location : Bolton Woods (area with no underground utilities, safe construction)
![Page 6: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/6.jpg)
Tank-Reservoir (cont) Characteristics: dimensions of the reservoir are 180m
length, 190m width, 12m height. Covering area: 34200m² , capacity:410400 m³
![Page 7: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/7.jpg)
Tank-Reservoir (cont) Material: Main material used is concrete (beneficial use in case of reservoir-tank, corrosion
resistance, strength in compression, low maintenance)Approximate Cost: An approximate figure of the cost is £3,330,000 (Taking
into account the excavation ,the material used –pipes/concrete)
Maintenance cost is approximately around £1500 for every 5-10years
![Page 8: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/8.jpg)
Prevent of Flooding's Change the Combine System into-Separated Sewer System
WHY ?
Prevent an overflow of the river Recycled rainwater for further uses There is no problem in terms of the discharging
industrial wastewater Reduced the health risks Eliminated the bad smell Approximate Cost:£5,000,000Maintenance of the drainage system(Cleaning) Approximate Cost:£500,000
![Page 9: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/9.jpg)
Prevent of Flooding'sCanal Road – Bradford Beck Flood Defence Embankments: Approximate Cost: £240,000 Permanent Demountable Barriers: Approximate Cost: £840,000
![Page 10: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/10.jpg)
Sustainable Management Techniques Cycle pathFor 4.5 Km from Westfield to the end of Bradford Beck Plants all over the site Approximate Cost: £900,000
![Page 11: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/11.jpg)
Sustainable Management TechniquesPermeable Parking (SUDS) Location: Forster Square Parking Area: 23,000 m²
![Page 12: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/12.jpg)
Sustainable Management TechniquesFlexi Pave Eco-friendly Bonded with polyurethane Allows the water to drain directly into the ground Porous can absorb and reduce the amount of rainfall’s
waterApproximate Cost: £2,000,000
![Page 13: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/13.jpg)
Sustainable Management Techniques What should be done inside the city centre ?1. Green roofs.2. Green streets. Why?• Combating Runoff and flooding by absorbing and
filtering the rainwater• Improve building aesthetics• Improving Bradford’s street scene and public realm• Improve air quality• Local job creation• Extending roof life• Preventing Leaks• Reducing energy demands
![Page 14: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/14.jpg)
Sustainable Management Techniques
1. Green roofs: Components of Green roofs: A waterproofing layer A drainage and a filter layer Soil Plants
The recommended type of plants:• Sedum (stonecrop) • Delosperma (ice plant).
Sedum Delosperma
![Page 15: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/15.jpg)
Sustainable Management Techniques Total Area = 23500 Approximate Cost: £1,200,000
![Page 16: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/16.jpg)
Sustainable Management Techniques
Types of Trees : Ginkgo BilobaProperties: Moderate growth and water need Resistant to pests and pollution.
According to Victoria Business Improvement District:
• 1225 street trees can divert up to 112,400 m³ of storm water runoff from the local sewer systems every year.
• Carbon and energy saving are estimated by £49,000
2. Green streets:
![Page 17: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/17.jpg)
Sustainable Management Techniques
Sun bridge Road & Broadway Street• Length =500 m• Cost :£90,000 to £ 120,000 for 150 to 200 trees
![Page 18: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/18.jpg)
Multi - Purpose Building Location and Facilities Sustainable Techniques Building materials Approximate cost
![Page 19: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/19.jpg)
Location
![Page 20: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/20.jpg)
Facilities Book storeCinema
Multi-Purpose hall
Cafes
Nursery
Night
clubAdvice Centre
Shops
![Page 21: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/21.jpg)
Building materials
![Page 22: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/22.jpg)
Sustainable Techniques
![Page 23: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/23.jpg)
Approximate cost For a building of 50 m X 55 m 21 storyThe approximate cost is £10,000,000
![Page 24: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/24.jpg)
![Page 25: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/25.jpg)
New city parkLocationWhy?
City centre redevelopment Easy access Close to university Close to Forster square station Close to Westfield shopping centre Help the flooding problem in the centre
![Page 26: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/26.jpg)
Skate parkAims: Bradford is a student city so
a park including a skate park seems to be necessary
Skate parks can also help to reduce storm water
Combine a modern problem with modern obsession
Include: Water harvesting systems 4 basins
Materials: Concrete Long term solution Minimal maintenance Ideal for rainy cities like
Bradford Perfect surface Steel Grind edges, rails
![Page 27: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/27.jpg)
Broadway Park
![Page 28: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/28.jpg)
Broadway Park Walking pathways Trees, vegetation Fountain Snack - Coffee House Lakes Playground Mini - golfCost:The cost for the park without water - electricity Supplies will be approximately £1,500,000
![Page 29: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/29.jpg)
Broadway Park
A Small Video Presentation showing the Broadway Park
![Page 30: Case Study Team 2](https://reader034.vdocuments.us/reader034/viewer/2022042611/587c67641a28ab633c8b7051/html5/thumbnails/30.jpg)
Thank you for your Attention!Any Questions ?